International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7C  C 

ITU-R WP7C

Remote Sensing Systems

Results:275 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 275 ]  
 
2011-11-18 WP 5C   Liaison statement to Working Parties 4C, 5D and 7C - Status of studies on the harmonization/rationalization of frequency bands/tuning ranges for cross-border deployment of electronic news gathering (ENG) systems     N/A  
[ 274 ]  
 
2011-11-17 WP 5C   Liaison statement to Working Parties 7C and 7D - Coexistence between fixed service operating in 71-76 GHz, 81-86 GHz and 92-94 GHz bands and -passive services     N/A  
[ 273 ]  
 
2011-11-16 WP 5C   Liaison statement to Working Parties 3M, 4A, 5A, 5B, 7B and 7C - Studies in support of WRC-12 Agenda item 1.20     N/A  
[ 272 ]  
 
2011-11-16 WP 5C   Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Draft revision of Recommendation ITU-R F.758-4     N/A  
[ 271 ]  
 
2011-11-16 WP 5C   Liaison statement to Working Parties 5B, 7C and 7D - Draft revision of Report ITU-R F.2107-1 - Characteristics and applications of fixed wireless systems operating in frequency ranges between 57 GHz and 134 GHz     N/A  
[ 270 ]  
 
2011-11-03 BR Study Group Department   ITU-R Study Group 1 Recommendation to be brought to the attention of Study Groups 4, 5, 6 and 7     N/A  
[ 269 ]  
 
2011-10-31 SG 3   Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Handbook on "Propagation information for the prediction of interference and coordination distance"     N/A  
[ 268 ]  
+Ann.1-11 
2011-10-03 Chairman, WP 7C   Report of the meeting of Working Party 7C - (Geneva, 26-30 September 2011)     N/A  
[ 267 ]  
 
2011-09-30 Director, BR   Final List of Participants - Working Party 7C (Geneva, 26-30 September 2011)     N/A  
[ 266 ]  
 
2011-09-29 WP 4A   Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Party 1A) - A database for the protection of radio services     N/A  
[ 265 ]  
 
2011-09-26 WP 4C   Liaison statement to Working Party 7C - Updated documents on pulsed interference to RNSS receivers     N/A  
[ 264 ]  
 
2011-09-28 WP 4C   Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working parties 1A, 4A) - A database for the protection of radio services     N/A  
[ 263 ]  
 
2011-09-23 BR Study Group Department   List of documents issued     N/A  
[ 262 ]  
 
2011-09-19 United Kingdom of Great Britain and Northern Ireland   Sharing studies between EESS (passive) and fixed service in the band 31.5-31.8 GHz     232/7  
[ 261 ]  
 
2011-09-19 Korea (Republic of)   Draft revision of Recommendation ITU-R RS.515-4 - Frequency bands and bandwidths used for satellite passive remote sensing     N/A  
[ 260 ]  
 
2011-09-15 United States of America   Proposed modifications to Annex 3 of Doc. 7C/214 - PDR of Recommendation ITU-R RS.1347 - Feasibility of sharing between radionavigation-satellite service receivers and the Earth exploration-satellite (active) and space research (active) services in the 1 215-1 300 MHz band     N/A  
[ 259 ]  
 
2011-09-15 United States of America   Draft new Report ITU-R RS.[3.15 GHZ SHARE] - Sharing the 31.5-31.8 GHz band by the fixed and mobile services and the Earth exploration-satellite service (passive)     232-1/7  
[ 258 ]  
 
2011-09-15 United States of America   Draft liaison statement to ITU-R Working Party 5C - Studies regarding WRC-12 Agenda item 1.8 involving FS OOB emissions into EESS (passive) systems in the 86-92 GHz band     129-2/7  
[ 257 ]  
 
2011-09-15 United States of America   Draft liaison statement to ITU-R Working Party 5C - Studies regarding WRC-12 Agenda item 1.20 involving EESS (passive) and HAPS gateway stations     N/A  
[ 256 ]  
 
2011-09-15 United States of America   Working document towards a preliminary draft new Report - Potential interference between the Earth exploration satellite (active) and space research (active) in the 1 215-1 300 MHz and the Air-Route surveillance radars in the 1 215-1 400 MHz band     N/A  
[ 255 ]  
 
2011-09-15 United States of America   Potential impact to EESS (passive) systems operating near 6 GHz from HAPS gateway systems     N/A  
[ 254 ]  
 
2011-09-15 United States of America   Evaluation of fixed service OOB interference to EESS (passive) systems in 86-92 GHz     129-2/7  
[ 253 ]  
 
2011-09-15 United States of America   Working document toward a draft new Report RS.[MITIG_RNSS-EESS] "Compatibility measurements and possible mitigation measures between EESS (active) systems and RNSS systems in the band 1 215-1 300 MHz"     288/4, 217-2/4  
[ 252 ]  
 
2011-09-15 United States of America   Typical technical and operating characteristics and preferred frequency bands of spaceborne radar sounder systems in EESS (active)     N/A  
[ 251 ]  
 
2011-09-15 United States of America   Draft liaison statement to ITU-D Study Group 2 and the World Meteorological Organization - Additional information in support of ITU-D Study Group 2 Question 22-1/2     N/A  
Results:275 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2011-09-21