Webcast Archive

Start date Sort ascending Title (Room)
(UTC +1)
5. Open standards for AI data center infrastructure built up – Nokia (Virtual Room TSB)
(UTC +1)
4.Applying neuro-symbolic AI to enhance dynamic trust assessment and policy enforcement in a 6G zero trust architecture – Futurewei Technologies (Virtual Room TSB)
(UTC +1)
2. No 6G without AI, no AI without 6G – Ericsson (Virtual Room TSB)
(UTC +1)
1. Trust, rules, and reality - Advancing AI through policy, standards, and adoption – Cisco (Virtual Room TSB)
(UTC +1)
WP 4A status Plenary followed by SWG 4A3a – AI 1.5 (Room Popov)
(UTC +1)
WP 4A status Plenary (Room Popov)
(UTC +1)
STAFF GENERAL ASSEMBLY (Room K)
(UTC +1)
SG5: WP1, WP2 and WP3 Plenaries (Room C)
(UTC +1)
SG5: Opening plenary (Room C)
(UTC +1)
WP 4B Closing Plenary (Room K)
(UTC +1)
SG13 Opening Plenary (Virtual Room TSB)
(UTC +1)
WP 4A Opening plenary (cont.) (Room Popov)
(UTC +1)
WP 4A Opening plenary (cont.) (Room Popov)
(UTC +1)
WP 4A Opening plenary (cont.) (Room Popov)
(UTC +1)
WP 4A Opening Plenary (Room Popov)
(UTC +1)
WP 4C Closing Plenary (if needed) (Room Popov)
(UTC +1)
WP 4C Closing Plenary (Room Popov)
(UTC +1)
WP 4C Closing Plenary (Room Popov)
(UTC +1)
SG15 (Room C)
(UTC +1)
WP 4B Opening Plenary (Room K)
(UTC +1)
WP 4C Plenary followed by SWG 4C1b – AI 1.13 (Room Popov)
(UTC +1)
SG21: Closing plenary (Room H)
(UTC +1)
WP 4C Plenary followed by SWG 4C1b 1.13 (Room Popov)
(UTC +1)
SG21: Closing plenary (Room H)
(UTC +1)
WP 5D Closing Plenary (Room Popov)