International Telecommunication Union   ITU
عربي  |  中文  |  Español  |  Français  |  Русский
 
 Advanced Search Advanced Search Site map Contact us Print version
  Home : ITU-R : Space Services : SNL : Bringing into use
Radiocommunication Sector (ITU-R)  
Bringing into use of satellite network frequency assignments 
Bringing into use of satellite network frequency assignments

This table gives information about the date of bringing into use of planned and non-planned satellite network frequency assignments.

This list displays all Notifications of satellite networks published in PART I-S, or published As received which have been confirmed brought into use.

The Bureau is also publishing bringing into use information submitted in conjunction with a submission under § 4.1.12/4.2.16 of Appendices 30 and 30A (Part B) or § 6.17 of Appendix 30B (A6B).

Please note that this table is for information only. The official confirmation of bringing into use is the publication in PART II-S of the BR  IFIC.

For more information about the procedure of bringing into use, please refer to the Circular letter CR/343. 

Meaning of the symbol in the column "Status":

  N : Not yet confirmed, the date in the column "Date of bringing into use" is the foreseen date
  I : Initial information on bringing into use
  C : Confirmed brought into use, No. 11.44B/11.44C/11.44D/11.44E conditions (as applicable) fulfilled.

For any comments or information,  please contact us 

Last update of the database: 12.09.2024 - The update is done normally every 2 weeks.

Your query :  All networks
Query the database  - Print version  - Explanations  - Export in txt format  - Export in Excel format 

Total line = 1600/3228
Go to page : 1234567891011121314151617
Satellite Name
(SNL Part B)
ADMORGLong_nomDate of bringing
into use
StatusExpiry Date for
Bringing Into Use
Provision
up down up down up down up down up down up down up down up down 
NUSANTARA-H1-A  INS  116.1 14.08.2023 C  11.2  
NUSANTARA-NS1-A  INS  113 18.10.2024 N 28.12.2024 11.2  
NUSANTARA-PE1-A  INS  146 30.03.2021 C  11.2  
NUSANTARA-PE1-A  INS  146 01.07.2024 N 05.11.2025 11.2  
NUSANTARA-SS1-A  INS  N-GSO 08.08.2025 N 28.09.2025 11.2  
INDOSTAR-110E  INS  108.2 01.01.2014 C  11.2  
INDOSTAR-110E-K  INS  108.2 01.11.2014 C  11.2  
GARUDA-2  INS  123 12.02.2000 C  11.2  
DOUSTI  IRN  N-GSO 08.11.2024 N 08.11.2024 11.2  
IRNDBS-2  IRN  26 26.03.2006 C  5.1.2  
IRNDBS-2  IRN  26 26.03.2006 C  5.1.6  
IRN-ERS-1  IRN  N-GSO 11.12.2025 N 11.12.2025 11.2  
IRANSAT-43.5E  IRN  43.5 15.06.2017 C  11.2  
IRANSAT-77.5E  IRN  77.5 02.09.2025 N 02.10.2025 11.2  
IRANSAT-B-43.5E  IRN  43.5 06.10.2023 C  11.2  
ZOHREH-2  IRN  26 07.06.1995 C  11.2  
ZOHREH-2  IRN  26 08.02.2010 C  11.2  
ZOHREH-2  IRN  26 14.07.2010 C  11.2  
VENUS  ISR  N-GSO 02.08.2017 C  11.2  
EROS  ISR  N-GSO 01.02.2000 C  11.2  
EROS-C  ISR  N-GSO 16.05.2023 C  11.2  
NSL-1  ISR  N-GSO 01.04.2023 C  11.2  
AMS-B2-13.8E  ISR  13.8 14.02.2019 C  11.2  
AMS-B7-13.8E  ISR  13.8 14.02.2019 C  11.2  
AMS-BSS-B1-4W  ISR  -4 20.02.2017 C  5.1.2  
AMS-C11-78E  ISR  78 14.03.2024 C  11.2  
AMS-C8-17E  ISR  17 17.11.2019 C  11.2  
AMS-CK-17E  ISR  17 17.11.2019 C  11.2  
AMS-CK-4W  ISR  -4 20.06.2008 C  11.2  
AMS-CK-4W  ISR  -4 01.03.2017 C  11.2  
AMOS 1-B  ISR  -4 24.03.2001 C  11.2  
AMOS 1-B  ISR  -4 31.08.1996 C  11.2  
AMOS 2-B  ISR  -4 01.01.2004 C  11.2  
AMOS 2-B  ISR  -4 01.08.2008 C  11.2  
AMOS 3-A  ISR  -4 01.06.2008 C  11.2  
AMOS 3-A  ISR  -4 01.06.2011 C  11.2  
AMOS-II 4W  ISR  -4 01.10.2003 C  A30B#8.1  
AMS-30B-4W  ISR  -4 20.02.2017 C  A30B#8.1  
AMS-30B-65E  ISR  65 06.04.2016 C  A30B#8.1  
AMS-4-65E  ISR  65 23.12.2013 C  11.2  
ALOS  J   N-GSO 26.05.2008 C  11.2  
ALOS  J   N-GSO 24.01.2006 C  11.2  
ALOS-2  J   N-GSO 24.05.2014 C  11.2  
ALOS-4  J   N-GSO 01.07.2024 C  11.2  
ALOSSAR  J   N-GSO 24.01.2006 C  11.2  
ASTRO-E  J   N-GSO 10.07.2005 C  11.2  
ASTRO-H  J   N-GSO 17.02.2016 C  11.2  
ASNARO  J   N-GSO 06.11.2014 C  11.2  
ASNARO  J   N-GSO 06.11.2014 N 04.03.2029 11.2  
ASNARO-2  J   N-GSO 18.01.2018 C  11.2  
BC-MMO  J   N-GSO 26.09.2025 N 26.09.2025 11.2  
ADRAS-J  J   N-GSO 18.02.2024 C  11.2  
BSAT-2N  J   109.85 01.12.2000 C  5.1.2  
BSAT-2N  J   109.85 01.12.2000 C  5.1.6  
BSAT-2  J   110 01.12.2000 C  5.1.2  
BSAT-2  J   110 01.12.2000 C  5.1.6  
BSAT-109.85  J   109.85 01.08.2000 C  11.2  
BSAT-109.85  J   109.85 05.02.2016 C  11.2  
BSAT-110  J   110 01.08.2000 C  11.2  
BSAT-110  J   110 05.02.2016 C  11.2  
CE-SAT  J   N-GSO 23.06.2017 C  11.2  
CE-SAT-B  J   N-GSO 29.10.2020 C  11.2  
CE-SAT-B  J   N-GSO 16.01.2025 N 16.01.2025 11.2  
GCOM-C1  J   N-GSO 23.12.2017 C  11.2  
GCOM-W1  J   N-GSO 18.05.2012 C  11.2  
GRUS  J   N-GSO 27.12.2018 C  11.2  
GOSAT  J   N-GSO 23.01.2009 C  11.2  
GOSAT-2  J   N-GSO 29.10.2018 C  11.2  
GEOTAIL  J   N-GSO 10.11.1992 C  11.2  
INDEX-1  J   N-GSO 23.08.2005 C  11.2  
HTV/JEM-MISSION  J   N-GSO 25.05.2020 C  11.2  
HTV-R  J   N-GSO 11.09.2009 C  11.2  
HIMAWARI-140E  J   140.7 16.10.2014 C  11.2  
HIMAWARI-8-140E  J   140.7 16.10.2014 C  11.2  
HAKUTO-R-L1  J   N-GSO 11.12.2022 C  11.2  
HAYABUSA2  J   N-GSO 03.12.2014 C  11.2  
HAYABUSA2SN  J   N-GSO 18.06.2015 C  11.2  
HODOYOSHI  J   N-GSO 14.07.2017 C  11.2  
HODOYOSHI-3-4  J   N-GSO 20.06.2014 C  11.2  
NFP-SAT-Y16-150E  J   150 01.09.2022 C  A30B#8.1  
N-SAT-110  J   110 07.10.2000 C  11.2  
N-SAT-110E  J   110 07.10.2000 C  11.2  
N-SAT-124E  J   124 10.07.2012 C  11.2  
N-SAT-127W  J   -127 25.12.2003 C  11.2  
N-SAT-128  J   128 29.08.1995 C  11.2  
N-SAT-143.72E  J   143.72 24.11.2008 C  11.2  
N-SAT-146  J   144 28.07.1997 C  11.2  
N-SAT-154E  J   154 17.02.2016 C  11.2  
N-SAT2-162E  J   162 10.12.2015 C  11.2  
N-SAT2-93E  J   93 25.02.2017 C  11.2  
N-SAT-82E  J   82 15.04.2013 C  11.2  
N-SAT-90.75E  J   90.75 01.11.2012 C  11.2  
N-SAT-HEO2  J   N-GSO 28.12.2007 C  11.2  
N-SAT-Y12-110E  J   110 25.03.2017 C  11.2  
N-SAT-Y12-128E  J   128 22.02.2019 C  11.2  
N-SAT-Y12-136E  J   136 22.02.2019 C  11.2  
N-SAT-Y12-144E  J   144 12.11.2018 C  11.2  
N-SAT-Y12-150E  J   150 23.08.2016 C  11.2  
N-SAT-Y12-162E  J   162 22.02.2019 C  11.2  
N-SAT-Y15-124E  J   124 10.10.2019 C  11.2  
N-SAT-Y15-128E  J   128 26.07.2019 C  11.2  
N-SAT-Y15-128E  J   128 08.12.2020 C  11.2  
N-SAT-Y15-132E  J   132 28.03.2022 C  11.2  
N-SAT-Y15-136E  J   136 05.01.2022 C  11.2  
N-SAT-Y15-150E  J   150 01.12.2020 C  11.2  
N-SAT-Y15-93E  J   93 14.09.2021 C  11.2  
N-SAT-Y15-93E  J   93 12.05.2022 C  11.2  
N-SAT-Y17-90.75E  J   90.75 09.03.2021 C  11.2  
N-SAT-Y18-127W  J   -127 23.01.2025 N 23.01.2025 11.2  
N-STAR-A  J   132 01.06.1995 C  11.2  
N-STAR-A  J   132 01.04.2002 C  11.2  
N-STAR-A  J   132 01.12.2005 C  11.2  
N-STAR-A2  J   132 27.12.2005 C  11.2  
N-STAR-B  J   136 01.08.1995 C  11.2  
N-STAR-B  J   136 01.12.2005 C  11.2  
N-STAR-B  J   136 01.04.2002 C  11.2  
N-STAR-B  J   136 01.04.2000 C  11.2  
N-STAR-B  J   136 01.02.1996 C  11.2  
N-STAR-B2  J   136 27.12.2005 C  11.2  
N-STAR-E  J   136 15.10.2007 C  11.2  
N-STAR-F  J   132 15.10.2007 C  11.2  
MUSES-C  J   N-GSO 09.05.2003 C  11.2  
NB-SAT-109.65-OD-EV  J   109.65 10.06.2018 C  5.1.2  
NB-SAT-109.65-OD-EV  J   109.65 10.06.2018 C  5.1.6  
NB-SAT-109.85AA  J   109.85 20.04.2008 C  5.1.2  
NB-SAT-109.85-OD-EV  J   109.85 10.06.2018 C  5.1.2  
NB-SAT-109.85-OD-EV  J   109.85 10.06.2018 C  5.1.6  
NBSAT-109.85-WB  J   109.85 08.09.2021 C  5.1.6  
NB-SAT-110AA  J   110 20.04.2008 C  5.1.2  
NB-SAT-110-EV  J   110 10.06.2018 C  5.1.2  
NB-SAT-110-EV  J   110 10.06.2018 C  5.1.6  
NB-SAT-110-OD  J   110 10.06.2018 C  5.1.2  
NB-SAT-110-OD  J   110 10.06.2018 C  5.1.6  
NBSAT-110-WB  J   110 08.09.2021 C  5.1.6  
NBSAT-21BX  J   109.85 10.06.2018 C  11.2  
NB-SAT-Y16-150E  J   150 23.03.2023 N 10.08.2024 5.1.2  
EQUULEUS  J   N-GSO 16.11.2022 C  11.2  
ERG  J   N-GSO 20.12.2016 C  11.2  
ELSA-D  J   N-GSO 22.03.2021 C  11.2  
DRS-90.75E  J   90.75 09.03.2021 C  11.2  
DRTS-90.75E  J   90.75 10.09.2002 C  11.2  
DRUMS  J   N-GSO 09.11.2021 C  11.2  
D-STAR-1  J   132 01.07.2006 C  11.2  
D-STAR-2  J   136 01.07.2006 C  11.2  
FSI-SAT1  J   N-GSO 30.04.2025 N 30.04.2028 11.2  
ISS-JEM-ICS-R  J   N-GSO 21.08.2009 C  11.2  
ISS-PROX-R  J   N-GSO 11.09.2009 C  11.2  
ISS-PROX-R  J   N-GSO 01.10.2008 C  11.2  
ITF-1  J   N-GSO 28.02.2014 C  11.2  
JBSS-1  J   110 15.04.2003 C  5.1.6  
JBSS-1  J   110 15.04.2003 C  5.1.2  
JBSS-1N  J   109.85 15.04.2003 C  5.1.2  
JBSS-1N  J   109.85 15.04.2003 C  5.1.6  
JCSAT-1  J   150 15.06.1991 C  11.2  
JCSAT-1  J   150 20.07.1995 C  11.2  
JCSAT-1R  J   150 17.02.1997 C  11.2  
JCSAT-1R  J   150 01.12.2005 C  11.2  
JCSAT-2  J   154 15.06.1991 C  11.2  
JCSAT-2  J   154 20.07.1995 C  11.2  
JCSAT-2R  J   154 01.12.2005 C  11.2  
JCSAT-2R  J   154 28.03.2002 C  11.2  
JCSAT-3A  J   128 01.12.2005 C  11.2  
JCSAT-3A  J   128 29.08.1995 C  11.2  
JCSAT-3B  J   124 01.04.1998 C  11.2  
JCSAT-3B  J   124 01.12.2005 C  11.2  
JCSAT-FO-124E  J   124 27.12.2005 C  11.2  
JCSAT-FO-128E  J   128 27.12.2005 C  11.2  
JCSAT-FO-132E  J   132 27.12.2005 C  11.2  
JCSAT-FO-132E  J   132 26.12.2007 C  11.2  
JCSAT-FO-136E  J   136 27.12.2005 C  11.2  
JCSAT-FO-150E  J   150 27.12.2005 C  11.2  
JCSAT-FO-154E  J   154 27.12.2005 C  11.2  
JCSAT-T-127.5E  J   127.5 30.11.2002 C  11.2  
JCUBES-A  J   N-GSO 28.03.2019 C  11.2  
JCUBES-B  J   N-GSO 09.11.2021 C  11.2  
JCUBES-B  J   N-GSO 09.11.2021 N 10.07.2027 11.2  
JCUBES-B  J   N-GSO 09.11.2021 N 11.04.2024 11.2  
CUTE-I  J   N-GSO 30.06.2003 C  11.2  
JAS-2  J   N-GSO 17.08.1996 C  11.2  
JCUBES-B  J   N-GSO 28.03.2019 C  11.2  
JMCS-1  J   144 24.02.1998 C  11.2  
JMCS-144X  J   144 12.01.2025 N 12.01.2025 11.2  
JMCS-162E  J   162 12.06.2018 C  11.2  
JMCS-1R  J   144 01.11.2003 C  11.2  
JMCS-2  J   110 24.02.2001 C  11.2  
JMCS-2  J   110 03.02.2006 C  11.2  
JMCS-3A  J   158 01.07.2004 C  11.2  
JMCS-3A  J   158 03.02.2006 C  11.2  
JMCS-3B  J   162 03.02.2006 C  11.2  
JMCS-3B  J   162 01.04.2001 C  11.2  
JMCS-93E  J   93 28.11.2012 C  11.2  
JMCS-93E-R  J   93 25.02.2017 C  11.2  
JMCS-B4-X  J   162 01.01.2013 C  11.2  
JMCS-C2-X  J   144 02.10.2008 C  11.2  
JMCS-D2-X  J   110 01.01.2013 C  11.2  
RISESAT  J   N-GSO 24.05.2014 C  11.2  
RAISE-2  J   N-GSO 06.11.2027 N 06.11.2027 11.2  
QSAT  J   N-GSO 06.11.2014 C  11.2  
QZSS  J   N-GSO 01.06.2017 C  11.2  
Total line = 1600/3228
Go to page : 1234567891011121314151617

 

Top - Feedback - Contact us -  Copyright © ITU 2024 All Rights Reserved
Contact for this page : Webmaster
Updated : 2024-09-21