Contributions
[ AI/Question: AI1.13 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 360 ]
|
Reply liaison statement to Working Party 4C - Technical information for sharing studies under WRC-27 agenda items 1.12 and 1.13
|
WP 5B
|
AI1.13, AI1.12
|
2025-05-16 |
|
[ 350 ]
|
Proposed modification initial consideration on the possible description and functionality of MSS systems for direct connectivity between space stations and IMT user equipment
|
Egypt
|
AI1.13
|
2025-04-11 |
|
[ 349 ]
|
Proposed criteria for mitigating interference from Direct-to-Cell (D-2-C) Mobile satellite services (MSS) and establishing interference resolution responsibilities
|
Egypt
|
AI1.13
|
2025-04-11 |
|
[ 347 ]
|
Proposals on related working documents on direct communication with IMT user equipment - WRC-27 agenda item 1.13
|
Germany
|
AI1.13
|
2025-04-11 |
|
[ 346 ]
|
Proposed updates to working document on sharing and compatibility studies in relation to WRC-27 agenda item 1.13
|
Motorola Solutions Inc.
|
AI1.13
|
2025-04-11 |
|
[ 345 ]
|
Proposals to advance the work under WRC-27 agenda item 1.13 - Initial consideration on the possible description and functionality of MSS systems for direct connectivity between space stations and IMT user equipment
|
South Africa
|
AI1.13
|
2025-04-11 |
|
[ 342 ]
|
Proposal for working document on sharing and compatibility studies in relation to WRC-27 agenda item 1.13
|
India
|
AI1.13
|
2025-04-11 |
|
[ 340 ]
|
Incumbent system characteristics in the 2.4/2.5/2.6 GHz frequency bands for sharing and compatibility studies in preparation for WRC-27 agenda item 1.13
|
India
|
AI1.13
|
2025-04-11 |
|
[ 338 ]
|
Working document on sharing and compatibility studies in relation to WRC-27 agenda item 1.13
|
Tonga
|
AI1.13
|
2025-04-11 |
|
[ 337 ]
|
Proposed revisions to the working document on a possible description and functionality of MSS systems for direct connectivity between space stations and IMT user equipment
|
Tonga
|
AI1.13
|
2025-04-11 |
|
[ 336 ]
|
Elements to be considered in sharing and compatibility studies in relation to WRC-27 agenda item 1.13
|
Telefon AB - LM Ericsson
,
Nokia Corporation
|
AI1.13
|
2025-04-11 |
|
[ 333 ]
|
Towards sharing studies related to WRC-27 agenda item 1.13
|
IAFI
|
AI1.13
|
2025-04-11 |
|
[ 332 ]
|
Preliminary elements of protection of aeronautical mobile telemetry (AMT) from MSS under agenda item 1.13 (WRC-27)
|
France
|
AI1.13
|
2025-04-11 |
|
[ 327 ]
|
Consideration on calculation of aggregate interference from MSS space stations under WRC-27 agenda item 1.13 and a draft reply liaison statement to Working Party 5D
|
Japan
|
AI1.13
|
2025-04-11 |
|
[ 326 ]
|
Proposed update to working document on technical and operational characteristics of MSS for direct communication with IMT user equipment
|
Japan
|
AI1.13
|
2025-04-11 |
|
[ 325 ]
|
Proposed updates to working document on initial consideration on the possible description and functionality of MSS systems for direct connectivity between space stations and IMT user equipment
|
Japan
|
AI1.13
|
2025-04-11 |
|
[ 323 ]
|
Sharing and compatibility studies between the incumbent MSS systems and the envisaged MSS systems for direct connectivity in the 2.5/2.6 GHz frequency bands
|
Japan
|
AI1.13
|
2025-04-11 |
|
[ 319 ]
|
Compatibility study between RAS and MSS for direct connectivity between space stations and IMT user equipment under WRC-27 agenda item 1.13
|
Russian Federation
|
AI1.13
|
2025-04-10 |
|
[ 318 ]
|
Proposals for the working document on sharing and compatibility studies in relation to WRC-27 agenda item 1.13
|
Russian Federation
|
AI1.13
|
2025-04-10 |
|
[ 309 ]
|
Technical and operational characteristics of mobile satellite system in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz for sharing and compatibility studies on WRC-27 agenda item 1.13
|
Russian Federation
|
AI1.13
|
2025-04-10 |
|
[ 306 ]
|
Characteristics of a model system configuration for satellite direct-to-device services under WRC-27 agenda item 1.13
|
Maldives
|
AI1.13
|
2025-04-11 |
|
[ 302 ]
|
Input for working document on sharing and compatibility studies in relation to WRC-27 agenda item 1.13
|
Mexico
|
AI1.13
|
2025-04-11 |
|
[ 297 ]
|
Consideration and proposals for the usage of frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz related to WRC-27 agenda item 1.13
|
Korea (Rep. of)
|
AI1.13
|
2025-04-11 |
|
[ 291 ]
|
Considerations on protection criterion related to interference to GSO MSS in the frequency range 1 980-2 010 MHz (Earth-to-space) and 2 170-2 200 MHz (space-to-Earth) for sharing studies for WRC-27
|
China
|
AI1.14, AI1.13
|
2025-04-10 |
|
[ 290 ]
|
Proposal for sharing and compatibility studies in the frequency bands 1 710-2 025 MHz and 2 110-2 200 MHz in relation to WRC-27 agenda item 1.13
|
China
|
AI1.13
|
2025-04-10 |
|
[ 288 ]
|
Proposal on the draft reply liaison statement to Working Party 5D under WRC-27 agenda item 1.13
|
China
|
AI1.13
|
2025-04-10 |
|
[ 284 ]
|
Proposal for sharing and compatibility studies in the frequency bands 2 500-2 570 MHz and 2 620-2 690 MHz in relation to WRC-27 agenda item 1.13
|
China
|
AI1.13
|
2025-04-10 |
|
[ 283 ]
|
Consideration of issues on power flux-density under WRC-27 agenda item 1.13
|
China
|
AI1.13
|
2025-04-10 |
|
[ 281 ]
|
Proposal for sharing and compatibility studies in the frequency bands 1 427-1 518 MHz in relation to WRC-27 agenda item 1.13
|
China
|
AI1.13
|
2025-04-10 |
|
[ 279 ]
|
Proposed definitions to the terms and terminologies to be considered under the initial consideration on the possible description and functionality of MSS systems for direct connectivity between space stations and IMT user equipment document
|
Tanzania
|
AI1.13
|
2025-04-10 |
|
[ 278 ]
|
Considerations on the MSS NGSO satellite antenna radiation pattern for WRC-27 agenda item 1.13
|
New Zealand
|
AI1.13
|
2025-04-10 |
|
[ 275 ]
|
Work related to WRC-27 agenda item 1.13
|
Brazil
|
AI1.13
|
2025-04-09 |
|
[ 273 ]
|
Characteristics and protection criteria of the existing SAP/SAB wireless video links for sharing and compatibility studies under agenda item 1.13 in preparation for WRC-27
|
United Kingdom
|
AI1.13
|
2025-04-09 |
|
[ 271 ]
|
Elements to be taken into account in sharing and compatibility studies in relation to WRC-27 agenda item 1.13
|
Iran (Islamic Republic of)
|
AI1.13
|
2025-04-08 |
|
[ 270 ]
|
Characteristics of a reference System XX for direct-to-device (D2D) services under WRC-27 agenda item 1.13
|
Nigeria
|
AI1.13
|
2025-04-07 |
|
[ 264 ]
|
Working document on sharing and compatibility studies in relation to WRC-27 agenda item 1.13
|
United States
|
AI1.13
|
2025-04-07 |
|
[ 263 ]
|
Working document on sharing and compatibility studies in relation to WRC-27 agenda item 1.13
|
United States
|
AI1.13
|
2025-04-07 |
|
[ 262 ]
|
Technical/operational characteristics of MSS for direct connectivity between space stations and IMT user equipment
|
United States
|
AI1.13
|
2025-04-07 |
|
[ 261 ]
|
Proposed edits to working document on technical and operational characteristics of MSS for direct communication with IMT user equipment
|
United States
|
AI1.13
|
2025-04-07 |
|
[ 255 ]
|
Working document on sharing and compatibility studies in relation to WRC-27 agenda item 1.13
|
United States
|
AI1.13
|
2025-04-07 |
|
[ 254 ]
|
Initial consideration on the possible description and functionality of MSS systems for direct connectivity between space stations and IMT user equipment
|
United States
|
AI1.13
|
2025-04-07 |
|
[ 250 ]
|
Studies addressing frequency overlaps between WRC-27 agenda items 1.13 and 1.15
|
United States
|
AI1.15, AI1.13
|
2025-04-07 |
|
[ 246 ]
|
Working document on sharing and compatibility studies in relation to WRC-27 agenda item 1.13
|
United States
|
AI1.13
|
2025-04-07 |
|
[ 244 ]
|
Proposed liaison statement to Working Party 5B - Relevant technical information for sharing studies under WRC-27 agenda items 1.12 and 1.13
|
United States
|
AI1.13, AI1.12
|
2025-04-07 |
|
[ 239 ]
|
Reply liaison statement to Working Party 4C regarding preliminary calculations on overlaps between WRC-27 agenda items 1.11, 1.13 and 1.15 - WRC-27 agenda items 1.11, 1.13 and 1.15 sharing studies
|
WP 7B
|
AI1.15, AI1.13, AI1.11
|
2025-04-01 |
|
[ 236 ]
|
Reply liaison statement to Working Party 4C - WRC-27 agenda item 1.13
|
WP 6A
|
AI1.13
|
2025-03-17 |
|
[ 235 ]
|
Preliminary calculations on overlaps between WRC-27 agenda items 1.11, 1.13 and 1.15
|
Chair, WP 4C and Acting Chair, WP 7B
|
AI1.15, AI1.13, AI1.11
|
2025-03-05 |
|
[ 231 ]
|
Reply liaison statement to Working Party 4C - WRC-27 agenda item 1.13
|
WP 5D
|
AI1.13
|
2025-02-20 |
|
[ 226 ]
|
Reply liaison statement to Working Party 4C - WRC-27 agenda items 1.12, 1.13 and 1.14
|
WP 5C
|
AI1.14, AI1.13, AI1.12
|
2024-12-13 |
|
[ 221 ]
|
Liaison statement to Working Party 4C - Technical information to support the studies for WRC-27 agenda item 1.13
|
WP 5A
|
AI1.13
|
2024-12-11 |
Results:113 total items. Result page:
1 -
2 -
3
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):