Contributions
[ Source: China Mobile Communications Co. Ltd. ]  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1196 ]
|
Consideration of hitless protection switch mechanism for OTN
|
China Academy of Information and Communications Technology (CAICT)
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-16 |
|
[ 1195 ]
|
Proposal to start a technical report on hollow-core fibres and their corresponding transmission technologies
|
Centre Tecnològic de Telecomunicacions de Catalunya (CTTC) (Spain)
,
China Academy of Information and Communications Technology (CAICT)
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
Orange (France)
,
TKH Group NV (Netherlands (Kingdom of the))
,
VIAVI Solutions (United States)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q6/15, Q5/15, Q2/15
|
2026-06-16 |
|
[ 1193 ]
|
New use cases for PTP Announce message delay analysis in Appendix III of ITU-T G.781.1
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2026-06-16 |
|
[ 1190 ]
|
Investigation on HCF interoperability
|
China Mobile Communications Co. Ltd.
|
Q6/15, Q5/15
|
2026-06-16 |
|
[ 1177 ]
|
Ethernet packet clients over FlexOyP for B1T
|
China Mobile Communications Co. Ltd.
|
Q11/15
|
2026-06-16 |
|
[ 1172 ]
|
New work item of supplement for Mapping of sub-100G ODUk signals to FlexOL
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2026-06-16 |
|
[ 1169 ]
|
Situation discussion of FlexO-16o-RSH in G.709.5 draft
|
China Mobile Communications Co. Ltd.
|
Q11/15
|
2026-06-16 |
|
[ 1167 ]
|
Considerations for 800G MTN over 800GBASE-R PHY
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-16 |
|
[ 1161 ]
|
Proposed new work item on electrical-switching OTN based hitless DCI technologies for the AI application
|
China Academy of Information and Communications Technology (CAICT)
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-16 |
|
[ 1159 ]
(Rev.1) |
Impacts of QKD Introduction on WDM System Design for OTN-QKDN Integration
|
China Mobile Communications Co. Ltd.
|
Q6/15
|
2026-06-16 |
|
[ 1158 ]
|
Proposal of distributed call and connection management signaling for MTN
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q14/15
|
2026-06-16 |
|
[ 1156 ]
|
Proposal for VC-4 over fgMTNP
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-16 |
|
[ 1155 ]
|
Physical layer clock signal consideration in G.781.1
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2026-06-16 |
|
[ 1153 ]
|
Proposal on the hierarchical and domain-based networking approach for G.8274
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
|
Q13/15
|
2026-06-16 |
|
[ 1152 ]
|
Test vectors of FlexO-xo-DPO-16QAM over single carrier
|
Algérie Télécom SPA (Algeria)
,
China Academy of Information and Communications Technology (CAICT)
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2026-06-16 |
|
[ 1151 ]
|
Proposal update on Distributed Common View [ITU-T G.8271]
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2026-06-16 |
|
[ 1150 ]
|
Text proposal of FlexO-xo-DPO-16QAM over single carrier and four digital sub-carriers (DSC)
|
Algérie Télécom SPA (Algeria)
,
China Academy of Information and Communications Technology (CAICT)
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2026-06-16 |
|
[ 1148 ]
|
Considerations on advancing the fgMTN DNI Protection
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-16 |
|
[ 1147 ]
|
Study Points for G.7721.1 YANG data model updates
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q14/15, Q13/15
|
2026-06-16 |
|
[ 1146 ]
|
Consideration on algorithm-based flexible time slot configuration for 800G MTN
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2026-06-16 |
|
[ 1135 ]
|
Proposal to initiate a new work item on supplement for fgOTN protection for power industry
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Southern Power Grid Co., Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-16 |
|
[ 1128 ]
|
The definition of message format for G.OMCC4FIP
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2026-06-16 |
|
[ 1127 ]
|
Proposal to update clause 9 in GSTR.OPIM
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
|
Q14/15
|
2026-06-16 |
|
[ 1125 ]
(Rev.1) |
Research Proposal on Hollow-Core Fiber Specific Transmission Defects
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
|
Q6/15, Q5/15
|
2026-06-16 |
|
[ 1124 ]
|
Analysis on the hitless transmission mechanisms for the AI application
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-16 |
|
[ 1117 ]
|
Editorial improvement of G.8312 rev draft
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-16 |
|
[ 1112 ]
|
Considerations on the restructure of G.8312 revision clause A.4.2
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-16 |
|
[ 1108 ]
|
G.sup.88: Proposed text for FFS-based solution in Section 9.3
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
|
Q2/15
|
2026-06-16 |
|
[ 1096 ]
|
Considerations on Availability with protection and restoration improvement for Data Center Scenarios
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15, Q14/15, Q13/15, Q12/15, Q11/15
|
2026-06-16 |
|
[ 1091 ]
|
Proposal to revise G.696.1 for B1T DWDM applications
|
Algérie Télécom SPA (Algeria)
,
Centre Tecnològic de Telecomunicacions de Catalunya (CTTC) (Spain)
,
China Academy of Information and Communications Technology (CAICT)
,
China Mobile Communications Co. Ltd.
,
Department of Electrical and Computer Engineering University of Patras (Greece)
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Communications, Department of Telecommunications (India)
,
VIAVI Solutions (United States)
,
ZTE Corporation (China)
|
Q6/15
|
2026-06-16 |
|
[ 1089 ]
|
Propose to start Amendment 2 to G.709.20
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Southern Power Grid Co., Ltd.
|
Q11/15
|
2026-06-16 |
|
[ 1086 ]
|
Update of the summary of all received information on B1T
|
China Mobile Communications Co. Ltd.
|
Q6/15
|
2026-06-16 |
|
[ 1070 ]
|
G.sup.aiBB Motivations for applying AI technologies in access and home network V3
|
AT&T, Inc. (United States)
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Nokia Corporation (Finland)
|
Q2/15
|
2026-06-16 |
|
[ 1056 ]
|
Proposal on transport network support of IMT-2030/6G
|
Centre Tecnològic de Telecomunicacions de Catalunya (CTTC) (Spain)
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Department of Electrical and Computer Engineering University of Patras (Greece)
,
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q14/15, Q13/15, Q12/15, Q11/15
|
2026-06-16 |
|
[ 1053 ]
|
Comments on G.709.1 draft
|
China Academy of Information and Communications Technology (CAICT)
,
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
|
Q11/15
|
2026-06-16 |
|
[ 1052 ]
|
Refinements for GSTR.OPIM
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q14/15
|
2026-06-16 |
|
[ 1044 ]
|
Considerations about revised G.696.1 for DWDM system
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q6/15
|
2026-06-16 |
|
[ 1043 ]
|
Proposal for the standardization of I3 and MCS in GSTR.ENO
|
China Academy of Information and Communications Technology (CAICT)
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2026-06-16 |
|
[ 1041 ]
|
Considerations about transmission damage and compensation in HCF systems
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q6/15, Q5/15
|
2026-06-16 |
|
[ 1038 ]
|
Proposal to revise the G.665 for including the new definition
|
China Academy of Information and Communications Technology (CAICT)
,
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Unicom
,
ZTE Corporation (China)
|
Q6/15
|
2026-06-16 |
|
[ 1036 ]
|
Proposal for architecture alignment on observation and memory in NMA
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q12/15
|
2026-06-16 |
|
[ 1035 ]
|
Proposal for cross-layer association between OPIM and carried layer networks
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q14/15
|
2026-06-16 |
|
[ 1008 ]
|
FlexOLy to ODUCn adaptation function
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-15 |
|
[ 1001 ]
|
Proposal to new ITU-T Supplement G.sup.PONcoop "PON cooperation based on combo OLT and combo ONU"
|
AT&T, Inc. (United States)
,
China Mobile Communications Co. Ltd.
,
China Unicom
,
Futurewei Technologies Inc. (United States)
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2026-06-15 |
|
[ 1000 ]
|
Architecture of FIP management and control interfaces in G.OMCC4FIP
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2026-06-15 |
|
[ 994 ]
|
G.798.x: managed versus unmanaged interfaces
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-15 |
|
[ 986 ]
|
Requirements for the mechanism on transport network capabilities invocation by NMAs
|
China Mobile Communications Co. Ltd.
|
Q14/15, Q12/15
|
2026-06-15 |
|
[ 984 ]
|
Clarification on NMA's "orchestration capability" and addition of the capability of network capabilities invocation to be ones owned by NMAs
|
China Mobile Communications Co. Ltd.
|
Q14/15, Q12/15
|
2026-06-15 |
|
[ 969 ]
|
Proposal for revision of Recommendation ITU-T L.203 "Electric power supply for equipment installed as outside plant"
|
China Academy of Information and Communications Technology (CAICT)
,
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q7/15
|
2026-06-15 |
|
[ 958 ]
|
Criteria of sync service availability [G.8275]
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2026-06-15 |
Resultats:184 documents Résultats :
1 -
2 -
3 -
4
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):