Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG02 : Réunion 2026-02-04 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG02  TD (2026-02-04) 

UIT-T SG02

Operational aspects

Période d'études 2025

Réunion  du 2026-02-04 au 2026-02-13

Lieu : Suisse [Genève]

Autres réunions : 2026-09-09  [ 2026-02-04 ]  2025-08-25  2025-02-05 

Documents Temporaires  (GEN)  [ AI/Question: Q5/2 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 395-GEN ]  
 
LS/o/r on the comment on the term "telecommunication network large model (TNLM)" (reply to SCV-LS72) [to SCV]     ITU-T Study Group 2   Q7/2, Q6/2, Q5/2   2026-02-12
[ 394-GEN ]  
 
LS/o on Telecommunication Management and OAM Project Plan [to All ITU-T SGs]  
Not yet available
 
ITU-T Study Group 2   Q7/2, Q6/2, Q5/2   2026-02-12
[ 393-GEN ]  
(Rev.1) 
LS/o/r on the term "connectivity" and its definition (reply to SCV-LS56) [to SCV, SG12]     ITU-T Study Group 2   Q7/2, Q6/2, Q5/2   2026-02-12
[ 392-GEN ]  
 
LS/o/r on the validation of terms and definitions developed by ITU-T SG2 (reply to SCV-LS75) [to SCV]     ITU-T Study Group 2   Q7/2, Q6/2, Q5/2   2026-02-12
[ 388-GEN ]  
(Rev.1) 
LS/o/r on "on-going work item ITU-T M.rnismsec" (reply to SG13-LS151) [to ITU-T SG13]     ITU-T Study Group 2   Q5/2   2026-02-11
Documents affichés : 5 sur un total de 46  relatifs à cette réunion (en voir plus...)  

 
Documents Temporaires  (PLEN)  [ AI/Question: Q5/2 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 411-PLEN ]  
 
Revised baseline text for MSTR.M.rnscesnr: Requirements of network service consistency evaluation for shared network resources     Editor   Q5/2   2026-02-09
[ 410-PLEN ]  
 
Revised baseline text for MSTR.M.cmtnps: Overview for collaborative management of telecommunication network and power supply     Editor   Q5/2   2026-02-09
[ 409-PLEN ]  
 
Revised baseline text for M.rmfscn: Requirements of management functions for sensor control network     Editor   Q5/2   2026-02-09
[ 408-PLEN ]  
 
Revised baseline text for M.rmepims: Functional requirements for the management of IoT-based electric power infrastructure monitoring system     Editor   Q5/2   2026-02-09
[ 407-PLEN ]  
 
Revised baseline text for M.rostm-AI: Requirements for AI-enhanced management of on-site telecommunication maintenance     Editor   Q5/2   2026-02-09
Documents affichés : 5 sur un total de 26  relatifs à cette réunion (en voir plus...)  

 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2026-3-19