Contributions
[ Source: Korea (Rep. of) ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 846 ]
|
Proposal to use QR code and Blockchain technologies for the efficient reuse of used batteries from electric vehicles (EVs)
|
Korea (Rep. of)
|
Q7/5
|
2021-11-16 |
|
[ 845 ]
|
EMF strength analysis of the 5G NR base station using the Ray-Tracing Method
|
Korea (Rep. of)
|
Q3/5
|
2021-11-16 |
|
[ 844 ]
(Rev.1-2) |
Draft of K-Series Supplement-" EMF strength inside and outside of OLEV"
|
Korea (Rep. of)
|
Q3/5
|
2021-11-16 |
|
[ 795 ]
(Rev.1) |
Considerations on micro data centres for edge computing
|
Korea (Rep. of)
|
Q6/5
|
2021-04-28 |
|
[ 726 ]
|
A proposal for new work item on "Energy efficiency in micro data centre for edge computing"
|
Korea (Rep. of)
|
Q6/5
|
2020-10-06 |
|
[ 718 ]
|
EMF exposure evaluation on non-radiocommunication installations
|
Korea (Rep. of)
|
QALL/5
|
2020-10-05 |
|
[ 712 ]
|
Korea Green New Deal Initiative and ICT
|
Korea (Rep. of)
|
QALL/5
|
2020-10-06 |
|
[ 624 ]
|
KSTR.EMF_assess on "The assessment of electromagnetic field on medical and beauty treatment devices": Proposal for case study
|
Korea (Rep. of)
|
Q3/5
|
2020-04-27 |
|
[ 623 ]
|
EMF strength measurements for the WPT system of electric vehicles and the measurement results
|
Korea (Rep. of)
|
Q3/5
|
2020-04-27 |
|
[ 622 ]
|
L.SE_DC on "Smart energy solution for data centre and telecom centre": Proposal for updating clause 6
|
Korea (Rep. of)
|
Q6/5
|
2020-04-27 |
|
[ 621 ]
(Rev.1) |
K.peak: Rationale of the expression of spatial averaging for evaluating real exposure level
|
Korea (Rep. of)
|
Q3/5
|
2020-04-27 |
|
[ 578 ]
(Rev.1) |
K-Series Supplement "EMF strength inside subway train"
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q3/5
|
2019-09-03 |
|
[ 493 ]
(Rev.1-2) |
Proposed new work item on K.STR.EMF_assess - "EMF strength inside the subway train"
|
Korea (Rep. of)
|
Q3/5
|
2019-04-30 |
|
[ 492 ]
|
Proposal for updating baseline document of L.SES
|
Korea (Rep. of)
|
Q6/5
|
2019-04-30 |
|
[ 491 ]
(Rev.1) |
Proposal to conduct a survey on the Recycling of used EV Batteries
|
Korea (Rep. of)
|
Q7/5
|
2019-04-30 |
|
[ 490 ]
(Rev.1-2) |
K Suppl. 16 on "Electromagnetic field (EMF) compliance assessments for 5G wireless networks ": EMF extrapolation method for 5G NR radio station
|
Korea (Rep. of)
|
Q3/5
|
2019-04-30 |
|
[ 489 ]
|
L.SES on "Use of ICT sites to support environmental sensing": Proposal for updating clause 8 and Bibliography
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q6/5
|
2019-04-30 |
|
[ 424 ]
|
Proposed Terms of Reference for new Focus Group on "Environmental Efficiency for Artificial Intelligence and other Emerging Technologies" (FG-AI4EE)
|
Argentina
,
Brazil
,
China Unicom
,
China
,
Cisco Systems, Inc. (United States)
,
Colombia
,
Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT (Italy)
,
Dominican Rep.
,
Egypt
,
Greece
,
Huawei Technologies Co., Ltd. (China)
,
Italy
,
Kenya
,
Korea (Rep. of)
,
Nokia Corporation (Finland)
,
Orange (France)
,
Rwanda
,
Spain
,
Telecommunication and Postal Regulatory Authority (Sudan)
,
Telefon AB - LM Ericsson (Sweden)
,
Uganda Communications Commission (UCC)
|
QALL/5
|
2019-04-15 |
|
[ 369 ]
(Rev.1) |
EMF extrapolation method of 5G radio stations for compliance assessment
|
Korea (Rep. of)
|
Q3/5
|
2018-08-28 |
|
[ 368 ]
(Rev.1) |
EMF level monitoring and information platform for various radio stations
|
Korea (Rep. of)
|
Q3/5
|
2018-08-28 |
|
[ 367 ]
|
Introduction on the RF EMF warning signage applied in Korea
|
Korea (Rep. of)
|
Q3/5
|
2018-08-28 |
|
[ 364 ]
(Rev.1-2) |
Evaluation of the EMF strength for verifying the compliance with guidelines inside the subway train
|
Korea (Rep. of)
,
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q3/5
|
2018-08-28 |
|
[ 363 ]
|
Comparison of measurement and numerical prediction results of EMF strength in the vicinity of radiocommunication stations
|
Korea (Rep. of)
|
Q3/5
|
2018-08-28 |
|
[ 362 ]
|
Proposal of updating L.green_mgm_DC with a control function
|
Korea (Rep. of)
|
Q6/5
|
2018-08-28 |
|
[ 239 ]
(Rev.1) |
Proposal for Appendix II of K.121 on the Shared Radiocommunications Site
|
Electronics and Telecommunications Research Institute (ETRI)
,
Korea (Rep. of)
,
Ministry of Science and ICT
|
Q3/5
|
2018-05-03 |
|
[ 238 ]
(Rev.1) |
Proposal for some issues regarding the Technical Report on 5G and EMF
|
Electronics and Telecommunications Research Institute (ETRI)
,
Korea (Rep. of)
,
Ministry of Science and ICT
|
Q3/5
|
2018-05-03 |
|
[ 158 ]
(Rev.1) |
Updated draft document of L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities)
|
Korea (Rep. of)
|
Q9/5
|
2017-10-31 |
|
[ 157 ]
(Rev.1) |
Contribution for Clause 9 and 10 of L.CCRisk
|
Korea (Rep. of)
|
Q9/5
|
2017-10-31 |
|
[ 156 ]
(Rev.1) |
Draft baseline document for L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities)
|
Korea (Rep. of)
|
Q9/5
|
2017-10-31 |
|
[ 155 ]
|
Consideration topics in preparation for the Technical Report concerning 5G and EMF
|
Korea (Rep. of)
|
Q3/5
|
2017-10-31 |
|
[ 154 ]
|
Proposal of updating L.green_mgm_DC
|
Korea (Rep. of)
|
Q6/5
|
2017-10-31 |
|
[ 153 ]
|
Proposal of the operational procedure of the energy-saving management system in L.green_mgm_DC
|
Korea (Rep. of)
|
Q6/5
|
2017-10-31 |
|
[ 52 ]
|
Proposed initial text for L.CC Risk (Framework of climate change risk assessment for telecommunication and electrical facilities)
|
Korea (Rep. of)
|
Q8/5
|
2017-05-02 |
|
[ 50 ]
|
Proposed text for clause 6 in L.CC Risk (Framework of climate change risk assessment for telecommunication and electrical facilities)
|
Korea (Rep. of)
|
Q8/5
|
2017-05-02 |
|
[ 48 ]
|
Proposal for changing a Figure in Annex III of K.100
|
Korea (Rep. of)
|
Q3/5
|
2017-05-02 |
|
[ 47 ]
|
Proposal for adding a scientific paper in bibliography of K.100
|
Korea (Rep. of)
|
Q3/5
|
2017-05-02 |
Resultats:36 documents
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):