Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 5 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 5  C 

UIT-T SG 5

Environment, climate change and circular economy

Période d'études 2017

Resultats:12 documents
Contributions  [ Source: Huawei Technologies Co., Ltd ]  [ AI/Question: Q1/5 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 604 ]  
 
Description of new Question QA/5     Huawei Technologies Co., Ltd. (China)   QALL/5, Q5/5, Q1/5   2019-09-04
[ 546 ]  
 
Proposed a new work item on draft Recommendation ITU-T K.5G-Lightning "Practical guide for lightning protection, earthing and bonding, and safety consideration of 5G radio base station"     Huawei Technologies Co., Ltd. (China)   Q1/5   2019-08-30
[ 545 ]  
 
Proposal to revise ITU-T K.40     Huawei Technologies Co., Ltd. (China)   Q1/5   2019-08-30
[ 453 ]  
 
Proposal to add a clause to demonstrate the protection measure for antenna system against lightning in different installation scenarios in ITU-T K.112.     Huawei Technologies Co., Ltd. (China)   Q1/5   2019-04-26
[ 380 ]  
 
Added the requirements for SSI powered by up to 400V IT d.c. system in ITU-T K.psp     Huawei Technologies Co., Ltd.   Q1/5   2018-08-29
[ 379 ]  
 
Some revision suggestions for ITU-T K.psp "Protection of small-size telecommunication installations with poor earthing conditions"     Huawei Technologies Co., Ltd.   Q1/5   2018-08-29
[ 240 ]  
 
Proposal to add a new Appendix to give some examples for protection GPS system against lightning in ITU-T K.112     Huawei Technologies Co., Ltd.   Q1/5   2018-05-03
[ 115 ]  
 
Proposal to delete work item K.lp from the work program     Huawei Technologies Co., Ltd.   Q1/5   2017-10-28
[ 114 ]  
 
Proposal for new subclauses to be inserted on ITU-T K.40     Huawei Technologies Co., Ltd.   Q1/5   2017-10-28
[ 113 ]  
 
Proposal for an alternative earthing network for electronic equipment cabinet (EEC) in ITU-T K.35     Huawei Technologies Co., Ltd.   Q1/5   2017-10-28
[ 76 ]  
 
The power frequency magnetic field (PFMF) control of ICT equipment rooms and PFMF immunity requirement for ICT equipment for ITU-T K.idc     Huawei Technologies Co., Ltd.   Q1/5   2017-05-03
[ 72 ]  
 
Dangerous effects and protective measures against electromagnetic disturbances when internet data centre is co-sited with high-voltage substation     Huawei Technologies Co., Ltd.   Q1/5   2017-05-03
Resultats:12 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2020-3-30