Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 183 ]
|
Roadmap for E- Waste Take- back committee
|
Centre for Environment and Development for the Arab Region and Europe-Egypt
|
Q7/5
|
2017-11-01 |
|
[ 182 ]
|
Baseline Document for work item L.ICT and FA - Use of ICT in the adaptation of the Fisheries Sector to the Effects of Climate Change
|
Ministry of Communication and Information Technology (MCIT)-Egypt
|
Q9/5
|
2017-11-01 |
|
[ 181 ]
|
Technical Report on "Analysis of EMC aspects and definition of requirements for 5G systems"
|
Nokia Corporation
|
Q4/5
|
2017-11-01 |
|
[ 180 ]
(Rev.1) |
Proposal for L.1000 revision
|
Orange
|
Q7/5
|
2017-10-31 |
|
[ 179 ]
|
Carbon budget for the ICT sector
|
Orange
|
Q9/5
|
2017-10-31 |
|
[ 178 ]
|
L.ENST3 - New energy storage technology for stationary use with network and CPE; Super-Capacitor technology
|
Huawei Technologies Co., Ltd.
,
Telecom Italia S.p.A.
|
Q6/5
|
2017-10-31 |
|
[ 177 ]
|
First draft of Recommendation ITU-T K.int (Limits of interferences on telecommunication transmissions on copper other than speech)
|
Orange
,
Société nationale des chemins de fer français
|
Q1/5
|
2017-10-31 |
|
[ 176 ]
|
Research of limits on ADSL disturbances created by A.C. electrified traction systems for K.int (Limits of interference on telecommunication transmissions on copper other than speech)
|
Orange
,
Société nationale des chemins de fer français
|
Q1/5
|
2017-10-31 |
|
[ 175 ]
|
Proposal to create a new work item to develop a new ITU-T Recommendation on Procurement Criteria for Data Centres.
|
Ministerio de Modernización-Argentina
|
Q6/5
|
2017-10-31 |
|
[ 174 ]
(Rev.1) |
Proposed new work item: Draft Recommendation on 5G energy efficiency
|
Ministerio de Modernización-Argentina
,
Huawei Technologies Co., Ltd.
|
Q6/5
|
2017-10-31 |
|
[ 173 ]
|
Baseline Document for the Recommendation on "EPR Guidelines for Sustainable E-waste Management in countries"
|
Ministry of Communication and Information Technology (MCIT)-Egypt
,
Royal KPN N.V.
,
Uganda Communications Commission (UCC)
|
Q7/5
|
2017-10-31 |
|
[ 172 ]
|
Proposal to convert the Technical Report on "Study on methods and metrics to evaluate energy efficiency for future 5G systems" into a Supplement
|
Huawei Technologies Co., Ltd.
,
Telecom Italia S.p.A.
|
Q6/5
|
2017-10-31 |
|
[ 171 ]
(Rev.1) |
Contribution on 5 sept draft ID2r1 of L.400migration / ETSI DES 0260
|
Orange
|
Q6/5
|
2017-10-31 |
|
[ 170 ]
|
Proposed text for the Draft Recommendation on the methodologies for the assessment of the environmental impact of the ICT sector
|
Nokia Corporation
,
Orange
,
Telefon AB - LM Ericsson
|
Q9/5
|
2017-10-31 |
|
[ 169 ]
(Rev.1) |
Recommendation L.mmNFV - Measurement method for energy efficiency of Network Function Virtualization
|
Consorzio Nazionale Interuniversitario per le Telecomunicazioni
,
Huawei Technologies Co., Ltd.
|
Q6/5
|
2017-10-31 |
|
[ 168 ]
|
2nd revised baseline text of L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities)
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/5
|
2017-10-31 |
|
[ 167 ]
(Rev.1) |
Presentation of the main concepts of the fourth draft of the ITU-T L.GAL2
|
Consorzio Nazionale Interuniversitario per le Telecomunicazioni
|
Q6/5
|
2017-10-31 |
|
[ 166 ]
(Rev.1) |
The fourth draft of the ITU-T L.GAL2 - Interface for power management in NFV environments "Green Abstraction Layer 2"
|
Consorzio Nazionale Interuniversitario per le Telecomunicazioni
|
Q6/5
|
2017-10-31 |
|
[ 165 ]
|
Points to consider for 5G energy efficiency
|
Telecom Italia S.p.A.
|
Q6/5
|
2017-10-31 |
|
[ 164 ]
|
Questionnaire to develop a guideline on best practices and environment friendly policies for effective ICT deployment methods.
|
Malaysian Communications and Multimedia Commission
|
Q6/5
|
2017-10-31 |
|
[ 163 ]
|
Proposal for considerations on using risk assessment method of L.CCRisk
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/5
|
2017-10-31 |
|
[ 162 ]
|
Study : Role of ICT in facing Climate Change within the Arab region
|
Arab Information and Communication Technology Organization (AICTO)
|
Q9/5
|
2017-10-31 |
|
[ 161 ]
(Rev.1-2) |
Mitigating Climate Change Impacts for a Sustainable Agriculture in the Arab Region
|
Arab Information and Communication Technology Organization (AICTO)
|
Q9/5
|
2017-10-31 |
|
[ 160 ]
|
Information regarding an ongoing study on ICTs carbon footprint
|
Telefon AB - LM Ericsson
|
Q9/5
|
2017-10-31 |
|
[ 159 ]
(Rev.1) |
EMF Estimator Error factor
|
National Telecommunications Corporation (NTC)-Sudan
|
Q3/5
|
2017-10-31 |
|
[ 158 ]
(Rev.1) |
Updated draft document of L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities)
|
Korea (Rep. of)
|
Q9/5
|
2017-10-31 |
|
[ 157 ]
(Rev.1) |
Contribution for Clause 9 and 10 of L.CCRisk
|
Korea (Rep. of)
|
Q9/5
|
2017-10-31 |
|
[ 156 ]
(Rev.1) |
Draft baseline document for L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities)
|
Korea (Rep. of)
|
Q9/5
|
2017-10-31 |
|
[ 155 ]
|
Consideration topics in preparation for the Technical Report concerning 5G and EMF
|
Korea (Rep. of)
|
Q3/5
|
2017-10-31 |
|
[ 154 ]
|
Proposal of updating L.green_mgm_DC
|
Korea (Rep. of)
|
Q6/5
|
2017-10-31 |
|
[ 153 ]
|
Proposal of the operational procedure of the energy-saving management system in L.green_mgm_DC
|
Korea (Rep. of)
|
Q6/5
|
2017-10-31 |
|
[ 152 ]
|
Proposal to advance current work item L.SIB "Sustainable and intelligent building services"
|
Secretaría de Estado para la Sociedad de la Información y la Agenda Digital-Spain
|
Q6/5
|
2017-10-31 |
|
[ 151 ]
|
Isolation transformers and rated insulation withstand
|
Bourns Limited
|
Q8/5, Q2/5
|
2017-10-31 |
|
[ 150 ]
(Rev.1) |
5G energy consumption and exponential traffic growth
|
Orange
|
Q6/5
|
2017-10-31 |
|
[ 149 ]
(Rev.1) |
Electromagnetic field (EMF) compliance assessments for 5G wireless networks Technical Report
|
Telstra Corporation Ltd.
,
Telefon AB - LM Ericsson
|
Q3/5
|
2017-10-31 |
|
[ 148 ]
|
Uses analysis of ship-related big data to estimate fuel efficiency, speed and other performance in actual sea
|
Ministry of Communication and Information Technology (MCIT)-Egypt
|
Q9/5
|
2017-10-31 |
|
[ 147 ]
(Rev.1) |
Eco-fee modulation principles in France for EPR
|
Orange
|
Q7/5
|
2017-10-31 |
|
[ 146 ]
(Rev.1) |
Comments and proposed changes to K .44
|
Cisco Systems, Inc.
|
Q2/5
|
2017-10-31 |
|
[ 145 ]
(Rev.1) |
Discussion on passive intermodulation distortions of array antenna systems in mobile communication system
|
China Mobile Communications Corporation
|
Q4/5
|
2017-10-31 |
|
[ 144 ]
(Rev.1) |
First draft of Smart energy solution for telecom base stations(L.SM_BS)
|
Ministry of Industry and Information Technology (MIIT)-China
|
Q6/5
|
2017-10-31 |
|
[ 143 ]
|
Orange's e- Waste Take Back System in Egypt
|
Orange
|
Q7/5
|
2017-10-30 |
|
[ 142 ]
|
Characteristics of Metal Oxide Varistors (MOVs) for the protection of telecommunications installations
|
Huawei Technologies Co., Ltd.
|
Q2/5
|
2017-10-30 |
|
[ 141 ]
(Rev.1) |
Information for the inclusion in K.BPrac
|
Orange
|
Q3/5
|
2017-10-30 |
|
[ 140 ]
(Rev.1) |
Second Draft new Recommendation ITU-T K.wire-line_emc
|
Huawei Technologies Co., Ltd.
|
Q4/5
|
2017-10-30 |
|
[ 139 ]
|
New version v 6.02 of the software "EMF-estimator"
|
ORANGE POLSKA S.A.
|
Q3/5
|
2017-10-30 |
|
[ 138 ]
|
Impact of 5G technology on human exposure
|
Orange
|
Q3/5
|
2017-10-30 |
|
[ 137 ]
|
Impact of EU RED Directive
|
Orange
|
Q3/5
|
2017-10-30 |
|
[ 136 ]
|
EMF in the vicinity of the metallic objects
|
ORANGE POLSKA S.A.
|
Q3/5
|
2017-10-30 |
|
[ 135 ]
(Rev.1) |
Partially edited COM 595 "The draft of Recommendation ITU-T K.appl2"
|
Bourns Limited
|
Q2/5
|
2017-10-30 |
|
[ 134 ]
(Rev.1) |
EMF measurements in different environment
|
ORANGE POLSKA S.A.
|
Q3/5
|
2017-10-30 |
Resultats:106 documents Résultats :
1 -
2 -
3
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):