Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Réunion 2016-09-19 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C (2016-09-19) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Réunion  du 2016-09-19 au 2016-09-30

Lieu : Suisse [Genève]

Autres réunions : 2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Resultats:14 documents
Contributions  [ Source: British Telecommunications Public Ltd. Co. (BT Plc) ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 2211 ]  
 
Average power, ER and OMA proposals in NG-PON2     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2016-09-06
[ 2210 ]  
 
G.fast: Maximal Ratio Transmission over FEXT channels     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-09-06
[ 2209 ]  
 
G.fast: On mixed sampling frequency G.fast vector groups     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-09-06
[ 2208 ]  
 
G.fast: Zero Forcing Pre-coder optimisation     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-09-06
[ 2189 ]  
 
Equipment reflections in NG-PON2     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2016-09-06
[ 2186 ]  
 
xPON Access HRMs and Performance for LTE and CA Applications     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15, Q13/15   2016-09-06
[ 2185 ]  
 
GPON Time Error Transfer performance for a loaded Access System     British Telecommunications Public Ltd. Co. (BT Plc)   Q13/15   2016-09-06
[ 2184 ]  
 
GPON Time Error increase when adding more ONUs     British Telecommunications Public Ltd. Co. (BT Plc)   Q13/15   2016-09-06
[ 2182 ]  
 
VDSL: Long Reach VDSL2     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-09-06
[ 2170 ]  
 
G.fast: Mobile backhaul use cases     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-09-06
[ 2146 ]  
(Rev.1) 
G.fast: A framework for seamless reconfiguration     British Telecommunications Public Ltd. Co. (BT Plc) , Intel Corporation   Q4/15   2016-09-06
[ 2000 ]  
 
Wavelength Plan Proposal for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , Telefon AB - LM Ericsson   Q6/15   2016-09-05
[ 1943 ]  
 
Parameters for pilot tones and message channel for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , China Unicom , Telefon AB - LM Ericsson   Q6/15   2016-09-02
[ 1942 ]  
 
Appendix on Principles of Operation for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , China Unicom , Telefon AB - LM Ericsson   Q6/15   2016-09-02
Resultats:14 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-5-24