Contributions
[ AI/Question: Q6/15 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 2188 ]
|
100G interoperability measurements up to 1600 km as in input to G.698.2
|
Deutsche Telekom AG
|
Q6/15
|
2016-09-06 |
|
[ 2156 ]
+Corr.1 |
Proposal to modify procedural agreement between Q11 and Q6 regarding strong HD-FEC
|
Deutsche Telekom AG
,
Acacia
,
Alcatel-Lucent USA
,
China Unicom
,
Cisco
,
Comcast
,
Coriant
,
Fujitsu
,
Inphi
,
Juniper
,
LM Ericsson
,
NTT
,
Orange
,
Telecom Italia
,
Telefon AB
,
Telefonica
|
Q6/15, Q11/15
|
2016-09-06 |
|
[ 2148 ]
(Rev.1-2) |
Staircase FEC as a candidate for Standard OTU4 MV IaDI Metro application
|
Deutsche Telekom AG
,
Acacia
,
China Unicom
,
Cisco
,
Comcast
,
Coriant
,
Fujitsu
,
Inphi
,
Juniper
,
LM Ericsson
,
NTT
,
Orange
,
Telecom Italia
,
Telefon AB
,
Telefonica
|
Q6/15, Q11/15
|
2016-09-06 |
|
[ 2144 ]
|
Test of EVM scripts for draft revised G.698.2
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2016-09-06 |
|
[ 2143 ]
|
Considerations on optical transceiver module for G.metro
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q6/15
|
2016-09-06 |
|
[ 2126 ]
|
Proposal to enhance the description of the NOSM in G.872
|
ZTE Corporation
|
Q6/15, Q12/15
|
2016-09-06 |
|
[ 2052 ]
|
Requirement of clarify optical layer parameter for some new use cases
|
China Unicom
|
Q9/15, Q6/15
|
2016-09-05 |
|
[ 2047 ]
|
Wavelength plan consideration of G.metro
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2016-09-05 |
|
[ 2045 ]
|
Proposal to study OSNR related issues of beyond 100G physical interface
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2016-09-05 |
|
[ 2044 ]
|
Proposal of communication channel from TEE to HEE in G.metro
|
China Unicom
|
Q6/15
|
2016-09-05 |
|
[ 2043 ]
|
EVM related test results
|
China Unicom
|
Q6/15
|
2016-09-05 |
|
[ 2041 ]
|
Request for information about the SG15/Q6 working process and time schedule to address the application codes and use cases of operators, as well as their interoperability needs at 100G.
|
China Telecommunications Corporation
,
Orange
|
Q6/15
|
2016-09-05 |
|
[ 2016 ]
|
Proposal of reference point specification clarification for optical line interfaces of G.692
|
FiberHome Technologies Group
|
Q6/15, Q12/15
|
2016-09-05 |
|
[ 2000 ]
|
Wavelength Plan Proposal for G.metro
|
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Telefon AB - LM Ericsson
|
Q6/15
|
2016-09-05 |
|
[ 1983 ]
|
EVM test of commercial transponders and impairment simulation setup
|
Ministry of Industry and Information Technology (MIIT)
|
Q6/15
|
2016-09-05 |
|
[ 1979 ]
|
Band Gap and Wavelength Plan Proposal for G.metro
|
Finisar Corporation
|
Q6/15
|
2016-09-04 |
|
[ 1945 ]
|
Proposed modification to Clause 8 of G.872
|
ZTE Corporation
|
Q6/15, Q12/15
|
2016-09-02 |
|
[ 1943 ]
|
Parameters for pilot tones and message channel for G.metro
|
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Unicom
,
Telefon AB - LM Ericsson
|
Q6/15
|
2016-09-02 |
|
[ 1942 ]
|
Appendix on Principles of Operation for G.metro
|
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Unicom
,
Telefon AB - LM Ericsson
|
Q6/15
|
2016-09-02 |
|
[ 1933 ]
|
considerations about the wavelength plan of G.metro
|
ZTE Corporation
|
Q6/15
|
2016-09-02 |
|
[ 1932 ]
|
Considerations on the EVM in the G.698.2
|
ZTE Corporation
,
CAICT
,
Ministry of Industry and Information Technology (MIIT)
|
Q6/15
|
2016-09-02 |
|
[ 1921 ]
|
Physical Layer Implementation Guidance for "Open Line Systems"
|
Xtera Communications, Inc.
|
Q6/15
|
2016-09-01 |
|
[ 1919 ]
|
Impact of pilot tone and message channel on the payload in G.metro
|
ADVA Optical Networking
|
Q6/15
|
2016-09-01 |
Resultats:23 documents
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):