Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Réunion 2016-09-19 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C (2016-09-19) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Réunion  du 2016-09-19 au 2016-09-30

Lieu : Suisse [Genève]

Autres réunions : 2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Resultats:23 documents
Contributions  [ AI/Question: Q6/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 2188 ]  
 
100G interoperability measurements up to 1600 km as in input to G.698.2     Deutsche Telekom AG   Q6/15   2016-09-06
[ 2156 ]  
+Corr.1 
Proposal to modify procedural agreement between Q11 and Q6 regarding strong HD-FEC     Deutsche Telekom AG , Acacia , Alcatel-Lucent USA , China Unicom , Cisco , Comcast , Coriant , Fujitsu , Inphi , Juniper , LM Ericsson , NTT , Orange , Telecom Italia , Telefon AB , Telefonica   Q6/15, Q11/15   2016-09-06
[ 2148 ]  
(Rev.1-2) 
Staircase FEC as a candidate for Standard OTU4 MV IaDI Metro application     Deutsche Telekom AG , Acacia , China Unicom , Cisco , Comcast , Coriant , Fujitsu , Inphi , Juniper , LM Ericsson , NTT , Orange , Telecom Italia , Telefon AB , Telefonica   Q6/15, Q11/15   2016-09-06
[ 2144 ]  
 
Test of EVM scripts for draft revised G.698.2     Huawei Technologies Co., Ltd.   Q6/15   2016-09-06
[ 2143 ]  
 
Considerations on optical transceiver module for G.metro     China Unicom , Huawei Technologies Co., Ltd.   Q6/15   2016-09-06
[ 2126 ]  
 
Proposal to enhance the description of the NOSM in G.872     ZTE Corporation   Q6/15, Q12/15   2016-09-06
[ 2052 ]  
 
Requirement of clarify optical layer parameter for some new use cases     China Unicom   Q9/15, Q6/15   2016-09-05
[ 2047 ]  
 
Wavelength plan consideration of G.metro     China Unicom , ZTE Corporation   Q6/15   2016-09-05
[ 2045 ]  
 
Proposal to study OSNR related issues of beyond 100G physical interface     China Unicom , ZTE Corporation   Q6/15   2016-09-05
[ 2044 ]  
 
Proposal of communication channel from TEE to HEE in G.metro     China Unicom   Q6/15   2016-09-05
[ 2043 ]  
 
EVM related test results     China Unicom   Q6/15   2016-09-05
[ 2041 ]  
 
Request for information about the SG15/Q6 working process and time schedule to address the application codes and use cases of operators, as well as their interoperability needs at 100G.     China Telecommunications Corporation , Orange   Q6/15   2016-09-05
[ 2016 ]  
 
Proposal of reference point specification clarification for optical line interfaces of G.692     FiberHome Technologies Group   Q6/15, Q12/15   2016-09-05
[ 2000 ]  
 
Wavelength Plan Proposal for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , Telefon AB - LM Ericsson   Q6/15   2016-09-05
[ 1983 ]  
 
EVM test of commercial transponders and impairment simulation setup     Ministry of Industry and Information Technology (MIIT)   Q6/15   2016-09-05
[ 1979 ]  
 
Band Gap and Wavelength Plan Proposal for G.metro     Finisar Corporation   Q6/15   2016-09-04
[ 1945 ]  
 
Proposed modification to Clause 8 of G.872     ZTE Corporation   Q6/15, Q12/15   2016-09-02
[ 1943 ]  
 
Parameters for pilot tones and message channel for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , China Unicom , Telefon AB - LM Ericsson   Q6/15   2016-09-02
[ 1942 ]  
 
Appendix on Principles of Operation for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , China Unicom , Telefon AB - LM Ericsson   Q6/15   2016-09-02
[ 1933 ]  
 
considerations about the wavelength plan of G.metro     ZTE Corporation   Q6/15   2016-09-02
[ 1932 ]  
 
Considerations on the EVM in the G.698.2     ZTE Corporation , CAICT , Ministry of Industry and Information Technology (MIIT)   Q6/15   2016-09-02
[ 1921 ]  
 
Physical Layer Implementation Guidance for "Open Line Systems"     Xtera Communications, Inc.   Q6/15   2016-09-01
[ 1919 ]  
 
Impact of pilot tone and message channel on the payload in G.metro     ADVA Optical Networking   Q6/15   2016-09-01
Resultats:23 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-6-20