Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Réunion 2014-03-24 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C (2014-03-24) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Réunion  du 2014-03-24 au 2014-04-04

Lieu : Suisse [Genève]

Autres réunions : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2013-12-06  2013-07-01  2013-02-01 

Resultats:35 documents
Contributions  [ AI/Question: Q9/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 754 ]  
 
Monitoring models for G.8031 protected domain with DNI to support two failures in G.mdsp     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2014-03-11
[ 752 ]  
 
Discussion of transfer time and DRNI for G.mdsp     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2014-03-11
[ 741 ]  
 
Comments on latest G.MDSP Living List     Alcatel-Lucent France   Q9/15   2014-03-11
[ 740 ]  
 
Comments on latest G.MDSP draft     Alcatel-Lucent France   Q9/15   2014-03-11
[ 738 ]  
 
Proposal for Interoperation ability for ODU SMP     China Mobile Communications Corporation   Q9/15   2014-03-11
[ 732 ]  
 
Discussions of Proposed draft text for G.8131     China Mobile Communications Corporation   Q9/15   2014-03-11
[ 723 ]  
 
Considerations on independence of each single protection switching in G.MDSP     China Unicom   Q9/15   2014-03-11
[ 708 ]  
 
Proposal of starting a new work item or modify the existing recommendations on optical layer protection     China Unicom , FiberHome Technologies Group   Q9/15   2014-03-11
[ 688 ]  
 
Optical layer protection requirement of Metro DWDM system     China Unicom , Ericsson Canada, Inc.   Q9/15   2014-03-11
[ 684 ]  
 
Editorial comments on draft G.8131     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2014-03-11
[ 683 ]  
 
Proposed text for Clause 9.3 of draft G.8131     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2014-03-11
[ 681 ]  
 
China Comments and Proposals for C0441 "draft text of G.8131"     Ministry of Industry and Information Technology (MIIT)   Q9/15   2014-03-11
[ 672 ]  
 
Proposals for the function model of G.mdsp     Ministry of Industry and Information Technology (MIIT)   Q9/15   2014-03-11
[ 661 ]  
 
Operation of One-Stage ODU SMP Protocols over B100G links     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2014-03-10
[ 655 ]  
 
Proposal to consent a revision to Recommendation G.8131     SK Telecom   Q9/15   2014-03-10
[ 623 ]  
(Rev.1) 
1-stage and 2-stage Re-definition in ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 622 ]  
 
Message Encoding Set Update for ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 621 ]  
 
1-stage ODU SMP Protocol     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 620 ]  
(Rev.1) 
APS Mechanisms in ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 619 ]  
 
Proposed functional models in MDSP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 618 ]  
 
Interconnection solution for Ethernet linear protection in MDSP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 604 ]  
 
Considerations on control plane derived from G.8080 for G.ODUSMP     China Unicom   Q9/15   2014-03-10
[ 580 ]  
 
Consideration about a requirement for consistency of switching action in G.mdsp     ZTE Corporation   Q9/15   2014-03-10
[ 579 ]  
 
A proposed protection mechanism for a failure use case in G.MDSP     ZTE Corporation   Q9/15   2014-03-10
[ 570 ]  
(Rev.1) 
consideration of recovery network sinario in MDSP     FiberHome Technologies Group   Q9/15   2014-03-10
[ 569 ]  
 
Different switching types in each domain of MDSP     FiberHome Technologies Group   Q9/15   2014-03-10
[ 568 ]  
(Rev.1) 
Consideration of Network Objectives in the latest draft of G.mdsp     FiberHome Technologies Group   Q9/15   2014-03-10
[ 543 ]  
 
Proposed architecture for MPLS-TP linear protection     Fujitsu Limited   Q9/15   2014-03-10
[ 542 ]  
 
2-stage ODU SMP protocol operation in beyond 100G networks     Coriant GmbH & Co. KG   Q9/15   2014-03-09
[ 529 ]  
 
Proposal of Multi-failure processing for ODUsmp     China Unicom , ZTE Corporation   Q9/15   2014-03-09
[ 528 ]  
 
Proposal of APS signalling transmitting pattern for ODUsmp     ZTE Corporation   Q9/15   2014-03-09
[ 499 ]  
 
ODU SMP Lower Order 1-stage signalling     Alcatel-Lucent USA Inc.   Q9/15   2014-03-07
[ 497 ]  
 
ODU SMP Proposal Status     Alcatel-Lucent USA Inc.   Q9/15   2014-03-07
[ 457 ]  
(Rev.1) 
Proposal to finalize work on a revision to Recommendation G.8131     Korea (Rep. of)   Q9/15   2014-03-05
[ 441 ]  
(Rev.1-3) 
Proposed draft text for G.8131     Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co. Ltd.   Q9/15   2014-02-17
Resultats:35 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-6-21