Contributions
[ AI/Question: Q2/15 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 776 ]
|
Proposed revision to G.984.5.2
|
Calix Networks, Inc.
,
Telecom Italia S.p.A.
|
Q2/15
|
2014-03-11 |
|
[ 769 ]
|
Proposed revisions to G.989.2 LC document
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Calix Networks, Inc.
,
Telecom Italia S.p.A.
|
Q2/15
|
2014-03-11 |
|
[ 753 ]
|
Isolation specifications for G.984.5 Revised
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2014-03-11 |
|
[ 739 ]
(Rev.1) |
Proposal of new recommendation on studying wavelength selective optical distribution networks and related system in Q2/SG15
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q2/15
|
2014-03-11 |
|
[ 714 ]
(Rev.1) |
ONU power levelling for NG-PON2: TC layer issues
|
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
SK Telecom
|
Q2/15
|
2014-03-11 |
|
[ 713 ]
|
Proposed parameters for WDM1r in G.984.5
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q2/15
|
2014-03-11 |
|
[ 711 ]
|
Proposal for Preconfigured Backup Channel Attributes
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q2/15
|
2014-03-11 |
|
[ 709 ]
|
Comments on Clause 13 of G.989.3
|
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center
,
Verizon Communication Corporation
,
ZTE Corporation
|
Q2/15
|
2014-03-11 |
|
[ 706 ]
|
NG-PON2 Type B Protection
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2014-03-11 |
|
[ 691 ]
|
proposal for TWDM PON Protection in G.989.1
|
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q2/15
|
2014-03-11 |
|
[ 682 ]
|
Rogue ONU consideration for TWDM-PON
|
ZTE Corporation
|
Q2/15
|
2014-03-11 |
|
[ 668 ]
|
ONU power levelling for NG-PON2: PMD layer issues
|
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
SK Telecom
|
Q2/15
|
2014-03-11 |
|
[ 657 ]
|
Updated revision proposal for G.652.E
|
Corning Incorporated
|
Q6/15, Q5/15, Q2/15
|
2014-03-10 |
|
[ 602 ]
|
Reusing PON-ID as TWDM channel ID
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-03-10 |
|
[ 600 ]
|
Comments to Feb 2014 Q2 interim document "D33_G.989.3-Tuning-States-20140218-VZ-ZTE-HIT-MIT-OKI-NTT_r2"
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-03-10 |
|
[ 586 ]
|
Proposal for time synchronization requirements
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q2/15, Q13/15
|
2014-03-10 |
|
[ 566 ]
+Add.1 |
Proposal to start a new work item on optical distribution networks and related system based on ultra dense wavelength division multiplexing
Addendum 1 to C-0566 is provided by TSB to correct contact information.
|
FiberHome Technologies Group
|
Q2/15
|
2014-03-10 |
|
[ 560 ]
|
Proposal to define and describe wavelength management and control channel in G.multi
|
FiberHome Technologies Group
|
Q2/15
|
2014-03-10 |
|
[ 559 ]
|
Proposal on G.989.2 Amendment for dual-rate PMD implementation
|
FiberHome Technologies Group
|
Q2/15
|
2014-03-10 |
|
[ 557 ]
|
The possibility of CPRI signal transmission over TWDM-PON system in G.989.3
|
FiberHome Technologies Group
|
Q2/15
|
2014-03-10 |
|
[ 483 ]
|
MEF Mobile Backhaul
|
Ericsson Canada, Inc.
|
Q6/15, Q3/15, Q2/15, Q13/15, Q12/15, Q10/15
|
2014-03-07 |
Resultats:21 documents
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):