Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 558 ]
|
Supporting document for Draft K.jup
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q3/5
|
2015-09-26 |
|
[ 557 ]
|
Comments for L.Ass_DC
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/5
|
2015-09-25 |
|
[ 556 ]
|
Proposal for updates of sub-clause 6.2 of ITU-T L.Infrastructure_adaptation on "Landslides" and "Temperature"
|
Korea (Rep. of)
|
Q15/5
|
2015-09-25 |
|
[ 555 ]
|
Proposal for sub-clause 7.6, "Climate change effects by the thunder," of the draft Supplement to Recommendation ITU-T L.1500
|
Korea (Rep. of)
|
Q15/5
|
2015-09-25 |
|
[ 554 ]
|
Proposal for sub-clause 7.5, "Climate change effects by the sea temperature," of the draft Supplement to Recommendation ITU-T L.1500
|
Korea (Rep. of)
|
Q15/5
|
2015-09-25 |
|
[ 553 ]
|
Requirement of energy management in companies involved with the smart factory/manufacturing
|
Korea (Rep. of)
|
Q17/5
|
2015-09-25 |
|
[ 552 ]
(Rev.1) |
Colour and marking of DC cable in Republic of Korea
|
Korea (Rep. of)
|
Q19/5
|
2015-09-25 |
|
[ 551 ]
(Rev.1) |
Functional requirements for energy management systems in green data centres
|
Korea (Rep. of)
|
Q17/5
|
2015-09-25 |
|
[ 550 ]
|
Current standardization activities on smart cities
|
Korea (Rep. of)
|
Q20/5
|
2015-09-25 |
|
[ 549 ]
|
Proposal for sub-clause 8.5, "Possible impacts on energy sector," of the draft Supplement to Recommendation ITU-T L.1500
|
Korea (Rep. of)
|
Q15/5
|
2015-09-25 |
|
[ 548 ]
|
Proposal for the new draft of K.env
|
Korea (Rep. of)
|
Q7/5
|
2015-09-25 |
|
[ 547 ]
|
Draft of "Communication method of printing label to provide rare metals information in ICT goods"
|
Korea (Rep. of)
|
Q13/5
|
2015-09-25 |
|
[ 546 ]
(Rev.1) |
Adjustment of the ICNIRP exposure limits
|
ORANGE POLSKA S.A.
|
Q7/5
|
2015-09-24 |
|
[ 545 ]
(Rev.1) |
Inherently compliant from ICNIRP basic restriction issued as criteria for K. 52 and proposal of new category of "perfectly compliant".
|
National Institute of Information and Communications Technology
,
NTT DoCoMo, Inc.
|
Q7/5
|
2015-09-24 |
|
[ 544 ]
|
K.44 - Resolving the Remote Feeding Telecommunication circuit definition conflict with K.50
|
Bourns Limited
|
Q4/5, Q2/5
|
2015-09-19 |
|
[ 543 ]
|
K.44 Generator updates
|
Bourns Limited
|
Q4/5, Q2/5
|
2015-09-19 |
|
[ 542 ]
|
Proposal for new work program on Recommendations regarding atmospheric radiation effects (soft errors)
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q10/5
|
2015-09-18 |
|
[ 541 ]
(Rev.1) |
K.50 Base Document
|
Littelfuse UK Ltd.
|
Q4/5
|
2015-09-17 |
|
[ 540 ]
|
Draft Revised ITU-T K.67: Expected surges on telecommunication networks due to lightning
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q5/5
|
2015-09-17 |
|
[ 539 ]
(Rev.1-2) |
Electrical parameter classifications of IEC safety standards
|
Bourns Limited
|
Q4/5, Q2/5
|
2015-09-13 |
|
[ 538 ]
(Rev.1) |
In force K.50 (2000) reformatted to 2015 Recommendation template
|
Bourns Limited
|
Q4/5, Q2/5
|
2015-09-12 |
|
[ 537 ]
(Rev.1) |
Review and comment on ATIS-STEP Liaisons received for October 2015 SG5 meeting
|
Bourns Limited
|
Q4/5, Q2/5
|
2015-09-12 |
|
[ 536 ]
(Rev.1-3) |
Draft K.jup: Joint use of poles by power and telecommunications lines: management of the power-cross
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q3/5
|
2015-09-10 |
|
[ 535 ]
(Rev.1) |
K.50 Figure 4 Review: Part 4 of 4
|
Bourns Limited
|
Q4/5, Q2/5
|
2015-09-07 |
|
[ 534 ]
|
Input for CONNECT2020 - Framework for estimating the global electricity usage and GHG emissions of ICT towards 2020
|
Huawei Technologies Co., Ltd.
|
Q18/5
|
2015-09-07 |
|
[ 533 ]
(Rev.1) |
Draft K.tup: Installation of telecommunication equipment on utility poles
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q3/5
|
2015-09-05 |
|
[ 532 ]
|
Standardization to harmonize Eco-rating of mobile phones
- the way to sustainability measures for individual products
|
Huawei Technologies Co., Ltd.
|
Q16/5
|
2015-09-03 |
|
[ 531 ]
|
Huawei on details for functionality moderator in Draft Recommendation ITU-T L.Eco-Rating
|
Huawei Technologies Co., Ltd.
|
Q16/5
|
2015-09-03 |
|
[ 530 ]
|
Questions to be discussed on scope and list of missing criteria in Version 19 (ID140) of Draft Recommendation ITU-T L.Eco-Rating
|
Huawei Technologies Co., Ltd.
|
Q16/5
|
2015-09-03 |
|
[ 529 ]
(Rev.1) |
Do existing eco-rating schemes in reality penalize smartphone functionality?
|
Huawei Technologies Co., Ltd.
|
Q16/5
|
2015-09-03 |
|
[ 528 ]
(Rev.1) |
List of missing criteria in Version 19 (ID140) of Draft Recommendation ITU-T L.Eco-Rating
|
Huawei Technologies Co., Ltd.
|
Q16/5
|
2015-09-03 |
|
[ 527 ]
|
K.50 Figure 4 Review: Part 3
|
Bourns Limited
|
Q4/5, Q2/5
|
2015-08-25 |
|
[ 526 ]
(Rev.1) |
K.50 Figure 4 Review: Part 2
|
Bourns Limited
|
Q4/5, Q2/5
|
2015-08-19 |
|
[ 525 ]
(Rev.1) |
K.50 Figure 4 Review: Part 1
|
Bourns Limited
|
Q4/5, Q2/5
|
2015-08-16 |
|
[ 524 ]
|
Proposed text of new Q20/5 and Q15/5
|
Huawei Technologies Co., Ltd.
|
Q20/5, Q15/5
|
2015-08-11 |
|
[ 523 ]
(Rev.1-2) |
Interaction of switching surge protective components with Ethernet ports
|
Bourns Limited
|
Q2/5
|
2015-08-10 |
Resultats:136 documents Résultats :
Précédent -
1 -
2 -
3
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):