Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C 

UIT-T SG15

Transport network structures

Période d'études 2009

Resultats:68 documents
Résultats :  Précédent -  1 - 2
Contributions  [ Source: ETRI ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 951 ]  
 
Proposal Amendment to G.7041 for 40G & 100G Ethernet transport     ETRI   Q11/15   2010-05-19
[ 950 ]  
 
Proposal Amendment to G.7041 Table V.4     ETRI   Q11/15   2010-05-19
[ 914 ]  
 
A shared mesh protection switching mechanism     ETRI   Q9/15   2010-05-18
[ 913 ]  
 
A proposal of a shared mesh protection architecture in G.gsmp     ETRI   Q9/15   2010-05-18
[ 912 ]  
 
Comments on the G.808.1     ETRI   Q9/15   2010-05-18
[ 911 ]  
 
Addition of examples of APS protocol operation on multiple failures in the next version of G.808.1     ETRI   Q9/15   2010-05-18
[ 910 ]  
 
Support for G.sdapp     KT , ETRI   Q6/15   2010-05-18
[ 909 ]  
(Rev.1) 
Seed signal power in seeded DWDM applications     ETRI   Q6/15   2010-05-18
[ 722 ]  
 
Proposal on the modification of initialization scheme in Ethernet ring protection network in G.8032v1.     ETRI   Q9/15   2009-09-20
[ 618 ]  
 
Proposal for mapping of client signals over LO OPU4     ETRI   Q11/15   2009-09-20
[ 617 ]  
 
Comments on OTM-0.mvn in draft revised G.709 v3.4     ETRI   Q11/15   2009-09-20
[ 596 ]  
 
FDB flush scheme for G.8032 Ethernet ring protection     ETRI   Q9/15   2009-09-18
[ 566 ]  
 
Considerations on the coexistence of Forced Switch and Signal Fail in G.8032 v2     ETRI   Q9/15   2009-09-18
[ 279 ]  
 
G.8032 protection switching transient traffic performance requirement for next study period     ETRI (Republic of Korea)   Q9/15   2008-11-23
[ 278 ]  
 
FDB-delete scheme for fast protection switching in G.8032 Ethernet ring protection     ETRI (Korea, Republic of)   Q9/15   2008-11-23
[ 171 ]  
 
Comments on draft Recommendation G.8032 Version 2     ETRI   Q9/15   2008-11-21
[ 156 ]  
 
State machine modification for forced switch in G.8032 Version 2     ETRI, Korea (Republic of)   Q9/15   2008-11-21
[ 148 ]  
 
Proposal on the modification of the state machine initialization and some figures in G.8032v2     ETRI   Q9/15   2008-11-21
Resultats:68 documents
Résultats :  Précédent -  1 - 2  
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-5-15