Contributions
[ Source: BT ]  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 2389 ]
|
Implementation of L2.bis modes in ADSL2Plus
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-29 |
|
[ 2351 ]
|
Scope of Q2, as applies to access vs. OTN
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q2/15, Q12/15
|
2012-08-28 |
|
[ 2330 ]
|
G.FAST: On TDD frame size
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2329 ]
|
G.FAST: On LDPC versus RS+TC
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2328 ]
|
G.FAST: On selection of RTX scheme
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2326 ]
|
G.FAST: On dynamic asymmetry ratio
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2325 ]
|
G.FAST: On managing FTTdp functional elements that may have intermitted powering
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2317 ]
|
Extended RAM Option for Retransmission in VDSL2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2316 ]
(Rev.1) |
G.FAST: FTTdp Power Budget
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2315 ]
|
Impact of Sources of Experimental Error on KL0 Determination
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2291 ]
(Rev.1) |
Optical Splitter Insertion Loss data representation
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q7/15
|
2012-08-28 |
|
[ 2010 ]
(Rev.1) |
Proposed revision of G.698.1 to include low-cost bi-directional WDM-systems
|
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Electronics and Telecommunications Research Institute (ETRI)
,
Gemfire Europe Limited
,
LG-Ericsson
,
Nokia Siemens Networks GmbH & Co. KG
,
Oclaro Technology plc
|
Q6/15
|
2012-08-24 |
|
[ 2005 ]
(Rev.1) |
BT proposal for Q 5. SG15 Study topics for Study Period 2013 - 2016
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q5/15
|
2012-08-23 |
|
[ 1921 ]
|
[G.ADSL] Low Power ADSL2 (and ADSL2plus)
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1913 ]
(Rev.1) |
[G.vdsl] Proposal to develop a VDSL2bis recommendation
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1910 ]
(Rev.1) |
G.VDSL2: Accuracy Requirements for KL0
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1899 ]
(Rev.1) |
[G.fast] BT requirements for G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1865 ]
(Rev.1) |
[G.fast] Clarification of BT requirement for SELT
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1859 ]
(Rev.1) |
[G.fast] G.fast start-up using G.994.1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1811 ]
(Rev.1) |
[G.fast] TDD Framing Parameters for G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1737 ]
(Rev.1) |
Gigabit-capable Passive Optical Networks (G PON): Reach Extension; Contribution to Amendment 2: Raman amplified G-PON extender
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
OFS Fitel, LLC
|
Q2/15
|
2011-11-21 |
|
[ 1471 ]
|
G.vdsl, G.hn: BT's FTTdp Vision
|
BT
|
Q4/15
|
2011-02-02 |
|
[ 1441 ]
|
Withdrawn: MPLS-TP Standards
|
BT
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-02 |
|
[ 1423 ]
|
Draft baseline text describing the Alternative Electrical Length Estimation Method (AELEM)
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1422 ]
|
G.adsl: G.vdsl : Low Power Modes for Remote VDSL2 Nodes
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1421 ]
|
G.VDSL: INM INPEQ Histogram
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1419 ]
|
G.VDSL: INM IAT Histogram
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1417 ]
|
G.LT: PSD Shaped SELT
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1403 ]
|
G.gen: G.hn: G.vdsl: Reference Modelling for FTTdp Final Drops - For Information
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1402 ]
|
G.gen: G.hn: G.vdsl: RF Ingress above 30 MHz - For Information
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1393 ]
|
G.INP: VDSL2 will require retransmission upstream
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1391 ]
|
Synchronisation Budget
|
BT
|
Q13/15
|
2011-02-01 |
|
[ 1388 ]
|
Multiple Independent Timing Domains
|
BT
|
Q13/15
|
2011-02-01 |
|
[ 1370 ]
|
Comments on working assumption at Berlin meeting and TD377 (wd31r1)
|
NSN
,
BT
,
Cisco
,
Ericsson
,
Juniper
,
Qwest
,
Telenor
,
Verizon
|
Q9/15, Q12/15, Q10/15
|
2011-02-01 |
|
[ 1365 ]
|
Status of IETF OAM tools for MPLS-TP
|
NSN
,
BT
,
Cisco
,
Ericsson
,
Juniper
,
Qwest
,
Telenor
,
Verizon
|
Q10/15
|
2011-02-01 |
|
[ 1339 ]
|
Fulfilling the OAM Requirements for MPLS-TP
|
NSN
,
BT
,
Cisco
,
Ericsson
,
Juniper
,
Qwest
,
Telenor
,
Verizon
|
Q10/15
|
2011-02-01 |
|
[ 1305 ]
|
Procedural issues on MPLS-TP
|
Cisco
,
AT&T
,
BT
,
Juniper
,
Qwest
,
Telenor
,
Telstra
,
Verizon
|
Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-02-01 |
|
[ 1304 ]
|
Proposed text for G.tpoam
|
Cisco
,
BT
,
Ericsson
,
Juniper
,
NSN
,
Qwest
,
Telenor
,
Verizon
|
Q10/15
|
2011-02-01 |
|
[ 1303 ]
|
Inter SDO Cooperation on MPLS-TP
|
Cisco
,
AT&T
,
BT
,
Juniper
,
Qwest
,
Telenor
,
Telstra
,
Verizon
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5
|
2011-02-01 |
|
[ 1302 ]
|
Technical issues with an OAM protocol based on draft-bhh-mpls-tp-oam-y1731
|
Cisco
,
BT
,
Juniper
,
NSN
,
Qwest
,
Telenor
,
Telstra
,
Verizon
|
Q10/15
|
2011-02-01 |
|
[ 1301 ]
|
Operator Requirements for MPLS-TP OAM
|
Verizon
,
BT
,
France Telecom Orange
,
Qwest
,
Telenor
,
Telstra
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-01 |
|
[ 1146 ]
|
G.671 PON Splitter Amendment
|
BT
|
Q7/15
|
2011-01-28 |
|
[ 1145 ]
|
G.652E - Telecommunications fibres with improved performance inheriting their specification from G.657a1
|
BT
|
Q5/15
|
2011-01-28 |
|
[ 1144 ]
|
ITU-T G.652(E) & G.657 Telecommunications fibres - Enhanced Geometry Amendment
|
BT
|
Q5/15
|
2011-01-28 |
|
[ 1000 ]
|
Scale factors for ADSL2+ Virtual Noise
|
BT
|
Q4/15
|
2010-05-20 |
|
[ 984 ]
|
KL0bis and Estimation of Electrical Length in VDSL2
|
BT
|
Q4/15
|
2010-05-20 |
|
[ 975 ]
|
ADSL2/ADSl2plus: L2bis mode operator requirements
|
BT
|
Q4/15
|
2010-05-19 |
|
[ 973 ]
|
G.LT - Impulsive Noise Measurement
|
BT
|
Q4/15
|
2010-05-19 |
|
[ 971 ]
|
G.hn: Broadcast Radio Protection
|
BT
|
Q4/15
|
2010-05-19 |
|
[ 968 ]
|
G.LT Transmit PSD and Local Regulation
|
BT
|
Q4/15
|
2010-05-19 |
Resultats:77 documents Résultats :
1 -
2
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):