Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C 

UIT-T SG15

Transport network structures

Période d'études 2009

Resultats:200 documents
Résultats :  Précédent -  1 - 2 - 3 - 4  - Suivant Next
Contributions  [ AI/Question: Q11/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1620 ]  
(Rev.1) 
Proposal on the 1588v2 over OTN by OSC     FiberHome Technologies Group , ZTE Corporation   Q13/15, Q11/15   2011-11-19
[ 1617 ]  
 
Withdrawn: Duplicate of C-1620  
Withdrawn
 
FiberHome Technologies Group , ZTE Corporation   Q13/15, Q11/15   2011-11-19
[ 1615 ]  
(Rev.1) 
MSI Mismatch alarm issues connected with Auto PT enabled systems interconnecting new OTN equipment (PT=21) with old equipment (PT=20)     Ciena Corporation   Q9/15, Q11/15   2011-11-19
[ 1608 ]  
(Rev.1) 
Considerations for ODU5     Alcatel-Lucent USA Inc.   Q6/15, Q11/15   2011-11-19
[ 1578 ]  
(Rev.1) 
Network Defect Handling for Hitless Adjustment to ODUflex(GFP) (HAO) During Bandwidth Resizing (BWR)     PMC-Sierra, Inc.   Q11/15   2011-11-18
[ 1577 ]  
(Rev.1) 
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Measurement Time References     PMC-Sierra, Inc.   Q11/15   2011-11-18
[ 1574 ]  
(Rev.1) 
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Latency-based Approach     PMC-Sierra, Inc.   Q11/15   2011-11-18
[ 1573 ]  
(Rev.1) 
Flexible Rate OTU signal     Finisar Corporation , Infinera Corporation , Verizon Communication Corporation   Q6/15, Q12/15, Q11/15   2011-11-18
[ 1568 ]  
 
Proposal and Comments on MPLS-TP     Cisco Systems, Inc. , Ericsson, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-11-18
[ 1541 ]  
(Rev.1) 
G.7044 impact on G.7713     Ciena Canada   Q14/15, Q11/15   2011-11-17
[ 1520 ]  
 
DOCUMENT WITHDRAWN     Deutsche Telekom   Q6/15, Q11/15   2011-08-23
[ 1519 ]  
 
New OTN interfaces in ITU-T G.709     Deutsche Telekom   Q6/15, Q11/15   2011-07-11
[ 1493 ]  
 
G.hao impact on G.7713     Ciena Corporation   Q14/15, Q11/15   2011-02-02
[ 1490 ]  
 
Considerations on ODUflex and ODUflex resizing     Ciena Corporation   Q11/15   2011-02-02
[ 1451 ]  
 
Analysis of phase/time distribution over OTN networks     France Telecom   Q9/15, Q13/15, Q11/15   2011-02-02
[ 1420 ]  
 
Functional model of HAO     Huawei   Q9/15, Q11/15   2011-02-01
[ 1414 ]  
 
Proposal for addition of HO OPU mapping types in G.709     ETRI   Q11/15   2011-02-01
[ 1413 ]  
 
Proposed modification of G.709 (12/2009) Appendix XII for inclusion in G.709 Amendment 2     ETRI   Q11/15   2011-02-01
[ 1412 ]  
 
Addition of new Appendix/G.7041 for ODUflex(GFP) packet data throughput     ETRI   Q11/15   2011-02-01
[ 1401 ]  
 
Improvement of Annex E/G.709 (40GbE/100GbE transport over OTN)     NTT   Q9/15, Q11/15   2011-02-01
[ 1378 ]  
 
ODUflex(GFP) Recommended Bit Rates     Alcatel-Lucent   Q9/15, Q11/15   2011-02-01
[ 1346 ]  
 
Nested Restoration Domains - Data-plane maintenance overhead signals     Tellabs Oy   Q9/15, Q12/15, Q11/15   2011-02-01
[ 1319 ]  
 
PCSL error control block insertion and BIP8 transparency for 100GBASE-R/ODU4     Fujitsu , CIAJ , Hitachi , Mitsubishi , NEC   Q9/15, Q11/15   2011-02-01
[ 1305 ]  
 
Procedural issues on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-02-01
[ 1279 ]  
 
Consideration on TS sequence in HAO     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1277 ]  
 
Proposals to clarify the definition and usage of RP bit and add a resizing state machine to G.HAO     ZTE   Q11/15   2011-01-31
[ 1260 ]  
 
Consideration on OTU5 (400G)     Huawei   Q11/15   2011-01-31
[ 1258 ]  
 
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1246 ]  
 
A proposal to fault scenario analysis of draft G.hao     ETRI   Q11/15   2011-01-31
[ 1245 ]  
 
A proposal to session timer for draft G.hao     ETRI   Q11/15   2011-01-31
[ 1210 ]  
 
The support of OSC transmition 1588V2 in OTN/G.798.1     Fiberhome Technologies Group , China Academy of Telecommunication Research   Q9/15, Q13/15, Q11/15   2011-01-31
[ 1184 ]  
 
Rate Change Considerations during BWR in G.hao     PMC-Sierra   Q11/15   2011-01-31
[ 1183 ]  
 
Clarifications to G.hao     PMC-Sierra   Q11/15   2011-01-31
[ 1175 ]  
 
Considerations on 100GE PCS BIP8 Transparency     Avalon Microelectronics   Q11/15   2011-01-31
[ 1098 ]  
 
Optional metro FEC for OTU4     Deutsche Telekom   Q11/15   2010-05-24
[ 1097 ]  
 
ODUflex resizing and multi-carrier applications     Deutsche Telekom   Q12/15, Q11/15   2010-05-24
[ 1070 ]  
 
1588v2 transmission by OSC over OTN     FiberHome , CATR , ZTE   Q13/15, Q11/15   2010-05-21
[ 1068 ]  
 
Synchronization Requirement in OTN     CMCC   Q13/15, Q11/15   2010-05-21
[ 1067 ]  
 
GPS timing receiver characterization     Symmetricom , CATR , CMCC   Q13/15, Q11/15   2010-05-21
[ 1066 ]  
 
Analysis of time synchronization performance using PTP in hybrid transport network     CMCC , CATR , ZTE   Q13/15, Q11/15   2010-05-21
[ 1036 ]  
(Rev.1) 
Consideration on Phase/Time synchronization over OTN     ZTE   Q13/15, Q11/15   2010-05-20
[ 1019 ]  
 
G.8251: OTN timing aspects     France Télécom   Q13/15, Q11/15   2010-05-20
[ 970 ]  
 
Timing Transparency over OTN     Alcatel-Lucent Germany   Q13/15, Q11/15   2010-05-19
[ 963 ]  
 
Fibre Channel and Infiniband Jitter Accumulation over OTN Islands     Huawei   Q13/15, Q11/15   2010-05-19
[ 952 ]  
 
Additional Requirement for ODUflex hitless resizing     ETRI   Q11/15   2010-05-19
[ 951 ]  
 
Proposal Amendment to G.7041 for 40G & 100G Ethernet transport     ETRI   Q11/15   2010-05-19
[ 950 ]  
 
Proposal Amendment to G.7041 Table V.4     ETRI   Q11/15   2010-05-19
[ 949 ]  
 
Mapping method to support timing over OTN     Huawei   Q13/15, Q11/15   2010-05-19
[ 948 ]  
 
Implementation analysis of timing over OTN     Huawei   Q13/15, Q11/15   2010-05-19
[ 947 ]  
 
Consideration on OTU5 definition     Huawei   Q11/15   2010-05-19
Resultats:200 documents
Résultats :  Précédent -  1 - 2 - 3 - 4  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-5-15