Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2011-12-05 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2011-12-05) 

UIT-T SG15

Transport network structures

Période d'études 2009

Réunion  du 2011-12-05 au 2011-12-16

Lieu : Suisse [Genève]

Autres réunions : 2012-09-10  2012-05-11  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Resultats:16 documents
Contributions  [ Source: ZTE ]  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1841 ]  
 
Proposal of RS422 1PPS time/phase as a time measurement interface     China , China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q13/15   2011-11-22
[ 1690 ]  
(Rev.1) 
Proposal to study the convergence of PON and transport network in the next study period     ZTE Corporation   Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-11-21
[ 1689 ]  
(Rev.1) 
Proposal to study the convergence of optical and packet in the next study period     ZTE Corporation   Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2011-11-21
[ 1676 ]  
(Rev.1) 
Noises Introduced by Boundary Clocks     ZTE Corporation   Q13/15   2011-11-21
[ 1674 ]  
(Rev.1) 
G.8265 and G.8265.1 Editorial change     ZTE Corporation   Q13/15   2011-11-21
[ 1673 ]  
(Rev.1) 
Time transient build out and time offset response     China Mobile Communications Corporation , ZTE Corporation   Q13/15   2011-11-21
[ 1672 ]  
(Rev.1) 
The mixed SSM_PTP application for frequency synchronization     China , China Mobile Communications Corporation , ZTE Corporation   Q13/15   2011-11-21
[ 1667 ]  
(Rev.1) 
Proposal of the combination of jumping and sliding window     ZTE Corporation   Q13/15   2011-11-21
[ 1662 ]  
(Rev.1) 
Comments on G.8260 latest draft     ZTE Corporation   Q13/15   2011-11-21
[ 1660 ]  
(Rev.1) 
Proposal of 1pps as an external interface of PEC     China Mobile Communications Corporation , ZTE Corporation   Q13/15   2011-11-21
[ 1659 ]  
(Rev.1) 
Proposals on the validation of the PTP master     China , China Mobile Communications Corporation , ZTE Corporation   Q13/15   2011-11-21
[ 1657 ]  
(Rev.1) 
Proposals on the factors used for the master selection of time/phase sync     China , China Mobile Communications Corporation , ZTE Corporation   Q13/15   2011-11-21
[ 1655 ]  
(Rev.1) 
Analysis of selection window and oscillator     China , ZTE Corporation   Q13/15   2011-11-21
[ 1654 ]  
(Rev.1) 
Analysis about timestamp process of PTP event packet     ZTE Corporation   Q13/15   2011-11-21
[ 1620 ]  
(Rev.1) 
Proposal on the 1588v2 over OTN by OSC     FiberHome Technologies Group , ZTE Corporation   Q13/15, Q11/15   2011-11-19
[ 1617 ]  
 
Withdrawn: Duplicate of C-1620  
Withdrawn
 
FiberHome Technologies Group , ZTE Corporation   Q13/15, Q11/15   2011-11-19
Resultats:16 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-6-7