Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1168 ]
|
G.ptneq consent
|
Canada
|
Q9/15
|
2011-01-31 |
|
[ 1167 ]
|
PBB model for G.8021 & G.8010
|
Ericsson Canada
|
Q9/15, Q14/15, Q12/15
|
2011-01-31 |
|
[ 1166 ]
|
Comparison of J.211 and Synchronous Ethernet/IEEE 1588
|
Zarlink Semiconductor
|
Q13/15
|
2011-01-31 |
|
[ 1165 ]
|
MPLS and Y.1731
|
Ericsson Canada
|
Q10/15
|
2011-01-31 |
|
[ 1164 ]
|
MAC Operations using Y.1731
|
Alcatel-Lucent USA
,
Verizon
|
Q9/15, Q14/15, Q10/15
|
2011-01-31 |
|
[ 1163 ]
|
Proposal for a structure for the Recommendation ITU-T G.8272
|
IDT
|
Q13/15
|
2011-01-31 |
|
[ 1162 ]
|
Proposal for the scope of the Recommendation ITU-T G.8273
|
IDT
|
Q13/15
|
2011-01-31 |
|
[ 1161 ]
|
MAC Operations using Y.1731 Motivation and Rationale
|
Alcatel-Lucent USA
,
Verizon
|
Q9/15, Q14/15, Q10/15
|
2011-01-31 |
|
[ 1160 ]
|
Roles and Layers for G.ptneq
|
NSN
|
Q9/15
|
2011-01-31 |
|
[ 1159 ]
|
Future revision to Recommendation ITU-T G.657 (bend insensitive SMF)
|
Corning
|
Q5/15
|
2011-01-31 |
|
[ 1158 ]
|
Future revision to Recommendation ITU-T G.654
|
Corning
|
Q8/15, Q5/15
|
2011-01-31 |
|
[ 1157 ]
|
G.ploam: Proposed Text for Upstream Xlog Test Parameter
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1156 ]
|
G.vector: Proposal for Upstream Xlog Test Parameter for G.vector
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1155 ]
|
G.hnem: G.hnem management
|
ASSIA
,
AT&T
,
Aware
,
Maxim Integrated Product
,
Texas Instruments
|
Q4/15
|
2011-01-31 |
|
[ 1154 ]
|
G.Gen, G.hx, G.cx: G.hn and G.cx management
|
ASSIA
,
AT&T
,
Aware
,
Marvell Semiconductor
|
Q4/15
|
2011-01-31 |
|
[ 1153 ]
|
G.hn: Time-Varying Broadband Powerline (BPL) Interference into VDSL2
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1152 ]
|
G.hn: Broadband Powerline (BPL) Interference into VDSL2 on Drop Lines: Measurements and Analyses
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1151 ]
|
Wavelength Proposal on TEE to HEE direction in G.sdapp
|
ZTE
|
Q6/15
|
2011-01-31 |
|
[ 1150 ]
|
G.inp: Update to G.inp working text on OLR transition time with VDSL2
|
Ikanos
|
Q4/15
|
2011-01-30 |
|
[ 1149 ]
|
G.INP: Proposed messages for SRA in ADSL mode
|
Broadcom
,
Ikanos
|
Q4/15
|
2011-01-30 |
|
[ 1148 ]
|
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"
|
AT&T
|
Q4/15
|
2011-01-30 |
|
[ 1147 ]
(Rev.1) |
G.vdsl: Framework for sending t1t4 timestamp messages in eoc for ToD phase synchronization
|
Ikanos
|
Q4/15
|
2011-01-30 |
|
[ 1146 ]
|
G.671 PON Splitter Amendment
|
BT
|
Q7/15
|
2011-01-28 |
|
[ 1145 ]
|
G.652E - Telecommunications fibres with improved performance inheriting their specification from G.657a1
|
BT
|
Q5/15
|
2011-01-28 |
|
[ 1144 ]
|
ITU-T G.652(E) & G.657 Telecommunications fibres - Enhanced Geometry Amendment
|
BT
|
Q5/15
|
2011-01-28 |
|
[ 1143 ]
(Rev.1) |
MPLS-TP Standards
|
United Kingdom
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-01-28 |
|
[ 1142 ]
|
Multilane interface jitter specification
|
JDSU
|
Q15/15
|
2011-01-28 |
|
[ 1141 ]
|
Proposal for the OTN specific management entity of G.874.1
|
Fiberhome Technologies Group
|
Q14/15
|
2011-01-28 |
|
[ 1140 ]
|
Proposal for G.sdapp transmitter and receiver parameters
|
LG-Ericsson
|
Q6/15
|
2011-01-28 |
|
[ 1139 ]
|
Proposal for G.sdapp general parameters and optical path parameters
|
LG-Ericsson
|
Q6/15
|
2011-01-28 |
|
[ 1138 ]
|
Some parameter definitions for G.sdapp
|
LG-Ericsson
|
Q6/15
|
2011-01-28 |
|
[ 1137 ]
|
Cross talk penalty calculations for G.sdapp
|
LG-Ericsson
|
Q6/15
|
2011-01-28 |
|
[ 1136 ]
|
Commonalities of G.sdapp frequency grid proposals
|
LG-Ericsson
|
Q6/15
|
2011-01-28 |
|
[ 1135 ]
|
Impairments in seeded DWDM Systems
|
LG-Ericsson
|
Q6/15
|
2011-01-28 |
|
[ 1134 ]
|
Revised Clause 6.1 in G.8271
|
Ericsson
|
Q13/15
|
2011-01-28 |
|
[ 1133 ]
|
Comment and suggestion for Up and Down MEPs in G.tpoam
|
Fiberhome Technologies Group
|
Q10/15
|
2011-01-28 |
|
[ 1132 ]
|
Proposal for adding new definitions in ITU-T new recommendation L.pon
|
Fiberhome Technologies, MII China
|
Q18/15
|
2011-01-28 |
|
[ 1131 ]
|
Comment and suggestion for OLT state machine in G.987.3
|
Fiberhome Technologies Group
|
Q2/15
|
2011-01-28 |
|
[ 1130 ]
|
Add topoly usecase in G.8152
|
ZTE Corporation
|
Q14/15
|
2011-01-28 |
|
[ 1129 ]
|
Add topoly support in G.8151
|
ZTE Corporation
|
Q14/15
|
2011-01-28 |
|
[ 1128 ]
|
Proposal to support logical ONU ID in G.988
|
China Telecom, Ericsson, Huawei
|
Q2/15
|
2011-01-28 |
|
[ 1127 ]
(Rev.1) |
Proposal to define IPv6 host config ME in G.988
|
Ericsson, AT&T, Alcatel-Lucent
|
Q2/15
|
2011-01-28 |
|
[ 1126 ]
|
Situation 2 in G.680 - Considerations on Approach 1 and Approach 2
|
Italy
|
Q6/15
|
2011-01-28 |
|
[ 1125 ]
|
Development of formulae and/or equations to predict the non-linear penalty from available DWDM line segment parameters ( Approach 1 ) to move forward the revision of Recommendation G.680 with respect to the development of Situation 2
|
ISCTI
|
Q6/15
|
2011-01-28 |
|
[ 1124 ]
|
Structure and content of the MPLS-TP Recommendations
|
CMCC,CT , CATR
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-01-28 |
|
[ 1123 ]
|
Associated Channel Type for G.tpoam
|
CMCC, CT,CATR
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-01-28 |
|
[ 1122 ]
|
Protection of blinking failures
|
Ericsson
|
Q9/15
|
2011-01-27 |
|
[ 1121 ]
|
Addition of Subcarrier Multiplexing (SCM) as one of the line coding schemes in section 7 of G.Sup39
|
Ericsson
|
Q6/15
|
2011-01-27 |
|
[ 1120 ]
|
Fiber link asymmetry compensation
|
Ericsson
|
Q6/15, Q13/15
|
2011-01-27 |
|
[ 1119 ]
|
Standardization of modulation formats
|
ZTE Corporation
|
Q6/15
|
2011-01-27 |
Resultats:418 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):