Contributions
[ Source: Huawei ]  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1095 ]
|
OMCI for Configuring ATM and Ethernet pseudowire
|
Huawei
|
Q2/15
|
2010-05-21 |
|
[ 1092 ]
|
Proposal of PTN Equipment Types
|
CMCC
,
Huawei
|
Q9/15
|
2010-05-21 |
|
[ 1091 ]
|
Proposal on state transition in G.8031
|
Huawei
|
Q9/15
|
2010-05-21 |
|
[ 1090 ]
|
SD triggered protection switching in G.8031
|
CATR
,
Huawei
|
Q9/15
|
2010-05-21 |
|
[ 1089 ]
|
Proposal on linear protection in G.ptneq
|
Huawei
|
Q9/15
|
2010-05-21 |
|
[ 1088 ]
|
Example of ACL-SNCG/I application in adaptive bandwidth network scenario
|
Huawei
|
Q9/15
|
2010-05-21 |
|
[ 1087 ]
|
Proposed work items on adaptive bandwidth in G.8031
|
Huawei
|
Q9/15
|
2010-05-21 |
|
[ 1086 ]
|
Proposal text on ACL-SNCG/I for adaptive bandwidth in G.808.1
|
Huawei
|
Q9/15
|
2010-05-21 |
|
[ 1085 ]
|
Proposed text for Shared Mesh Protection
|
Telefonica Investigacion y Desarrollo
,
Huawei
|
Q9/15
|
2010-05-21 |
|
[ 1084 ]
|
Discussion on the state machine model for gsmp
|
Telefonica Investigacion y Desarrollo
,
Huawei
|
Q9/15
|
2010-05-21 |
|
[ 1083 ]
|
Proposal of the architecture of gsmp
|
Telefonica Investigacion y Desarrollo
,
China Unicom
,
Huawei
|
Q9/15
|
2010-05-21 |
|
[ 1082 ]
|
Discussion on APS of Shared Mesh Protection
|
Telefonica Investigacion y Desarrollo
,
China Unicom
,
Huawei
|
Q9/15
|
2010-05-21 |
|
[ 1065 ]
|
Proposal of accelerating MTIE and TDEV mask study for time synchronization
|
CMCC
,
CATR
,
Huawei
,
ZTE
|
Q13/15
|
2010-05-21 |
|
[ 1060 ]
|
Objectives and Requirements for G.827x Recommendations
|
CATR
,
Huawei
|
Q13/15
|
2010-05-21 |
|
[ 1056 ]
|
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39
|
CATR
,
Huawei
|
Q6/15
|
2010-05-21 |
|
[ 1051 ]
|
Proposal on adding bandwidth degradation message in Y.1731
|
Huawei
|
Q10/15
|
2010-05-20 |
|
[ 1050 ]
|
Proposal of suggestions on procedures to build physical impairments models for signal quality evaluation in G.680
|
Huawei
|
Q6/15
|
2010-05-20 |
|
[ 1049 ]
|
Propose to add the monitoring time requirement based on application scenarios in G.697
|
Huawei
|
Q6/15
|
2010-05-20 |
|
[ 1047 ]
|
Proposal on considerations of interactions of PMD and filtering effects with nonlinear effects in optical transmissions in G.680
|
Huawei
|
Q6/15
|
2010-05-20 |
|
[ 1046 ]
|
G.vdsl: Proposed Text for Distribution of Time-of-Day over VDSL2 Links
|
Huawei
,
MIIT
|
Q4/15
|
2010-05-20 |
|
[ 1045 ]
|
G.vdsl: More on Distribution of Time-of-Day over VDSL2 Links
|
Huawei
,
China Telecom
,
MIIT
|
Q4/15
|
2010-05-20 |
|
[ 1012 ]
|
Living List for XG-PON Transmission Convergence layer specification
|
Huawei
,
Mitsubishi
,
Motorola
|
Q2/15
|
2010-05-20 |
|
[ 1001 ]
|
Equivalence of the IEEE 1588 Boundary Clock and Peer-to-Peer Transparent Clock for Synchronization Transport
|
Huawei
|
Q13/15
|
2010-05-20 |
|
[ 999 ]
|
Functional Model of Hitless Adjustment of ODUflex
|
Huawei
|
Q9/15
|
2010-05-20 |
|
[ 980 ]
|
Proposal for Desynchronizer Bandwidths, GMP Mapping Granularities, and Mapper Buffer Hysteresis Values for new OTN clients and ODUs, for ITU-T Recommendations G.8251and G.798
|
Huawei
,
Alcatel-Lucent Germany
|
Q9/15, Q13/15
|
2010-05-20 |
|
[ 976 ]
|
Proposal for ODCb Transient Response for G.8251 Section A.8, to Reflect New CBR Clients having ±100 ppm Frequency Tolerance
|
Huawei
,
Alcatel-Lucent Germany
|
Q13/15
|
2010-05-19 |
|
[ 972 ]
|
Further Analysis of RMS Frequency Offset for a CPRI Client Transported over OTN
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 969 ]
|
New Results for Serial Digital Interface Video Client Jitter and Wander Accumulation over OTN Islands
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 967 ]
|
Additional Simulation Results for Peak-to-Peak Phase and RMS Frequency Offset for Transport of a CPRI Client over OTN
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 965 ]
|
Further Simulation Results for syncE and STM-1 Jitter and Wander Accumulation over Networks of OTN Islands
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 963 ]
|
Fibre Channel and Infiniband Jitter Accumulation over OTN Islands
|
Huawei
|
Q13/15, Q11/15
|
2010-05-19 |
|
[ 960 ]
|
HO/LO ODUk SRP individual and group protection wavelength set
|
Huawei
|
Q9/15
|
2010-05-19 |
|
[ 953 ]
|
Protecting broadcast TV distribution in the OTN
|
Huawei
|
Q9/15
|
2010-05-19 |
|
[ 949 ]
|
Mapping method to support timing over OTN
|
Huawei
|
Q13/15, Q11/15
|
2010-05-19 |
|
[ 948 ]
|
Implementation analysis of timing over OTN
|
Huawei
|
Q13/15, Q11/15
|
2010-05-19 |
|
[ 947 ]
|
Consideration on OTU5 definition
|
Huawei
|
Q11/15
|
2010-05-19 |
|
[ 946 ]
|
Requirements for EVPL, EVPT, EVPLAN, EPT and EVPLAN service support in the OTN
|
Huawei
|
Q9/15, Q11/15, Q10/15
|
2010-05-19 |
|
[ 945 ]
|
OTN topological architecture model and components
|
Huawei
|
Q9/15, Q12/15
|
2010-05-19 |
|
[ 941 ]
|
Comment on G.798.1 (WD04, Darmstadt)
|
Huawei
|
Q9/15
|
2010-05-19 |
|
[ 905 ]
|
Telecom Slave - State Machine Operations
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 904 ]
|
G.827x Recommendations - High-Level Objectives
|
Huawei
,
CATR
,
MII
|
Q13/15
|
2010-05-18 |
|
[ 903 ]
|
Pulse-Per-Second Interface
|
Huawei
,
CATR
,
China Mobile Communications Corporation
,
MII
|
Q13/15
|
2010-05-18 |
|
[ 902 ]
|
PTP Profile Data Set Members
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 901 ]
|
G.8264 ESMC Processing for G.8011.x Ethernet Services Types
|
Huawei
|
Q13/15, Q10/15
|
2010-05-18 |
|
[ 900 ]
|
Comments and Editorial Remarks for G.8265.1
|
Huawei
|
Q13/15, Q10/15
|
2010-05-18 |
|
[ 899 ]
|
Updated Telecom Slave Model
|
Huawei
,
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 898 ]
|
Flag Fields
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 897 ]
|
Test Results of IEEE1588v2 hop-by-hop time synchronization using Boundary Clocks
|
Huawei
,
China Mobile Communications Corporation
|
Q13/15
|
2010-05-18 |
|
[ 896 ]
|
The use of SyncE and IEEE1588v2 for Time Distribution
|
Huawei
,
China Mobile Communications Corporation
|
Q13/15
|
2010-05-18 |
|
[ 895 ]
|
ESMC Transport over GPON
|
Huawei
,
BT
|
Q2/15, Q13/15
|
2010-05-18 |
Resultats:54 documents Résultats :
1 -
2
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):