Contributions
[ Source: Huawei Technologies ]  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 745 ]
|
Supporting a broadband backhaul application in the PTN
|
Huawei Technologies
|
Q9/15
|
2009-09-22 |
|
[ 712 ]
|
G.vector: Proposed way forward on the issue of FDM pilots
|
Huawei Technologies
,
MII
|
Q4/15
|
2009-09-20 |
|
[ 711 ]
|
G.vector: On Error Sample Quantization Format
|
Huawei Technologies
,
MII
|
Q4/15
|
2009-09-20 |
|
[ 710 ]
|
G.vector: Line Stability after a Disorderly Leaving Event
|
Huawei Technologies
,
MII
|
Q4/15
|
2009-09-20 |
|
[ 706 ]
|
Unicast Message Negotiation - Timing Diagram
|
Huawei Technologies
|
Q13/15
|
2009-09-20 |
|
[ 705 ]
|
Unicast Message Negotiation - Multiple TLVs
|
Huawei Technologies
|
Q13/15
|
2009-09-20 |
|
[ 704 ]
|
Discussion on clockIdentity format for ITU's IEEE1588 Telecom Profile
|
Huawei Technologies
|
Q13/15
|
2009-09-20 |
|
[ 703 ]
|
G.8264.1 - Editorial comments/changes
|
Huawei Technologies
|
Q13/15
|
2009-09-20 |
|
[ 702 ]
|
Description of Transparency in G.800
|
Huawei Technologies
|
Q12/15
|
2009-09-20 |
|
[ 701 ]
|
Proposal to define ATM, FR, PPP, HDLC, SDH over Ethernet mappings
|
Huawei Technologies
|
Q9/15, Q10/15
|
2009-09-20 |
|
[ 700 ]
|
Proposal on Ring Protection
|
Huawei Technologies
|
Q9/15
|
2009-09-20 |
|
[ 699 ]
|
Proposal on PTN Equipment Types
|
Huawei Technologies
|
Q9/15
|
2009-09-20 |
|
[ 698 ]
|
Proposal on MVC and EVC in G.ptneq
|
Huawei Technologies
|
Q9/15
|
2009-09-20 |
|
[ 697 ]
|
Extension of APS for Generic Dual Node Interconnection Protection
|
Huawei Technologies
|
Q9/15
|
2009-09-20 |
|
[ 696 ]
|
Supervisory system for optical fibre submarine cable systems
|
Huawei Technologies
|
Q8/15
|
2009-09-20 |
|
[ 695 ]
|
Introduce OTN interface into Optical Submarine Cable Systems
|
Huawei Technologies
,
China Unicom
|
Q8/15
|
2009-09-20 |
|
[ 694 ]
|
Definition of COTDR parameters
|
Huawei Technologies
|
Q8/15
|
2009-09-20 |
|
[ 693 ]
|
Proposal for 10G bitrate submarine optical signal
|
Huawei Technologies
|
Q8/15
|
2009-09-20 |
|
[ 692 ]
|
Proposal for OSNR parameter values at point RS for 10G/50GHz application codes in G.698.2
|
Huawei Technologies
|
Q6/15
|
2009-09-20 |
|
[ 691 ]
|
Proposal for new sub-clauses into G.696.1 about mixed 10G/40G/100G transmission
|
Huawei Technologies
|
Q6/15
|
2009-09-20 |
|
[ 690 ]
|
Proposal on the state machine and APS PDU in G.8031
|
Huawei Technologies
|
Q9/15
|
2009-09-20 |
|
[ 689 ]
|
Proposal on ACL-SNCG/I protection switching for microwave network in G.8031
|
Huawei Technologies
|
Q9/15
|
2009-09-20 |
|
[ 688 ]
|
Proposal on extending linear protection switching for variable link in G.808.1
|
Huawei Technologies
|
9/15
|
2009-09-20 |
|
[ 687 ]
|
QL to clockClass mapping
|
Huawei Technologies
,
France Telecom Orange
|
Q13/15
|
2009-09-20 |
|
[ 686 ]
|
Discussion of G.8264.1 Message Forwarding Behaviour
|
Huawei Technologies
|
Q13/15
|
2009-09-20 |
|
[ 685 ]
|
Packet Master Traffic Load Analysis based on ITU-T PTP profile message rates
|
Huawei Technologies
,
CATR
,
MII
|
Q13/15
|
2009-09-20 |
|
[ 684 ]
(Rev.1) |
Proposal on adding bandwidth notification function in G.808.1 and G.8031
|
Huawei Technologies
|
Q9/15
|
2009-09-20 |
|
[ 683 ]
|
G.800 Transport Entities
|
Huawei Technologies
|
Q12/15
|
2009-09-20 |
|
[ 572 ]
|
ODUflex hitless resizing method
|
Huawei Technologies
,
China Mobile Communications Corp
|
Q9/15, Q11/15
|
2009-09-18 |
|
[ 569 ]
|
Proposal of re-using equipment protection profile for supporting N:1 protection in G.984.4
|
Huawei Technologies
|
Q2/15
|
2009-09-18 |
|
[ 568 ]
|
Proposal for supporting related BM-CM RE and WC-enabled RE configuration in G.984.4
|
Huawei Technologies
|
Q2/15
|
2009-09-18 |
|
[ 533 ]
|
HO and LO ODUk Shared Ring Protection (SRP)
|
Huawei Technologies
,
China Academy of Telecommunication Research, MII
,
China Mobile Communications Corporation
|
Q9/15
|
2009-09-18 |
|
[ 505 ]
|
Initial Analysis of STM-1 Client Jitter and Wander Accumulation over OTN Islands
|
Huawei Technologies
|
Q13/15, Q11/15
|
2009-09-17 |
|
[ 504 ]
|
Initial Analysis of CPRI Client Jitter and Wander Accumulation over OTN islands
|
Huawei Technologies
|
Q13/15, Q11/15
|
2009-09-17 |
|
[ 502 ]
|
1 Gbit/s Ethernet Client Wander Accumulation in the Presence of Input Noise and Wide-band Jitter Accumulation, over OTN Islands
|
Huawei Technologies
|
Q13/15, Q11/15
|
2009-09-17 |
|
[ 501 ]
|
Initial Development of Ethernet and SDH Input Noise Models for OTN Transport Jitter and Wander Accumulation Analyses
|
Huawei Technologies
|
Q13/15, Q11/15
|
2009-09-17 |
|
[ 454 ]
|
Proposal to study Shared Mesh Protection
|
Huawei Technologies
,
CATR
,
MII
|
Q9/15
|
2009-09-16 |
|
[ 453 ]
|
Considerations on the description of the ODU layer network in G.872 and G.8080
|
Huawei Technologies
|
Q14/15, Q12/15
|
2009-09-16 |
|
[ 452 ]
|
Transfer delay for FC over OTN
|
Huawei Technologies
|
Q11/15
|
2009-09-16 |
|
[ 445 ]
|
Management of high capacity connections in the OTN
|
Huawei Technologies
|
Q12/15
|
2009-09-16 |
|
[ 443 ]
|
Text proposal to align clause 9/G.872 with draft revised G.709
|
Huawei Technologies
|
Q12/15
|
2009-09-16 |
|
[ 441 ]
|
GPON over OTN mapping
|
Huawei Technologies
,
China Mobile Communications Corporation
,
PMC-Sierra
|
Q2/15, Q11/15
|
2009-09-16 |
|
[ 440 ]
|
Proposal to extend G.798 with new features in draft revised G.709 and APS OH access
|
Huawei Technologies
|
Q9/15
|
2009-09-16 |
|
[ 439 ]
|
Text proposal for clause 8/G.798.1
|
Huawei Technologies
|
Q9/15
|
2009-09-16 |
|
[ 438 ]
|
Proposal to specify OCh/OTUkV_A with OTUk_CP
|
Huawei Technologies
|
Q9/15, Q11/15
|
2009-09-16 |
|
[ 437 ]
|
Multi-vendor demarcation in the OTN
|
Huawei Technologies
|
Q9/15, Q11/15
|
2009-09-16 |
|
[ 436 ]
|
LO and HO ODU view points and NNIs
|
Huawei Technologies
|
Q9/15, Q11/15
|
2009-09-16 |
|
[ 434 ]
|
First models of OTN equipment proposal
|
Huawei Technologies
|
Q9/15
|
2009-09-16 |
Resultats:48 documents
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):