Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2008-12-01 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2008-12-01) 

UIT-T SG15

Transport network structures

Période d'études 2009

Réunion  du 2008-12-01 au 2008-12-12

Lieu : Suisse [Genève]

Autres réunions : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15 

Resultats:17 documents
Contributions  [ Source: ZTE Corporation ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 299 ]  
 
Proposal on automatic discovery requirements in WDM network in G.7714.1     ZTE Corporation   Q14/15   2008-11-23
[ 298 ]  
 
Clarifications on Key Management in GPON System     ZTE Corporation   Q2/15   2008-11-23
[ 297 ]  
 
BMC and SSM in 1588v2 Telecom Profiles for time/phase sync     ZTE Corporation   Q13/15   2008-11-23
[ 296 ]  
 
Considerations about 1588v2 Telecom Profiles classification for time sync in G.8265     ZTE Corporation, CATR MII   Q13/15   2008-11-23
[ 295 ]  
(Rev.1) 
Proposal to consider node resource management in G.8080 for WSON     ZTE Corporation   Q12/15   2008-11-23
[ 294 ]  
 
Includes pending state to support flushing FDB in non_revertive mechanism (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 293 ]  
 
Flushing behaviour in interconnected ring protection (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 292 ]  
 
FDB Flush Problem in non_revertive operation     ZTE Corporation, China   Q9/15   2008-11-23
[ 291 ]  
 
Difference between sub-ring and single ring protection (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 290 ]  
 
Comparison between shared-link and sub-ring models (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 289 ]  
 
Text Proposals in Appendix I for G.696.1 on mixed 10G/40G transmission     ZTE Corporation   Q6/15   2008-11-23
[ 288 ]  
 
Proposals on optical attenuator parameters in G.671     ZTE Corporation, China   Q7/15   2008-11-23
[ 287 ]  
 
Proposal on PDL and PMD parameters in G.671     ZTE Corporation, China   Q7/15   2008-11-23
[ 286 ]  
 
Proposals to Add Coordination Between Source and Destination to section 6.2 of G.7713     ZTE Corporation   Q14/15   2008-11-23
[ 285 ]  
 
Comments to G.8152     ZTE Corporation   Q14/15   2008-11-23
[ 284 ]  
 
Comments to G.8052     ZTE Corporation   Q14/15   2008-11-23
[ 271 ]  
 
Restoration exercise     ZTE Corporation   Q14/15, Q12/15   2008-11-23
Resultats:17 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-6-5