Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2008-12-01 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2008-12-01) 

UIT-T SG15

Transport network structures

Période d'études 2009

Réunion  du 2008-12-01 au 2008-12-12

Lieu : Suisse [Genève]

Autres réunions : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15 

Resultats:20 documents
Contributions  [ AI/Question: Q2/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 336 ]  
 
G.984.4 Implementer's Guide     Huawei Technologies Co.,Ltd.   Q2/15   2008-11-26
[ 298 ]  
 
Clarifications on Key Management in GPON System     ZTE Corporation   Q2/15   2008-11-23
[ 254 ]  
 
Solution of fast GPON switching in long-reach PON scenario     Huawei technologies   Q2/15   2008-11-21
[ 253 ]  
 
Proposal to support phase synchronization in GPON system     Huawei technologies Co., LTD   Q2/15   2008-11-21
[ 252 ]  
 
Proposal to support ONT survival time attribute in G.984.4     Huawei technologies Co., LTD   Q2/15   2008-11-21
[ 251 ]  
 
Proposal on Continuous Mode of LR-PON     Huawei Technologies Co., Ltd. RAD Data communicati   Q2/15   2008-11-21
[ 225 ]  
 
Proposal of control plane protocol stack in G.984.1     MII China   Q2/15   2008-11-21
[ 173 ]  
 
On the need to distribute accurate phase/Time-of-Day over xPON networks     RAD Data Communications, Huawei   Q2/15, Q13/15   2008-11-21
[ 134 ]  
 
Solution of fast GPON switching in long-reach PON scenario     Huawei technologies   Q2/15   2008-11-20
[ 133 ]  
 
Proposal to support phase synchronization in GPON system     Huawei technologies Co., LTD   Q2/15   2008-11-20
[ 132 ]  
 
Proposal to support ONT survival time attribute in G.984.4     Huawei technologies Co., LTD   Q2/15   2008-11-20
[ 131 ]  
 
Proposal on Continuous Mode of LR-PON     Huawei Technologies Co., Ltd. RAD Data communication Ltd.   Q2/15   2008-11-20
[ 129 ]  
 
Proposal for PON splitter specifications in G.671 revision     NTT   Q7/15, Q2/15   2008-11-20
[ 77 ]  
 
Proposal for clarifying downstream priority queues     ADTRAN   Q2/15   2008-11-19
[ 68 ]  
 
Specifications proposal to G.gbe     NEC, Fujitsu, NTT   Q2/15   2008-11-19
[ 67 ]  
 
Liaison statement proposal on G.gbe     NEC, Fujitsu   Q2/15   2008-11-19
[ 66 ]  
 
Comments on the Software image download in G.984.4 Revised 2008-Am2     Hitachi   Q2/15   2008-11-19
[ 47 ]  
 
PON splitter values     Corning Incorporated   Q7/15, Q2/15   2008-11-18
[ 46 ]  
 
PON splitter values - Change to wavelength range     Corning Incorporated   Q7/15, Q2/15   2008-11-18
[ 19 ]  
 
Editorial Comments for Draft 1.0 for G.gbe     Nortel Networks (Canada)   Q2/15   2008-11-17
Resultats:20 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-6-20