Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 13 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 13  C 

UIT-T SG 13

Réseaux futurs, y compris les réseaux mobiles et les réseaux de prochaine génération

Période d'études 2009

Resultats:26 documents
Contributions  [ Source: ZTE Corporation ]  [ AI/Question: Q4/13 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 881 ]  
 
Proposal for correcting Abbreviations and acronyms in Y.2111     ZTE Corporation   Q4/13   2011-01-10
[ 879 ]  
 
Proposal for refining resource control scenarios for handover in Y.2111     ZTE Corporation   Q4/13   2011-01-10
[ 878 ]  
 
Proposal for refining wholesale definition in Y.2111     ZTE Corporation   Q4/13   2011-01-10
[ 877 ]  
 
Proposal for updating Summary in Y.2111     ZTE Corporation   Q4/13   2011-01-10
[ 876 ]  
 
Proposal for alignment for Ru interface defined in Y.2111 and Y.2014     ZTE Corporation   Q5/13, Q4/13   2011-01-10
[ 594 ]  
 
Proposal for resource retrieval in RACF     ZTE Corporation   Q4/13   2010-04-13
[ 593 ]  
 
Proposal for resource control scenarios for roaming     ZTE Corporation   Q4/13   2010-04-13
[ 587 ]  
 
Proposal for interaction between RACF and PCC     ZTE Corporation   Q4/13   2010-04-13
[ 586 ]  
 
Proposal for CPN control in wholesale mode     ZTE Corporation   Q4/13   2010-04-13
[ 585 ]  
 
Proposal for mandatory requirements of Revision 2 in RACF     ZTE Corporation   Q4/13   2010-04-13
[ 582 ]  
 
Proposal for MMCF description in RACF     ZTE Corporation   Q4/13   2010-04-13
[ 577 ]  
 
Proposal for authorization free indication in RACF     ZTE Corporation   Q4/13   2010-04-13
[ 361 ]  
 
Proposal for the Ri interface in Y.2111     ZTE Corporation   Q4/13   2009-08-26
[ 337 ]  
 
Proposed to modify bandwidth attribute over Rp reference point     ZTE Corporation   Q4/13   2009-08-26
[ 331 ]  
 
Proposal for the interaction between RACF and PCC in Y.2111     ZTE Corporation , China Telecom   Q4/13   2009-08-26
[ 324 ]  
 
Proposal for the SCF-requested QoS initial authorization procedure for nomadicity scenario     ZTE Corporation   Q4/13   2009-08-25
[ 323 ]  
 
Proposal for resource control scenarios for wholesale in Y.2111     ZTE Corporation   Q4/13   2009-08-25
[ 319 ]  
 
Proposal for a RACF based charging scenario in Y.2111     ZTE Corporation, China Telecom   Q4/13   2009-08-25
[ 312 ]  
 
Editorial modification for appendix V in Y.2111     ZTE Corporation   Q4/13   2009-08-25
[ 311 ]  
 
Correction for the Ri interface in Y.2111     ZTE Corporation   Q4/13   2009-08-25
[ 310 ]  
 
Clarification for section 9.1.2.1.1 in Y.2111     ZTE Corporation   Q4/13   2009-08-25
[ 164 ]  
 
The editorial modification for the Y.racf     ZTE Corporation   Q4/13   2009-01-07
[ 154 ]  
 
Proposed to add the wholesale scenario in Y.RACF     ZTE Corporation   Q4/13   2009-01-07
[ 153 ]  
 
Proposed to add the nomadicity scenario in Y.RACF     ZTE Corporation   Q4/13   2009-01-07
[ 152 ]  
 
Proposed to add the CPN control for the wholesale scenario in Y.RACF     ZTE Corporation   Q4/13   2009-01-07
[ 151 ]  
 
Proposed to add an information component in Rh reference point     China Telecom, ZTE Corporation   Q4/13   2009-01-07
Resultats:26 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-6-17