Contributions
[ Source: Huawei Technologies ]  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 535 ]
|
Proposal on state transition tables for T-MPLS linear protection switching
|
ETRI,
,
Huawei Technologies
|
Q9/15
|
2007-05-25 |
|
[ 471 ]
|
VS Technical Clarification
|
Huawei Technologies Co., Ltd
,
China Telecom Co., Ltd
|
Q12/15
|
2007-05-24 |
|
[ 470 ]
|
Trigger events for auditing process
|
Huawei Technologies Co., Ltd
|
Q14/15
|
2007-05-24 |
|
[ 469 ]
|
1+1/1:1 protection switching mechanism for RMPS
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 468 ]
|
Requirement of partial protection switching for RMPS
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 467 ]
|
Proposal for an over-clocked OTN structure (supplement) recommendation
|
Huawei Technologies Co., Ltd
|
Q11/15
|
2007-05-24 |
|
[ 464 ]
|
Proposal on OAM Model for T-MPLS SPRing
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 463 ]
|
Proposal for Application Code and Parameter Values in G.dapp2
|
MII
,
China Telecom, China United Telecom
,
China Mobile
,
ZTE Corporation
,
P.R. China Huawei Technologies Co., Ltd
|
Q6/15
|
2007-05-24 |
|
[ 462 ]
|
Proposal for FC over T-MPLS
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 461 ]
|
Considerations in Sync Ethernet over OTN
|
Huawei Technologies Co., Ltd
|
Q13/15, Q11/15, Q9/15
|
2007-05-24 |
|
[ 460 ]
|
Consideration about the time requirement
|
Huawei Technologies Co., Ltd
|
Q13/15
|
2007-05-24 |
|
[ 459 ]
|
Connections between ring nodes on T-MPLS ring
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 458 ]
|
Proposals on a flexible multiplexing/mapping scheme
|
Huawei Technologies Co., Ltd
|
Q11/15
|
2007-05-24 |
|
[ 457 ]
|
Considerations on the evolution of OTN
|
Huawei Technologies Co., Ltd
|
Q11/15
|
2007-05-24 |
|
[ 456 ]
|
G.VDSL: Further information for the SOS proposal
|
Ministry of Information Industry of the P.R. China
,
Huawei Technologies Co., Ltd.
|
Q4/15
|
2007-05-24 |
|
[ 455 ]
|
G.vdsl: More Results on Performance of a Physical-Layer Retransmission Scheme
|
Huawei Technologies Co., Ltd.
,
Ministry of Information Industry of the P.R. China
|
Q4/15
|
2007-05-24 |
|
[ 453 ]
|
G.vdsl: Proposal for New Recommendation on FEXT Cancellation for use with VDSL2 Transceivers
|
Huawei Technologies Co., Ltd
|
Q4/15
|
2007-05-24 |
|
[ 452 ]
|
G.vdsl: More Information about Bivariate Histogram for Impulse Noise Monitor
|
Huawei Technologies Co., Ltd, P.R. China
|
Q4/15
|
2007-05-24 |
|
[ 451 ]
|
OMCI for 802.1ad QoS support
|
Huawei Technologies (Ltd), China
|
Q2/15
|
2007-05-24 |
|
[ 272 ]
|
Proposed text for Draft Amendment 1 to Recommendation G.8110.1
|
Alcatel
,
Huawei Technologies
|
Q12/15
|
2006-10-20 |
|
[ 267 ]
|
Proposals for draft Recommendation G.8131 (Protection switching for Transport MPLS (T-MPLS) networks)
|
Huawei Technologies
,
Alcatel
,
Tellabs Oy
|
Q9/15
|
2006-10-20 |
|
[ 152 ]
|
Power Load Management M.E.
|
Huawei Technologies
|
Q2/15
|
2006-10-19 |
|
[ 151 ]
|
Path Degradation in Packet Transport Network
|
Huawei Technologies
|
Q9/15, Q12/15
|
2006-10-19 |
|
[ 150 ]
|
Proposal for G.984.4 modelling of SDH over GEM
|
Huawei Technologies
|
Q2/15
|
2006-10-19 |
|
[ 149 ]
|
VDSL2: Key issues to emergency rate reduction(SOS)
|
MII China
,
Huawei Technologies
|
Q4/15
|
2006-10-19 |
|
[ 148 ]
|
VS Tunnel Multiplexing and Services Discussion
|
Huawei Technologies
,
Siemens AG
,
China Telecom
|
Q12/15
|
2006-10-19 |
|
[ 147 ]
|
Proposed text for G.7716 draft
|
Huawei Technologies
|
Q14/15
|
2006-10-19 |
|
[ 146 ]
|
Proposal for TCM in G.8110.1
|
Huawei Technologies
|
Q12/15
|
2006-10-19 |
|
[ 145 ]
|
Propose to add RPR/TM adaptation function
|
Huawei Technologies
|
Q12/15
|
2006-10-19 |
|
[ 144 ]
|
Shared Bandwidth Rate Control
|
Huawei Technologies
|
Q12/15, Q9/15
|
2006-10-19 |
|
[ 143 ]
|
Proposal for FC over T-MPLS
|
Huawei Technologies
|
Q12/15
|
2006-10-19 |
|
[ 142 ]
|
Proposal for E-Tree service in G.8011
|
Huawei Technologies
|
Q11/15
|
2006-10-19 |
|
[ 141 ]
|
Proposed Functional Requirements for Automatic Synchronization Distribution
|
Huawei Technologies
|
Q13/15
|
2006-10-19 |
|
[ 140 ]
|
Proposal for TCM in G.798
|
Huawei Technologies
|
Q11/15, Q9/15
|
2006-10-19 |
|
[ 139 ]
|
Corrigendum to G.7043/Y.1343
|
Huawei Technologies
|
Q11/15
|
2006-10-19 |
|
[ 138 ]
|
Proposals for application code and Physical layer parameters and values for G.dapp2 applications
|
Huawei Technologies
|
Q6/15
|
2006-10-19 |
|
[ 137 ]
|
Proposal for TCM in G.709
|
Huawei Technologies
|
Q9/15, Q11/15
|
2006-10-19 |
|
[ 136 ]
|
Proposal for sequencing TCM levels in G.798
|
Huawei Technologies
|
Q11/15, Q9/15
|
2006-10-19 |
|
[ 135 ]
|
Comments on draft G.dapp2 version 0.31
|
Huawei Technologies
|
Q6/15
|
2006-10-19 |
|
[ 134 ]
|
Clarification to questions raised to WD23 at Ottawa Q13/15 Meeting that was held June 19 - 23, 2006 in Ottawa, Canada
|
Huawei Technologies
|
Q13/15
|
2006-10-19 |
|
[ 133 ]
|
Automatic Sync Distribution Technique
|
Huawei Technologies
|
Q13/15
|
2006-10-19 |
|
[ 132 ]
|
VDSL2: Work Items on In-Domain FEXT Cancellation
|
MII China
,
Huawei Technologies
|
Q4/15
|
2006-10-19 |
Resultats:42 documents
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):