Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C 

UIT-T SG15

Infrastructures des réseaux optiques et autres réseaux de transport

Période d'études 2005

Resultats:913 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 263 ]  
 
G.hn: On the home network topology     Infineon Technologies   Q4/15   2006-10-20
[ 262 ]  
 
G.VDSL2: Correction to the formula for computing received virtual noise from TXREFVN parameter     Infineon Technologies   Q4/15   2006-10-20
[ 261 ]  
 
Proposal of a generic Home Network architecture on the transport stratum     NTT   Q1/15   2006-10-20
[ 260 ]  
 
Channel/senders/receivers complex model     Alcatel   Q12/15   2006-10-20
[ 259 ]  
 
Unifying G.805 and G.809     Lucent Technologies UK , KPN   Q12/15   2006-10-20
[ 258 ]  
 
Discussion on macrobending loss specification for G.mmx     Draka Comteq   Q5/15, Q10/15   2006-10-20
[ 257 ]  
 
G.vdsl: VDSL2 Impulse Noise Monitor Performance/Accuracy Requirements     Alcatel Bell   Q4/15   2006-10-20
[ 256 ]  
 
G.gen: G.vdsl: G.ploam: Full Proposed Text for VDSL2 Impulse Noise Monitor     Alcatel Bell   Q4/15   2006-10-20
[ 255 ]  
 
G.vdsl: VDSL2 Initialization Success/Failure Code DRAFT     Alcatel Bell   Q4/15   2006-10-20
[ 254 ]  
 
G.gen: G.vdsl: G.ploam: VDSL2 Reporting of Actual Impulse Noise Protection     Alcatel Bell   Q4/15   2006-10-20
[ 253 ]  
 
Clock bandwidth considerations for G.paclock     Israel MOC   Q13/15   2006-10-20
[ 252 ]  
 
Text changes for Appendix VIII of Recommendation G.8261     Israel MOC   Q13/15   2006-10-20
[ 251 ]  
 
Appendix VI/Test Case 8: Can G.8261 masks be met     Israel MOC   Q13/15   2006-10-20
[ 250 ]  
 
Clarifications and text changes for Appendix VI of G.8621     Israel MOC   Q13/15   2006-10-20
[ 249 ]  
 
WDM interface with a total capacity of 100 Gbit/s     Deutsche Telekom   Q6/15   2006-10-20
[ 248 ]  
 
Synchronisation Modelling Components - Time     BT   Q13/15   2006-10-20
[ 247 ]  
 
Synchronous Ethernet Equipment Clock - Selection Function     BT   Q13/15   2006-10-20
[ 246 ]  
 
Synchronisation Modelling - Frequency and Time Converging     BT   Q13/15   2006-10-20
[ 245 ]  
 
Synchronous Ethernet - Synchronisation Status Message (SSM) Delay Analysis     BT   Q13/15   2006-10-20
[ 244 ]  
 
Ethernet Ring Protection     Siemens   Q9/15   2006-10-20
[ 243 ]  
 
Proposal to continue work on 10GbE bit rates     Cisco Systems   Q14/15, Q12/15, Q11/15   2006-10-20
[ 242 ]  
 
Impact of T-MPLS on a carrier operations group     Cisco Systems   Q14/15, Q12/15, Q11/15, Q9/15   2006-10-20
[ 241 ]  
 
Two customer needs of 10GbE LAN PHY transport: one can be fulfilled by using existing standards and the other needs new standards     Japan   Q11/15   2006-10-20
[ 240 ]  
 
Engagement of ITU-T SG15 with IEEE 802.3 Higher Speed Study Group (802.3 HSSG) in consideration of current 802.3 HSSG efforts to define objectives for Higher Speed Ethernet     AT&T , Sprint Nextel , Verizon   Q12/15, Q11/15, Q9/15, Q6/15   2006-10-20
[ 239 ]  
 
Proposal of wavelength-selective-switch-based photonic cross-connect for transparent optical network systems in G.otf     NTT   Q6/15   2006-10-20
[ 238 ]  
 
Proposals for Definitions and Appendix to support revision of G.666 (ex G.PMDC)     Alcatel   Q7/15   2006-10-20
[ 237 ]  
 
Proposal to discuss on OSNR sensitivity data at applications for narrow spectral excursion at new G.dapp2     Alcatel   Q6/15   2006-10-20
[ 236 ]  
 
Proposals for application code with wide spectral excursion at G.dapp2     Alcatel   Q6/15   2006-10-20
[ 235 ]  
 
Ethernet protection and physical constraints     BT   Q9/15   2006-10-20
[ 234 ]  
(Rev.1) 
All-Japan interoperability trial of full-transparent 10GbE LAN PHY transport  
Rev1: Correction of a template issue causing the seventh contact not to appear
 
Japan   Q11/15   2006-10-20
[ 233 ]  
 
Proposal for T-MPLS MIP Identification     Alcatel   Q12/15, Q9/15   2006-10-20
[ 232 ]  
 
100 Gbit/s interface     Alcatel   Q11/15, Q9/15   2006-10-20
[ 231 ]  
 
Multi-layer T-MPLS network architecture and layer network signal formats     Alcatel   Q12/15, Q11/15   2006-10-20
[ 230 ]  
 
Comments on and proposals for G.650.2     Deutsche Telekom   Q5/15   2006-10-20
[ 229 ]  
 
Definitions in G.666     Deutsche Telekom   Q7/15   2006-10-20
[ 228 ]  
 
Work Load of Q12/15 - Proposal for advanced working methods     Alcatel   Q12/15   2006-10-20
[ 227 ]  
 
Protocol extension for automatic discovery in OTN networks     ETRI   Q14/15   2006-10-20
[ 226 ]  
 
Time distribution in synchronization networks     Nortel Networks (USA)   Q13/15   2006-10-20
[ 225 ]  
 
SSM behaviour for packet networks     Nortel Networks (USA)   Q13/15   2006-10-20
[ 224 ]  
 
Network limits for 1544 kbit/s interface description in G.8261     USA   Q13/15   2006-10-20
[ 223 ]  
 
Additional Information on Virtual Synchronous Ethernet Method     Adtran   Q13/15   2006-10-20
[ 222 ]  
 
SBS measurement: Proposal for text in G.650.2, Appendix II.5     Corning Incorporated   Q5/15   2006-10-20
[ 221 ]  
 
Relationship of bend radius to reliability     Corning Incorporated   Q10/15   2006-10-20
[ 220 ]  
 
G.VDSL2: Proposal on INM functionality for G.993.2 Amendment 1     Ikanos Communications , Conexant Systems   Q4/15   2006-10-20
[ 219 ]  
 
Supporting Time synchronization (time-of-day) across a transmission network     Tellabs Oy   Q13/15   2006-10-20
[ 218 ]  
 
Proposed mechanisms of Loop Free Ethernet Rings Protection     NTT   Q9/15   2006-10-20
[ 217 ]  
 
The influence of loops on frame forwarding     NTT   Q9/15   2006-10-20
[ 216 ]  
 
Comparison of Y.1731with IEEE802.1ag     NTT   Q9/15   2006-10-20
[ 215 ]  
 
Proposal for Initial Draft of Ethernet Rings Protection     NTT   Q9/15   2006-10-20
[ 214 ]  
 
Proposal of operation scenarios for VCAT and LCAS management in ASON     NTT   Q12/15   2006-10-20
Resultats:913 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2006-09-28