Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2008-02-11 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2008-02-11) 

UIT-T SG15

Infrastructures des réseaux optiques et autres réseaux de transport

Période d'études 2005

Réunion  du 2008-02-11 au 2008-02-22

Lieu : Suisse [Genève]

Autres réunions : 2008-12-01  2007-06-04  2006-10-30  2006-02-06  2005-05-16  2004-11-29 

Resultats:24 documents
Contributions  [ AI/Question: Q12/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 913 ]  
 
Some concerns about and proposals for the future direction of ASON     NTT   Q14/15, Q12/15   2008-02-06
[ 908 ]  
 
Layer model of Ethernet     Deutsche Telekom   Q12/15   2008-02-03
[ 856 ]  
 
Change Proposal for G.7712 re the T-MPLS Management Communication Channel     Alcatel-Lucent   Q12/15, Q14/15   2008-02-01
[ 843 ]  
 
Requirement of MS-PW over T-MPLS     CMCC , Alcatel Shangai Bell , CU , CATR MII China   Q12/15, Q11/15, Q9/15   2008-02-01
[ 830 ]  
 
G.pacmod-bis: Test results of the new timing distribution mechanism     Huawei   Q14/15, Q13/15, Q12/15   2008-02-01
[ 828 ]  
 
Requirements for Network Automatic Configuration     Huawei   Q14/15, Q12/15   2008-01-31
[ 826 ]  
 
Corrections to FD/FDFr Usage in G.8010     Huawei   Q12/15   2008-01-31
[ 823 ]  
 
PBB Model for G.8010     Huawei   Q12/15   2008-01-31
[ 822 ]  
 
G.800 Term for Interconnect Transport Entities     Huawei   Q12/15   2008-01-31
[ 821 ]  
 
G.800 description modification     Huawei   Q12/15   2008-01-31
[ 815 ]  
 
Annex of G.8010v2 to describe the PVT network application     Huawei , Nokia Siemens Networks   Q12/15   2008-01-31
[ 797 ]  
 
Consideration on IP/MPLS and T-MPLS interworking     Fujitsu   Q12/15   2008-01-31
[ 788 ]  
 
Complexity, Scalability, Independency, and Transparency     BT   Q12/15   2008-01-31
[ 782 ]  
 
Proposed study items for packet based transport technologies for the next study period (2009-2012)     NTT   QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15   2008-01-31
[ 738 ]  
 
Combination of protection and restoration in G.8080     ZTE   Q12/15   2008-01-30
[ 734 ]  
 
Clarification for FP partitioning in G.8010     ZTE   Q12/15   2008-01-30
[ 730 ]  
 
Proposal for adding definition of control component topology in ASON     ZTE   Q12/15   2008-01-30
[ 713 ]  
 
VLAN model in G.8010     BT, Nortel Networks (Europe)   Q12/15   2008-01-30
[ 712 ]  
 
PBB model for G.8010     BT, Nortel Networks (Europe)   Q12/15   2008-01-30
[ 711 ]  
 
Approach to modelling in G.pbb-te     BT, Nortel Networks (Europe)   Q12/15   2008-01-30
[ 677 ]  
 
Proposed liaison response for PCE     Nortel Networks (Canada)   Q14/15, Q12/15   2008-01-29
[ 654 ]  
 
DCN Architecture and Gateways     Ciena Corp   Q14/15, Q12/15   2008-01-29
[ 653 ]  
 
Problems with G.8010     Ciena Corp   Q14/15, Q12/15, Q9/15   2008-01-29
[ 651 ]  
 
The future of G.7716     Ciena Corp, Nortel Networks (USA)   Q12/15   2008-01-29
Resultats:24 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-6-20