Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG13 : Réunion 2006-07-17 : Contributions Tardives  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG13  D (2006-07-17) 

UIT-T SG13

Réseaux de prochaine génération

Période d'études 2005

Réunion  du 2006-07-17 au 2006-07-28

Lieu : Suisse [Genève]

Autres réunions : 2009-09-01  2009-01-12  2008-09-12  2008-05-22  2008-01-14  2007-09-21  2007-04-16  2006-11-03  [ 2006-07-17 ]  2006-01-16  2005-08-29  2005-04-25  2004-12-07 

Resultats:42 documents
Contributions Tardives  [ AI/Question: Q4/13 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 853 ]  
 
Proposed Text for Introduction and Scope sections in Y.mpm     ETRI   Q4/13   2006-07-10
[ 850 ]  
 
Proposed a New Definition of a Functional Component in Y.FRA     ETRI   Q4/13, Q3/13   2006-07-10
[ 822 ]  
 
Proposed Editorial Changes for Section 1 of Y.RACF     Editors   Q4/13   2006-07-07
[ 821 ]  
 
Proposed Texts for Summary of Y.RACF     Editors   Q4/13   2006-07-07
[ 817 ]  
 
Difference and convergence of RACF and RACS FEs and Interfaces     China Telecom   Q4/13   2006-07-07
[ 811 ]  
 
ETS VoIP Requirements for the RACF Function     AT&T   Q4/13   2006-07-07
[ 806 ]  
 
An implementation of the TRC-FE in an MPLS Network     Lucent Technologies   Q4/13   2006-07-07
[ 805 ]  
 
Proposed Functional Architecture in Y.mpm     ETRI   Q4/13   2006-07-07
[ 804 ]  
 
Proposed modification and reallocation of the section 7.2 in Y.mpm     ETRI   Q4/13   2006-07-07
[ 803 ]  
 
Proposed Performance Management Overall Architecture in Y.mpm     ETRI   Q4/13   2006-07-07
[ 802 ]  
 
Proposed Rearrangement of "Annex A: Passive Measurement" in Y.mpm     ETRI   Q4/13   2006-07-07
[ 790 ]  
 
Analysis of Mapping to ITU-T RACF to TISPAN RACS and 3GPP PCC/3GPP2     Lucent Technologies   Q4/13   2006-07-07
[ 789 ]  
 
Proposed Texts for Policy Rules in Y.RACF     Lucent Technologies   Q11/13, Q4/13   2006-07-07
[ 774 ]  
 
Proposal for approval of Y.RACF with editorial amendments     NTT Corporation   Q4/13   2006-07-07
[ 758 ]  
 
Considerations for IPv6 signaling to support RACF in NGN environments     ETRI   Q4/13, Q9/13   2006-07-06
[ 747 ]  
 
Y.RACF Rw Reference Point modifications     France Telecom   Q4/13   2006-07-06
[ 746 ]  
 
Y.RACF editorial modifications     France Telecom   Q4/13   2006-07-06
[ 745 ]  
 
Comments on clause 5.8 of Y.NGN-R1-Reqts (NGN Release 1 requirements)     France Telecom   Q4/13, Q2/13   2006-07-06
[ 742 ]  
 
Comments on Y.RACF document     Oki Electric Industry Co., Ltd.   Q4/13   2006-07-06
[ 731 ]  
 
Considerations on framework for performance measurements and settlement in NGN from the view point of harmonization with G.FEPO document in SG12     Korea (Republic of)   Q4/13   2006-07-06
[ 730 ]  
 
Considerations on framework for performance measurements and settlement in NGN     Korea (Republic of)   Q4/13   2006-07-06
[ 725 ]  
 
A revised text for TR-enet     Korea (Republic of)   Q4/13   2006-07-06
[ 720 ]  
 
Architectural Framework of Resource Management for non-RACF-Supported System in NGN     Korea (Republic of)   Q4/13   2006-07-06
[ 719 ]  
 
Resource Management of Non-RACF-supported System in NGN: Additional Requirement for SNMP     Korea (Republic of)   Q4/13   2006-07-06
[ 707 ]  
 
Propose to initiate Static Resource Admission Control at Heterogeneous Transport Environment     Korea (Rep. of)   Q4/13   2006-07-06
[ 699 ]  
 
Contribution to TR-enet for VPN service     ETRI   Q4/13   2006-07-06
[ 681 ]  
 
Editorial comments for Y.RACF     ETRI   Q4/13   2006-07-06
[ 680 ]  
 
Clarification of the behaviour of path-coupled signalling in push mode in Y.RACF     ETRI   Q4/13   2006-07-06
[ 623 ]  
 
Proposed changes to section 8 of Y.mpm     Huawei Technologies   Q4/13   2006-07-05
[ 622 ]  
 
Proposed modification of section 7.2 of Y.mpm     Huawei Technologies   Q4/13   2006-07-05
[ 609 ]  
(Rev.1) 
Proposed detailed description of reference point Rn in Y.123.qos     Huawei Technologies   Q4/13   2006-07-05
[ 608 ]  
 
Proposed detailed description of reference point Rc in Y.123.qos     Huawei Technologies   Q4/13   2006-07-05
[ 607 ]  
 
Proposed changes for Y.123.qos     Huawei Technologies Co. Ltd   Q4/13   2006-07-07
[ 604 ]  
 
Suggestions on Y.e1eqos.1     ZTE Corporation   Q4/13   2006-07-04
[ 599 ]  
 
Multicast consideration in Y.racf     ZTE Corporation   Q4/13   2006-07-04
[ 586 ]  
 
Proposed authorisation and authentication text for Y.flowreq     BT   Q4/13   2006-07-04
[ 585 ]  
 
Additional proposed changes to the baseline text of Y.flowreq     BT   Q4/13   2006-07-04
[ 584 ]  
 
Y.flowreq baseline text     BT   Q4/13   2006-07-04
[ 583 ]  
 
A QoS notification scheme for end-to-end service session quality control     KDDI Corporation   Q4/13, Q3/13   2006-07-04
[ 581 ]  
 
Proposal for initiation of a study of the quality control scheme for service sessions based on Session/Border Control (S/BC) functions     KDDI Corporation   Q4/13, Q3/13   2006-07-04
[ 575 ]  
 
Appendix 1 for Y.flowreq     Anagran Inc.   Q4/13   2006-07-04
[ 574 ]  
 
Section 6.3 for Y.flowreq     Anagran Inc.   Q4/13   2006-07-04
Resultats:42 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-4-27