Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 145 ]
|
Proposal of Peer-to-Peer Approach for Distributed Content Distribution
|
Huawei Technologies Co., Ltd.
|
Q7/11, Q3/13, Q3/11, Q2/13, Q1/11, IPTV-GSI
|
2008-01-11 |
|
[ 144 ]
|
Proposal on IGMP Filter in DOC-0190
|
China Telecom
|
Q3/13, Q2/13, Q2/11, Q1/11, IPTV-GSI
|
2008-01-11 |
|
[ 143 ]
|
Add interactions with other services to the draft of Q.CRBT_CRT
|
ZTE Corporation
|
2/11, 3/11
|
2008-01-09 |
|
[ 142 ]
|
Add IMS signalling requirement for CRT to the draft of Q.CRBT_CRT
|
ZTE Corporation
|
2/11, 3/11
|
2008-01-09 |
|
[ 141 ]
|
Add IMS signalling requirement for CRBT to the draft of Q.CRBT_CRT
|
ZTE Corporation
|
2/11, 3/11
|
2008-01-09 |
|
[ 140 ]
|
Add of References to the draft of Q.CRBT_CRT
|
ZTE Corporation
|
2/11, 3/11
|
2008-01-09 |
|
[ 139 ]
|
Add interaction between CDIVN and OIR/TIR
|
ZTE Corporation
|
3/11
|
2008-01-09 |
|
[ 138 ]
|
Add service/signalling flows for CRBT/CRT to the draft of Q.CRBT_CRT
|
ZTE Corporation
|
2/11, 3/11
|
2008-01-09 |
|
[ 137 ]
|
Modifications to the draft of Q.ECT
|
ZTE Corporation
|
3/11
|
2008-01-09 |
|
[ 136 ]
|
SIP-ISDN and SIP-SIP Network Integration Tests
|
Telekom Austria TA
|
8/11
|
2008-01-08 |
|
[ 135 ]
|
Q.1912.5 Conformance tests
|
Telecom Austria TA
|
8/11
|
2008-01-08 |
|
[ 134 ]
|
Additional call flows for Q.UNI profile
|
ETRI
|
3/11
|
2008-01-08 |
|
[ 133 ]
|
Call flows for Q.3401 Amendment A
|
ETRI
|
3/11
|
2008-01-08 |
|
[ 132 ]
|
Extensions for early media in Q.UNI profile
|
ETRI
|
3/11
|
2008-01-08 |
|
[ 131 ]
|
Extensions for early media in Q.3401 Amendment A
|
ETRI
|
3/11
|
2008-01-08 |
|
[ 130 ]
|
Proposed ToR extension for Q.7/11 in the next study period (2009 - 2012)
|
ETRI
|
7/11
|
2008-01-08 |
|
[ 129 ]
|
Appropriate range of ANM response time at inter-operator ISUP
|
ETRI
|
3/11
|
2008-01-08 |
|
[ 128 ]
|
Analysis about the difference of NACF R1 and R2
|
ETRI
|
7/11
|
2008-01-08 |
|
[ 127 ]
|
Proposal for SG11 work scope for the next study period
|
Korea (Republic of)
|
ALL/11
|
2008-01-08 |
|
[ 126 ]
|
Proposal for expanded scope to Q.2/11
|
Korea (Republic of)
|
2/11
|
2008-01-08 |
|
[ 125 ]
|
Revised texts of Draft Recommendation Q.nacp.S-TC1
|
Korea (Republic of)
|
7/11
|
2008-01-08 |
|
[ 124 ]
|
Proposal for adding new text of Q.NGN-trx.profile
|
Korea (Republic of)
|
7/11
|
2008-01-08 |
|
[ 123 ]
|
Draft Recommendation Q.nacf.auth1 "Authentication Protocols based on EAP-AKA for Interworking among 3GPP, WiMax, and WLAN in NGN"
|
Korea (Republic of)
|
7/11
|
2008-01-08 |
|
[ 122 ]
|
Proposal on the updated texts in draft Q.nacp.S-TC1
|
KT
|
7/11
|
2008-01-08 |
|
[ 121 ]
|
Proposed texts on service model for Q.CRBT_CRT
|
KT
|
2/11, 3/11
|
2008-01-08 |
|
[ 120 ]
|
Proposed texts on service description and architecture for Q.CRBT_CRT
|
KT
|
2/11, 3/11
|
2008-01-08 |
|
[ 119 ]
|
Proposed updates to TRQ.rsf
|
MII, People?s Republic of China, Huawei Technologies Co., Ltd.
|
5/11
|
2008-01-08 |
|
[ 118 ]
|
Proposed texts to Rt interface
|
MII, People's Republic of China
|
5/11
|
2008-01-08 |
|
[ 117 ]
|
Proposed texts on clause 9.3 of Rs interface
|
MII, People's Republic of China
|
5/11
|
2008-01-08 |
|
[ 116 ]
|
Propose to consent Draft Recommendation Q.NGN-trx.profile at January 2008
SG 11 Meeting
|
China Telecom
|
7/11
|
2008-01-08 |
|
[ 115 ]
|
Proposal to revise Q.2/11
|
Huawei Technologies Co,. Ltd.
|
2/11
|
2008-01-08 |
|
[ 114 ]
|
Propose for CRT service flow in IMS (download)
|
Huawei Technologies Co.,Ltd.
|
2/11, 3/11
|
2008-01-08 |
|
[ 113 ]
|
Propose for CRT service flow in IMS
|
Huawei Technologies Co.,Ltd.
|
2/11, 3/11
|
2008-01-08 |
|
[ 112 ]
|
Propose for CRBT service flow in IMS
|
Huawei Technologies Co.,Ltd.
|
2/11, 3/11
|
2008-01-08 |
|
[ 111 ]
|
Proposed texts to Q.NACF.mob0
|
Huawei Technologies Co., Ltd.
|
7/11
|
2008-01-08 |
|
[ 110 ]
|
Draft of Q.3306.1 (Q.rcp6) update
|
Telekomunikacja Polska (Poland)
|
5/11
|
2008-01-08 |
|
[ 109 ]
|
Proposed additions for handbook clauses
|
Telekomunikacja Polska (Poland)
|
6/11
|
2008-01-08 |
|
[ 108 ]
|
Proposals of new questions under study for 2009-2012 Study Period from Q.8/11 responsibilities
|
Telecommunication Administration of the Russian Federation
|
8/11
|
2008-01-08 |
|
[ 107 ]
|
Inexpediency of association of the SG11, SG13 and SG19
|
Telecommunication Administration of the Russian Federation
|
8/11
|
2008-01-08 |
|
[ 106 ]
|
Call to develop a Signalling Recommendation supporting Flow State Aware Resource Control
|
Anagran Inc.
|
5/11
|
2008-01-07 |
|
[ 105 ]
|
Considerations regarding security requirements associated with draft Recommendation Q.3304.1
|
Nortel Networks (Canada)
|
5/11
|
2008-01-07 |
|
[ 104 ]
|
Consideration of the configuration and scope of Rh reference point
|
ETRI
|
5/11
|
2008-01-07 |
|
[ 103 ]
|
Additional text to Q.3308 (Rh reference point)
|
ETRI
|
5/11
|
2008-01-07 |
|
[ 102 ]
|
The consideration of the baseline protocol for the Rh reference point
|
ETRI
|
5/11
|
2008-01-07 |
|
[ 101 ]
|
Proposed texts to Rh interface
|
China Telecom, Huawei Technologies Co., Ltd.
|
5/11, 4/13
|
2008-01-07 |
|
[ 100 ]
|
Signaling requirement for Mobility and Handover Control Function
|
ETRI
|
1/11
|
2008-01-07 |
|
[ 99 ]
|
Proposed updates to Ri interface
|
China Telecom, Huawei Technologies
|
5/11
|
2008-01-07 |
|
[ 98 ]
|
Proposed work item on use of pre-congestion notification (PCN) for resource control
|
Huawei Technologies, BT
|
5/11
|
2008-01-07 |
|
[ 97 ]
|
Proposal of creating a draft Rec. for Admission Control Coordination
|
British Telecom, Huawei Technologies Co., Ltd.
|
5/11
|
2008-01-07 |
|
[ 96 ]
|
Proposed revised text of Q.4/11 description
|
NTT Comware Corporation
|
4/11
|
2008-01-07 |
Resultats:61 documents Résultats :
1 -
2
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):