Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : NGN GSI : Réunion 2008-05-12 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T NGN GSI  C (2008-05-12) 

UIT-T NGN GSI

Initiative "Normes mondiales sur les réseaux NGN"

Période d'études 2005

Réunion  du 2008-05-12 au 2008-05-23

Lieu : Suisse [Genève]

Autres réunions : 2008-09-01  2008-01-14  2007-09-11  2007-04-16  2007-01-08  2006-10-24  2006-07-17  2006-04-22  2006-01-16 

Resultats:23 documents
Contributions  [ AI/Question: Q2/11 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1043 ]  
 
Text for Sections 6.4 and 7.4 of Q.CRBT_CRT draft     ETRI   Q3/11, Q2/11   2008-05-04
[ 1018 ]  
 
Comments on" The Signalling Requirements and Protocol Profile for CRBT and CRT services"     China Telecom   Q2/11   2008-05-04
[ 969 ]  
 
Some editorial changes to unclear requirements     Huawei Technologies Co.,Ltd   Q3/11, Q2/11   2008-05-04
[ 968 ]  
 
Editorial changes to interaction with other services     Huawei Technologies Co.,Ltd   Q3/11, Q2/11   2008-05-04
[ 967 ]  
 
Priority of CRBT service     Huawei Technologies Co.,Ltd   Q3/11, Q2/11   2008-05-04
[ 966 ]  
 
Calling party and called party CRBT/CRT     Huawei Technologies Co.,Ltd   Q3/11, Q2/11   2008-05-04
[ 965 ]  
 
Proposed to update the CRT service flows in IMS for Q.CRBT_CRT     Huawei Technologies Co., LTD   Q3/11, Q2/11   2008-05-04
[ 964 ]  
 
Proposed to update the CRBT service flows in IMS for Q.CRBT_CRT     Huawei Technologies Co., Ltd.   Q3/11, Q2/11   2008-05-04
[ 948 ]  
 
Propose for CRBT service flow in call Server Domain in Q.CRBT_CRT     Huawei Technologies Co.,Ltd.   Q2/11   2008-05-04
[ 947 ]  
 
Propose for CRBT service flow in Section 6.5 of Q.CRBT_CRT(2)     Huawei Technologies Co.,Ltd.   Q3/11, Q2/11   2008-05-04
[ 946 ]  
 
Propose for CRBT service flow in Section 6.5 of Q.CRBT_CRT(1)     Huawei Technologies Co.,Ltd.   Q3/11, Q2/11   2008-05-05
[ 898 ]  
 
Signalling requirement for UE on Gateway Model CRT to the draft of Q.CRBT_CRT     ZTE Corporation   Q2/11   2008-05-04
[ 897 ]  
 
Signalling requirement for UE on Gateway Model CRBT to the draft of Q.CRBT_CRT     ZTE Corporation   Q2/11   2008-05-04
[ 896 ]  
 
Signalling requirement for AS on Gateway Model CRT to the draft of Q.CRBT_CRT     ZTE Corporation   Q2/11   2008-05-04
[ 895 ]  
 
Signalling requirement for AS on Gateway Model CRBT to the draft of Q.CRBT_CRT     ZTE Corporation   Q2/11   2008-05-04
[ 894 ]  
 
Service flows for gateway model CRT to the draft of Q.CRBT_CRT     ZTE Corporation   Q2/11   2008-05-04
[ 893 ]  
 
Service flows for gateway model CRBT to the draft of Q.CRBT_CRT     ZTE Corporation   Q2/11   2008-05-04
[ 890 ]  
 
CRBT service interaction with other networks to the draft of Q.CRBT_CRT     ZTE Corporation, Huawei Technologies Co.,Ltd.   Q2/11   2008-05-04
[ 858 ]  
 
Proposed Signalling flows for CRT service in Annex C of Q.CRBT_CRT     KT   Q3/11, Q2/11   2008-05-04
[ 857 ]  
 
Proposed Signalling flows for CRBT service in Annex C of Q.CRBT_CRT     KT   Q3/11, Q2/11   2008-05-04
[ 856 ]  
 
Proposed texts for Section 7.4 in CRT service     KT   Q3/11, Q2/11   2008-05-04
[ 855 ]  
 
Proposed texts for Section 6.4 in CRBT service     KT   Q3/11, Q2/11   2008-05-04
[ 854 ]  
 
Proposed Section 6.2.3 CRBT service flows on HTTP model     KT   Q3/11, Q2/11   2008-05-04
Resultats:23 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2025-10-11