Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG13 : Réunion 2003-07-21 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG13  TD-PLEN (2003-07-21) 

UIT-T SG13

GT 2/13 (Architecture et principes de l?intégration des réseaux) et GT 3/13(Réseaux et mécanismes multiprotocoles)

Période d'études 2001

Réunion  du 2003-07-21 au 2003-08-01

Lieu : Suisse [Genève]

Autres réunions : 2004-10-01  2004-06-22  2004-02-03  [ 2003-07-21 ]  2002-10-29  2002-07-08  2002-01-22  2001-05-14  2000-11-20 

Resultats:21 documents
Documents Temporaires  (PLEN)  [ AI/Question: QALL/13 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 53-PLEN ]  
 
TSB Director's 2003 Informal Forum Summit -Output and list of participants     TSB   QALL/13   2003-07-31
[ 50-PLEN ]  
 
Proposal to include NGN Recommendations in the Y-series     Chairman, SG 13   QALL/13   2003-07-31
[ 49-PLEN ]  
 
List of Participants     TSB   QALL/13   2003-07-31
[ 48-PLEN ]  
(Rev.1) 
Liaison statment to TSAG on Study Group restructuring and on NGN issues     ITU-T SG 13   QALL/13   2003-07-31
[ 47-PLEN ]  
 
Draft main meeting repot (draft COM 13-R 35)     Chairman, SG 13   QALL/13   2003-07-31
[ 46-PLEN ]  
 
Proposals for the establishment of a JRG on NGN     SG 13 management team   QALL/13   2003-07-31
[ 16-PLEN ]  
 
Views on ITU-T Study Groups restructuring (BT, Nortel Networks and Alcatel) (for information)     TSB   QALL/13   2003-07-20
[ 15-PLEN ]  
 
Initial allocation of documents     TSB   QALL/13   2003-07-20
[ 13-PLEN ]  
 
List of normal and delayed contributions     TSB   QALL/13   2003-07-18
[ 12-PLEN ]  
(Rev.1) 
Summary results of actions taken at the 8 November 2002 SG 13 meeting and from interim Rapporteur meetings     TSB   QALL/13   2003-07-17
[ 11-PLEN ]  
 
Consequences of NGN workshop for SG 13 work plan     Vice-Chair   Futures, QALL/13   2003-07-17
[ 10-PLEN ]  
 
Answer to liaison statement from SG 13 on security aspects of Recommendations of SG 13     ITU-T SG 17   Q10/17, QALL/13   2003-06-24
[ 9-PLEN ]  
 
Liaison statement on optical transport networks & technologies standardization work plan, issue 3     ITU-T SG 15   QALL/13, QALL/15   2003-06-24
[ 8-PLEN ]  
 
Reply to TSAG on restructuring of Study Groups (LS02-TSAG)     ITU-T SG 9   QALL/13, QALL/9   2003-06-24
[ 7-PLEN ]  
 
Liaison statement on SG 4 report and request in its role as lead Study Group on TMN     ITU-T SG 4   QALL/13   2003-06-24
[ 6-PLEN ]  
 
Liaison statement on correspondence group on "Time-E"     TSAG   QALL/13   2003-06-24
[ 5-PLEN ]  
 
Liaison statement on regional balance to ITU-T meetings     TSAG   QALL/13   2003-06-24
[ 4-PLEN ]  
 
Liaison statement on use of mandatory terms such as "shall" and "must" in ITU-T Recommendations     TSAG   QALL/13   2003-06-24
[ 3-PLEN ]  
 
Liaison statement on procedures for Study Group Questions     TSAG   QALL/13   2003-06-24
[ 2-PLEN ]  
 
Liaison statement from TSAG on ToR and action plan for the "ITU-T SGs Restructuring" Group     TSAG   QALL/13   2003-06-24
[ 1-PLEN ]  
 
Liaison statement from TSAG on Security     TSAG   QALL/13   2003-06-24
Resultats:21 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2025-7-25