Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG11 : Réunion 2003-09-01 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG11  TD-WP2 (2003-09-01) 

UIT-T SG11

Spécifications et protocoles de signalisation

Période d'études 2001

Réunion  du 2003-09-01 au 2003-09-12

Lieu : Suisse [Genève]

Autres réunions : 2004-03-01  [ 2003-09-01 ]  2002-11-11  2002-02-18  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Resultats:27 documents
Documents Temporaires  (WP2)  [ AI/Question: 9/11 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 33-WP2 ]  
 
Draft Liaison generated in SWP 2-4/11 discussions     WP2/11 Chairman   Q7/11, Q8/11, Q9/11   2003-09-10
[ 31-WP2 ]  
 
Proposed Liaison Response to ITU-T SG2 (Q.6/2) on E.412     WP2/11 Vice Chairman (D. Knight)   Q9/11   2003-09-08
[ 30-WP2 ]  
(Rev.1) 
Technical Report TRQ.2000: Roadmap for the TRQ.2xxx-series technical reports     WP2/11 Vice Chairman (D. Knight)   Q6/11, Q7/11, Q8/11, Q9/11   2003-09-08
[ 29-WP2 ]  
 
Draft TRQ.2800 (editing output)     Editor (B. Pfeil)   Q9/11   2003-09-08
[ 28-WP2 ]  
 
Draft TRQ.NCAPX     Editor   Q9/11   2003-09-08
[ 27-WP2 ]  
 
Draft TRQ.2415     Editor (L. Graf)   Q9/11   2003-09-04
[ 26-WP2 ]  
 
Draft TRQ.2402     Editor (L. Graf)   Q9/11   2003-09-04
[ 25-WP2 ]  
 
Agenda of joint Qs 7, 8 & 9/11 (IP QoS) meeting (SWP 2-4)     Q7/11 Rapporteur (K. Kenyoshi)   Q7/11, Q8/11, Q9/11   2003-09-02
[ 23-WP2 ]  
(Rev.1) 
Q9/11 meeting agenda, document allocation and schedule     Rapporteur (L. Graf)   Q9/11   2003-09-01
[ 21-WP2 ]  
 
WP 2/11 Work Programme (Input)     WP2/11 Vice-Chairman (D. Knight)   Q6/11, Q7/11, Q8/11, Q9/11   2003-08-29
[ 20-WP2 ]  
(Rev.1-2) 
Agenda of Q.6/11 and joint Q.6/11 and Q.9/11 meeting     Q6/11 Rapporteur (K. Mainwaring)   Q6/11, Q9/11   2003-08-29
[ 19-WP2 ]  
(Rev.1-2) 
Technical Report TRQ.NSIP Signalling Requirements for carrying narrowband service signalling information within IP-Based Signalling Systems to support interworking of services     Editor (T. Fu)   Q6/11, Q9/11   2003-08-27
[ 18-WP2 ]  
 
Draft TRQ.IPC.CS1     Editor (L. Graf)   Q9/11   2003-08-21
[ 17-WP2 ]  
 
Draft TRQ.AAL2.CS3     Editor (L. Graf)   Q9/11   2003-08-21
[ 16-WP2 ]  
 
Draft TRQ.AAL2IP.iw (Editor's input)     Editor (B. Pfeil)   Q9/11   2003-08-18
[ 14-WP2 ]  
 
Liaison Statement - Reply to SG11 for comments and questions on Y.qosar     SG13 (GVA. 21 July - 1 Aug. 2003)   Q16/13, Q8/11, Q9/11   2003-08-08
[ 13-WP2 ]  
 
Liaison Statement - Information on the Scope of Y.1541     SG13 (GVA. 21 July - 1 Aug. 2003)   Q6/13, Q8/11, Q9/11   2003-08-08
[ 12-WP2 ]  
(Rev.1) 
BICC CS3 Overall Requirements (Editors Input)     Editor TRQ.BICC.CS3 (D. Knight)   Q9/11   2003-08-11
[ 11-WP2 ]  
 
TRQ.IPBCP.CS2: Requirements for Capability Set 2 of the IP Bearer Control Protocol (Editors Input)     Editor TRQ.IPBCP.CS2 (D. Knight)   Q9/11   2003-08-11
[ 10-WP2 ]  
 
Discussion Summary of QoS Matters in April 10, 2003 meeting     WP2/11 Chairmperson (G. Ratta)   Q7/11, Q8/11, Q9/11   2003-08-07
[ 9-WP2 ]  
(Rev.1-2) 
Draft Technical Report TRQ.IPQoS.Sig.CS1 - Signalling Requirements for IP-QOS     Editor pro tem   Q7/11, Q8/11, Q9/11   2003-08-07
[ 8-WP2 ]  
 
Signalling Requirements for IP-QOS     WP2/11 Chairman (G. Ratta)   Q7/11, Q8/11, Q9/11   2003-08-07
[ 7-WP2 ]  
 
Discussion Summary of Joint Qs 6 & 9/11, Meeting on Arpil 7, 2003     WP2/11 Chairman (G. Ratta)   Q6/11, Q9/11   2003-08-07
[ 6-WP2 ]  
 
Liaison Statement - Response to Progress of the discussion on generic end-to-end QoS service requirements     SG16 Rapprt. mtg. (11-14 Feb. 2003)   Q8/11, Q9/11, QF/16   2003-03-03
[ 5-WP2 ]  
 
Liaison Statement - Response on Signalling Requirements for IP-QOS     SG16 Rapprt. mtg (11-14 Feb. 2003)   Q8/11, Q9/11, QF/16   2003-03-03
[ 3-WP2 ]  
 
Liaison Statement - Optical Transport Netwroks & Technologies Standardization Work Plan, Issue 3     SG15 (GVA. 20-31 January 2003)   Q9/11, QALL/15   2003-02-04
[ 1-WP2 ]  
 
Agenda - WP2/11 Plenary Sessions     WP2/11 Chairperson (G. Ratta)   Q6/11, Q7/11, Q8/11, Q9/11   2003-08-29
Resultats:27 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2025-7-30