Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG11 : Réunion 2002-11-11 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG11  TD-WP2 (2002-11-11) 

UIT-T SG11

Spécifications et protocoles de signalisation

Période d'études 2001

Réunion  du 2002-11-11 au 2002-11-22

Lieu : Suisse [Genève]

Autres réunions : 2004-03-01  2003-09-01  [ 2002-11-11 ]  2002-02-18  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Resultats:22 documents
Documents Temporaires  (WP2)  [ AI/Question: 9/11 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 44-WP2 ]  
 
Report of the Q8/11 and joint Q 8 & 9/11 meetings     Rapporteur (R. Schumacher)   Q8/11, Q9/11   2002-11-20
[ 42-WP2 ]  
(Rev.1) 
Liaison Statements Generated by Questions in WP2/11     WP2/11 Vice Chairman (D. Knight)   Q6/11, Q7/11, Q8/11, Q9/11   2002-11-20
[ 41-WP2 ]  
 
Report of joint Qs6/11 and 9/11 and joint Qs 6/11 and 7/11 discussions     Q6/11 Rapporteur (K. Mainwaring)   Q6/11, Q7/11, Q9/11   2002-11-19
[ 39-WP2 ]  
(Rev.1) 
Report of the Question 9/11 Meeting     Temporary Rapporteur (D. Knight)   Q9/11   2002-11-20
[ 36-WP2 ]  
 
Technical Report TRQ.NSIP Signalling Requirements for Carrying Narrowband Service Signalling Information within IP-Based Signalling Systems to Support Interworking of Services     Editor (T. Fu)   Q6/11, Q9/11   2002-11-14
[ 35-WP2 ]  
 
Agenda for the Question 9/11 Meeting     Temporary Rapporteur (D. Knight)   Q9/11   2002-11-12
[ 32-WP2 ]  
(Rev.1) 
Agenda of Q6/11 and joint Qs 6 & 9/11     Q.6/11 Rapporteur (K.Mainwaring)   Q6/11, Q9/11   2002-11-12
[ 23-WP2 ]  
 
Liaison Statement to SGs 11, 2 & 16 - Draft Recommendation Y.1530 (November 2002)     SG13 (GVA 29 Oct - 8 Nov 2002)   Q5/2, Q6/11, Q6/2, Q7/11, Q8/11, Q9/11, Q9/13, QF/16   2002-11-08
[ 21-WP2 ]  
(Rev.1) 
TRQ.IPBCP.CS2: Requirements for Capability Set 2 of the IP Bearer Control Protocol (Input)     Editor (D. Knight)   Q9/11   2002-11-19
[ 20-WP2 ]  
 
Report of the Newbury Interim Joint Q.6/11 & 9/11 Meeting (17-21 June 2002)     Rapporteur Q6/11 (K. Mainwaring)   Q6/11, Q9/11   2002-11-05
[ 19-WP2 ]  
 
Draft Signalling Requirements for AAL Type 2 to IP Interworking (TRQ.AAL2IP.iw), Editor's Input     Editor (B. Pfeil)   Q9/11   2002-10-30
[ 18-WP2 ]  
 
Agreed Ottawa output of Draft Signalling Requirements for AAL Type 2 to IP Interworking (TRQ.AAL2IP.iw)     Editor (B. Pfeil)   Q9/11   2002-10-30
[ 16-WP2 ]  
 
Draft Technical Report TRQ.IPC.CS1 (Signalling Requirements for IP Connection Control in Radio Access Networks Capability Set 1)     Editor (L. Graf)   Q9/11   2002-10-18
[ 15-WP2 ]  
 
Draft Technical Report TRQ.AAL2.CS3 (Signalling Requirements for AAL Type 2 Signalling Capability Set 3)     Editor (L. Graf)   Q9/11   2002-10-18
[ 14-WP2 ]  
 
Liaison Statement to SGs 2,11,12, &13 - Comments on Draft Recommendation E.QSC     QF Rapprtr. meeting (Bruges 24-28.06.02)   Q8/11, Q9/11, QF/16   2002-07-19
[ 13-WP2 ]  
 
Liaison Statement to SGs 11,12 & 13 - Comments on generic end-to-end QoS service requirements     Q.F Rapprt meeting, Bruges (24-28.6.02)   Q8/11, Q9/11, QF/16   2002-07-19
[ 12-WP2 ]  
 
Liaison reply to SG 13 and SG 11 concerning joint activity on generic requirements for end-to-end QoS including the appropriate protocol mechanism for service control and signalling     SG9 (GVA 3-7 JUNE 2002)   Q13/9, Q8/11, Q9/11   2002-06-27
[ 11-WP2 ]  
 
Liaison Statement - Comments on liaison on generic end-to-end QoS service requirements     SG12 (GVA 27-31 MAY 2002)   Q13/12, Q8/11, Q9/11   2002-06-03
[ 10-WP2 ]  
 
Liaison Statement to ITU-T SGs 2,9,11,12,13,15,16 & 17 and ITU-R WP9A - Consent on Draft New Recommendation M.2301 (ex-M-23ip)     SG 4 (GVA 8-19 APR. 2002)   6/11, 8/11, 9/11   2002-10-28
[ 9-WP2 ]  
(Rev.2) 
Liaison Statement to SGs 11,12,13,16 & SSG - Response to SG 11 on proposed joint activity on a generic protocol mechanism for end-to-end QoS service control and signalling protocol development based on IP transfer capabilities and IP QoS classes     SG9 (GVA 3-7 DEC. 2002)   Q10/9, Q13/9, Q8/11, Q9/11   2002-04-09
[ 7-WP2 ]  
 
Liaison Statement to ITU-T SGs 4, 6, 9, 11, 13, 16, 17 & ITU-R SGs 4, 8 &9 - New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan     SG15 (GVA 29.04.02 -10.05.02)   Q9/11, QALL/15   2002-05-17
[ 1-WP2 ]  
 
Proposed Opening WP2/11 Plenary Agenda     WP2/11 Chairperson (G. Ratta)   Q6/11, Q7/11, Q8/11, Q9/11   2002-11-07
Resultats:22 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2025-7-29