Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1537 ]
|
Regulatory measures for protection of IMT BS from DC-MSS-IMT
|
Orange
,
Telefon AB - LM Ericsson
|
AI1.13
|
2026-09-16 |
|
[ 1536 ]
|
Appropriate regulatory measure for protection of IMT base station from DC-MSS-IMT systems
|
France
|
|
2026-09-16 |
|
[ 1535 ]
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 7 125-8 400 MHz - Downlink of earth exploration satellite service and of fixed satellite service
|
France
|
AI1.7
|
2026-09-16 |
|
[ 1534 ]
|
Compatibility study between IMT in the frequency band 4 400-4 800 MHz and aeronautical radionavigation service operating in the frequency band 4 200-4 400 MHz
|
France
|
|
2026-09-16 |
|
[ 1533 ]
|
Elements of a working document towards preliminary draft CPM text for WRC-27 agenda item 1.7
|
France
|
AI1.7
|
2026-09-16 |
|
[ 1532 ]
|
Proposed modifications to summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 4 400-4 800 MHz
|
France
|
AI1.7
|
2026-09-16 |
|
[ 1531 ]
|
Proposed modifications to summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 4 400-4 800 MHz
|
France
|
AI1.7
|
2026-09-16 |
|
[ 1530 ]
|
Calculation and simulation of pfd limits for the protection of IMT terrestrial networks against interferences from DC-MSS-IMT satellites stations
|
Orange
|
|
2026-09-16 |
|
[ 1529 ]
|
Updates to WRC-27 agenda item 1.7 summary of studies in the band 4 400-4 800 MHz
|
Nokia Corporation
,
Qualcomm, Inc.
,
Telefon AB - LM Ericsson
|
AI1.7
|
2026-09-16 |
|
[ 1528 ]
|
Protection of terrestrial IMT BS
|
Botswana
,
Mozambique
,
Namibia
,
South Africa
|
|
2026-09-16 |
|
[ 1527 ]
|
Pfd limits for protection of terrestrial IMT UE
|
Botswana
,
Mozambique
,
Namibia
,
South Africa
|
|
2026-09-16 |
|
[ 1526 ]
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 7 125-8 400 MHz - Earth exploration satellite service
|
France
,
Germany
,
Italy
,
Luxembourg
,
Norway
,
Spain
,
Turkiye
|
AI1.7
|
2026-09-16 |
|
[ 1525 ]
|
Update of study p in the working document on WRC-27 agenda item 1.13
|
Telefon AB - LM Ericsson
|
AI1.13
|
2026-09-16 |
|
[ 1524 ]
|
Proposed modifications to Attachment 8 (MetSat vs IMT at 7 GHz)
|
European Organisation for the Exploitation of Meteorological Satellite
,
European Space Agency (ESA)
|
AI1.7
|
2026-09-16 |
|
[ 1523 ]
|
Working document on studies for the regulatory considerations to protect terrestrial IMT systems under WRC-27 agenda item 1.13
|
Tonga
|
AI1.13
|
2026-09-16 |
|
[ 1522 ]
|
Considerations to protect terrestrial IMT systems under WRC-27 agenda item 1.13
|
IAFI
|
AI1.13
|
2026-09-16 |
|
[ 1521 ]
|
Analysis of parameter assumptions across FSS/MSS (Earth-to-space) sharing studies for WRC-27 agenda item 1.7
|
IAFI
|
AI1.7
|
2026-09-16 |
|
[ 1520 ]
|
Proposed modifications to Recommendation ITU-R M.1036-8 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations
|
IAFI
|
|
2026-09-16 |
|
[ 1519 ]
|
Updates to WRC-27 agenda item 1.7 summary of studies in the frequency band 7 125-8 400 MHz
|
Nokia Corporation
,
Qualcomm, Inc.
,
Telefon AB - LM Ericsson
|
AI1.7
|
2026-09-16 |
|
[ 1518 ]
|
Views of the communications administration of Uzbekistan on the working document towards a preliminary draft CPM text on WRC-27 agenda item 1.7
|
Ministry of Digital Technologies of the Republic of Uzbekistan
|
AI1.7
|
2026-09-16 |
|
[ 1517 ]
|
Further updates to the working document towards a preliminary draft new Report ITU-R M.[IMT.ATG] - For non-safety air-ground communications (excluding UAS) using terrestrial IMT and other land mobile technologies
|
IAFI
,
Wireless World Research Forum
|
|
2026-09-16 |
|
[ 1516 ]
|
Text proposal for the working document towards a preliminary draft revision of Document IMT-2030/2 "Process"
|
Indian Institute of Technology Madras
|
|
2026-09-16 |
|
[ 1515 ]
|
Working document towards a preliminary draft new Report ITU-R M.[IMT-FWA] - [Technical and operational aspects of providing broadband by fixed wireless access using IMT technology (IMT-FWA) in the frequency bands identified for IMT]
|
Telecommunications Standards Development Society, India (TSDSI)
|
|
2026-09-16 |
|
[ 1514 ]
|
Text proposal for the preliminary draft new Report ITU-R M.[IMT-2030.SUBMISSION] - Requirements, evaluation criteria and submission templates for the development of IMT-2030
|
Telecommunications Standards Development Society, India (TSDSI)
|
|
2026-09-16 |
|
[ 1513 ]
|
Working document towards a preliminary draft revision of document IMT-2030/2 "Process" - Submission, evaluation process and consensus building for IMT-2030
|
Telecommunications Standards Development Society, India (TSDSI)
|
|
2026-09-16 |
|
[ 1512 ]
|
Preliminary draft revision of Report ITU-R M.2480-1 - National approaches of some countries on the implementation of terrestrial IMT systems in bands identified for IMT
|
United States
|
|
2026-09-16 |
|
[ 1511 ]
|
Proposed edits for elements for future liaison statement from Working Party 5D to Working Party 4C on WRC-27 agenda item 1.13
|
United States
|
AI1.13
|
2026-09-16 |
|
[ 1510 ]
|
Information document on compatibility of IMT in the frequency band 4 400-4 800 MHz with aeronautical mobile telemetry in the band 4 400-4 940 MHz for WRC-27 agenda item 1.7
|
United States
|
AI1.7
|
2026-09-16 |
|
[ 1509 ]
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 14.8-15.35 GHz
|
United States
|
AI1.7
|
2026-09-16 |
|
[ 1508 ]
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 7 125-8 400 MHz
|
United States
|
AI1.7
|
2026-09-16 |
|
[ 1507 ]
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 4 400-4 800 MHz
|
United States
|
AI1.7
|
2026-09-16 |
|
[ 1506 ]
|
Draft CPM text for WRC-27 agenda item 1.7
|
United States
|
AI1.7
|
2026-09-16 |
|
[ 1505 ]
|
Sharing study between the FSS (Earth-to-space) systems and IMT in the frequency band 7 900-8 400 MHz
|
Germany
|
AI1.7
|
2026-09-16 |
|
[ 1504 ]
|
Sharing study between the EESS (Earth-to-space) systems and IMT in the frequency band 7 190-7 250 MHz
|
Germany
|
AI1.7
|
2026-09-16 |
|
[ 1503 ]
|
Proposed modifications to elements of a working document towards preliminary draft CPM text for WRC-27 agenda item 1.7
|
Saudi Arabia
|
AI1.7
|
2026-09-16 |
|
[ 1502 ]
|
Proposed modifications to the summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 7 125-8 400 MHz
|
Saudi Arabia
|
AI1.7
|
2026-09-16 |
|
[ 1501 ]
|
Considerations on the polarisation loss and the reference bandwidth in the development of regulatory limits for the protection of terrestrial IMT networks from DC-MSS-IMT
|
Nokia Corporation
,
Telefon AB - LM Ericsson
|
|
2026-09-16 |
|
[ 1500 ]
|
Pfd levels required for protection of FWA CPE from DC-MSS-IMT
|
Telia Company AB
|
|
2026-09-16 |
|
[ 1499 ]
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 7 125-8 400 MHz - Earth exploration satellite service
|
Germany
|
AI1.7
|
2026-09-16 |
|
[ 1498 ]
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 7 125-8 400 MHz - Scientific services below 7 250 MHz
|
Germany
|
AI1.7
|
2026-09-16 |
|
[ 1497 ]
|
Summary of the RAS compatibility studies under WRC-27 agenda item 1.7 for the frequency band 14.8-15.35 GHz
|
Germany
|
AI1.7
|
2026-09-16 |
|
[ 1496 ]
|
Sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 4 400-4 800 MHz: addition of RAS
|
Germany
|
AI1.7
|
2026-09-16 |
|
[ 1495 ]
|
Update on activities in Region 3
|
Region 3 Rapporteur
|
|
2026-09-16 |
|
[ 1494 ]
|
Sub-Working Group WRC-27 agenda item 1.7 - Elements of a working document towards preliminary draft CPM text for WRC-27 agenda item 1.7
|
Iran (Islamic Republic of)
|
AI1.7
|
2026-09-16 |
|
[ 1493 ]
|
Text proposal for the preliminary draft new Report ITU-R M.[IMT-2030.SUBMISSION] - Requirements, evaluation criteria and submission templates for the development of IMT-2030
|
India
|
|
2026-09-16 |
|
[ 1492 ]
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 7 125-8 400 MHz - Fixed service
|
France
,
Germany
|
AI1.7
|
2026-09-16 |
|
[ 1491 ]
|
Proposed modifications to the text of Sections 4 and 5 of the draft CPM text for WRC-27 agenda item 1.7
|
Japan
|
AI1.7
|
2026-09-16 |
|
[ 1490 ]
|
Proposal of draft liaison statement from Working Party 5D to Working Party 4C on agenda item 1.13
|
Japan
|
AI1.13
|
2026-09-16 |
|
[ 1489 ]
|
Proposal to IMT-2030 development process
|
Japan
|
|
2026-09-16 |
|
[ 1488 ]
|
Proposals to a preliminary draft new Report ITU-R M.[IMT-2030.SUBMISSION]
|
Japan
|
|
2026-09-16 |
Resultats:1537 documents Résultats :
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):