|
Format |
Taille |
Mise à disposition |
|
|
|
| English |
Word
|
28102584 octets |
2026-06-22 |
[106] Annex 4- Preliminary draft revision of Report ITU-R SM.2405-1 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing
cognitive capabilities
|
| |
Word
|
5487752 octets |
2026-06-22 |
[106] Annex 3- Preliminary draft revision of Report ITU-R SM.2404-0 - Regulatory tools to support enhanced shared use of the spectrum |
| |
Word
|
1241477 octets |
2026-06-22 |
[106] Annex 2- Preliminary draft revision of Report ITU-R SM.2353-0 - Challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands |
| |
Word
|
1132145 octets |
2026-06-22 |
[106] Annex 1- Preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and
Wall-Penetrating Radar (GPR/WPR) imaging systems
|
| |
Word
|
38411 octets |
2026-06-23 |
[106] Part 2
|
| |
Word
|
154724 octets |
2026-06-23 |
[106] Part 1
|
| |
Word
|
309638 octets |
2026-06-23 |
[106] - Report of the fourth 2023-2027 meeting of Working Party 1B (Geneva, 3-9 June 2026) |
|
|