Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP-6A : Contributions : 358 Ajoutés récemment -  Recherche de documents de réunion
   
[358]  Report of the meeting of Working Party 6A (Geneva, 20-28 September 2022)

Format

Taille

Mise à disposition

English

Word  

39833 octets 2022-10-31 [358] Chapter 5- Meeting Report from Sub-Working Group 6A-5 (Others) (Geneva, 20-28 September 2022)

Word  

21135076 octets 2022-10-07 [358] Chapter 5 - Annex 14- Preliminary draft revision of Report ITU-R BT.2344 - Information on technical parameters, operational characteristics and deployment scenarios of SAB/SAP as utilized in broadcasting

Word  

40817 octets 2022-10-06 [358] Chapter 5 - Annex 15- Revised terms of Reference of the Working Party 6A Rapporeur Group on SAB/SAP Issues

Word  

53514 octets 2022-10-31 [358] Chapter 4- Report from Sub-Working Group 6A-4 (Protection)

Word  

8315321 octets 2022-10-12 [358] Chapter 4 - Annex 12- Preliminary draft revision of Recommendation ITU-R BS.1698-0 - Evaluating fields from terrestrial broadcasting transmitting systems operating in any frequency band for assessing exposure to non ionizing radiation

Word  

38578 octets 2022-10-06 [358] Chapter 4 - Annex 13- Revised Terms of Reference of Working Party 6A Correspondence Group on CISPR Radio Services Database and its work plan

Word  

60623 octets 2022-10-31 [358] Chapter 3- Meeting Report from Sub-Working Group 6A-3 (WRC agenda items and sharing)

Word  

1599460 octets 2022-10-06 [358] Chapter 3 - Annex 8- Working document towards a preliminary draft revision of Report ITU-R BT.2383-4 - Typical frequency sharing characteristics for digital terrestrial television broadcasting systems in the frequency band 470-862 MHz

Word  

41887 octets 2022-10-06 [358] Chapter 3 - Annex 9- Progress Report - Revision of Report ITU-R BT.2383

Word  

35847 octets 2022-10-06 [358] Chapter 3 - Annex 10- Continuation of Rapporteur Group to undertake WRC-23 related studies called for by CPM23-1

Word  

39777 octets 2022-10-06 [358] Chapter 3 - Annex 11- Terms of Reference of the Rapporteur Group on WRC-23 agenda item 1.5 and Working Party 6A work plan on WRC-23 agenda item 1.5

Word  

41288 octets 2022-10-31 [358] Chapter 2- Meeting Report from Sub-Working Group 6A-2 (Sound and Multimedia)

Word  

49693 octets 2022-10-31 [358] Chapter 1- Meeting Report from Sub-Working Group 6A-1 (Television) (Geneva, 20-28 September 2022)

Word  

38716 octets 2022-10-06 [358] Chapter 1 - Annex 1- Preliminary draft revision of Recommendation ITU-R BT.2036-4 - Characteristics of a reference receiving system for frequency planning of digital terrestrial television systems

Word  

3291021 octets 2022-10-06 [358] Chapter 1 - Annex 2- Preliminary draft revision of Report ITU-R BT.2140-13 - Transition from analogue to digital terrestrial broadcasting

Word  

3806576 octets 2022-10-06 [358] Chapter 1 - Annex 3- Preliminary draft revision of Report ITU-R BT.2386-3 - Digital terrestrial broadcasting: Design and implementation of single frequency networks (SFN)

Word  

51173 octets 2022-10-06 [358] Chapter 1 - Annex 4- Preliminary draft revision of Report ITU-R BT.2485-1 - Advanced network planning and transmission methods for enhancements of digital terrestrial television broadcasting

Word  

10996109 octets 2022-10-06 [358] Chapter 1 - Annex 5- Working document towards a preliminary draft new Report ITU-R BT.[TRIALS-NEW-TMMB] - Collection of field trials of Terrestrial Multimedia Mobile Broadcasting systems

Word  

29234015 octets 2022-10-06 [358] Chapter 1 - Annex 6- Preliminary draft revision of Report ITU-R BT.2343-7 - Collection of field trials of UHDTV over DTT networks

Word  

348552 octets 2022-10-06 [358] Chapter 1 - Annex 7- Working document towards a preliminary draft new Report ITU-R BT.[ITCN] - Inter-tower communications network (ITCN) for terrestrial broadcasting and datacasting systems

Word  

114148 octets 2022-11-01 [358] - Chairman's Report of the meeting of Working Party 6A (Geneva, 20-28 September 2022)
 

Document :

UIT-R WP-6A  Contribution  358

Titre :

Report of the meeting of Working Party 6A (Geneva, 20-28 September 2022)

Reçu le :

2022-09-29

Source :

Chairman, WP 6A

Disponibilité :

Réservé aux utilisateurs TIES [UIT-R]

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2022-12-12