Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP1B.AR : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP1B.AR  C 

UIT-R WP1B.AR

Méthodologies de la Gestion du Spectre et Stratégies Economiques

Resultats:14 documents
Contributions  [ Source: Korea (Republic of) ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 56 ]  
 
Proposed draft liaison statement to CCT - UWB Abbreviation and Definition in the ITU-R recommendations and reports     Korea (Republic of)     2024-10-22
[ 55 ]  
 
Proposed draft new ITU-R Question - Guidance on the use of radio spectrum for new radio systems in the presence of incumbents     Korea (Republic of)     2024-10-22
[ 54 ]  
 
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)     2024-10-22
[ 53 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     Korea (Republic of)     2024-10-22
[ 39 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)     2023-05-19
[ 38 ]  
 
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     Korea (Republic of)     2023-05-19
[ 25 ]  
 
Proposed working document towards a preliminary draft new Report ITU-R [SPECTRUM MANAGEMENT FRAMEWORK FOR THE INTRODUCTION OF GPR/WPR] - Spectrum management framework for the introduction of Ground- and Wall- Penetrating Radar (GPR/WPR) imaging systems     Korea (Republic of)     2022-06-20
[ 24 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)   Q241/1   2022-06-20
[ 18 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)   Q241/1   2021-10-26
[ 17 ]  
 
Proposed revision of Report ITU-R SM.2015-1 - Methods for determining national long-term strategies for spectrum utilization     Korea (Republic of)     2021-10-26
[ 12 ]  
 
Proposed working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)   Q241/1   2021-05-14
[ 6 ]  
 
Proposed revision of Report ITU-R SM.2153-7 [UPDATING SRD RELATED LEGISTLATION IN KOREA] - Technical and operating parameters and spectrum use for short range radiocommunication devices     Korea (Republic of)     2020-11-13
[ 5 ]  
 
Proposesed revision of Report ITU-R SM.2153-7 (Technical Regulation for SRDs in Korea)     Korea (Republic of)     2020-11-13
[ 4 ]  
 
Proposed draft new ITU-R Question - Spectrum management framework for the introduction of GPR/WPR     Korea (Republic of)     2020-11-13
Resultats:14 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2025-11-2