Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP7A : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP7A  C 

UIT-R WP7A

Émissions de Fréquences Etalon et de Signaux Horaires

Resultats:22 documents
Contributions  [ Source: WP 1A ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 100 ]  
 
Reply liaison statement to Working Party 7A - Draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems     WP 1A     2019-06-24
[ 99 ]  
 
Reply liaison statement to CISPR (copy to ITU-R Working Parties 1A, 5A, 5B, 6A and 7A) - Establishment of liaison between CISPR-B and the relevant groups in ITU-R     WP 1A     2019-06-21
[ 98 ]  
 
Reply liaison statement to ITU-R Working Parties 5A and 5D and ITU-T Study Group 15 and 3GPP TSG RAN (copy to ITU-R Working Parties 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Working document towards a preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems     WP 1A     2019-06-21
[ 97 ]  
 
Reply liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A, 6B, 7A, 7B and 7D) - Liaison acitvities on the G.mgfast and G.fast - Power Spectral Density specifications     WP 1A     2019-06-21
[ 96 ]  
 
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Liaison between ITU-R and CISPR ont the protection of radio services in the 6-40 GHz frequency range     WP 1A     2019-06-18
[ 95 ]  
 
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise     WP 1A     2019-06-18
[ 94 ]  
 
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reproted cases of interference     WP 1A     2019-06-18
[ 66 ]  
 
Liaison statement to Working Parties 5A, 5B, 6A and 7A (copy to Working Party 1B for information) on preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems     WP 1A   Q210/1   2018-06-29
[ 65 ]  
 
Liaison statement to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility management systems     WP 1A     2018-06-29
[ 64 ]  
 
Reply liaisons statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7D) - Liaison activities on the G.mgfast PSD specification     WP 1A     2018-06-29
[ 63 ]  
 
Liaison statement to CISPR and ITU-T Study Group 5 on EMC standards and limits (copy to ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C & 7D) - Further Reports of Disturbances to Radiocommunication systems     WP 1A     2018-06-21
[ 37 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7A, 7B, 7C & 7D on Resolution 63 (Rev. WRC-12)     WP 1A     2017-07-10
[ 31 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transfer (WPT)     WP 1A   Q210/1   2016-12-13
[ 30 ]  
 
Reply liaison statement to Working Party 7A - Radio frequency ranges or wireless power transmission (WPT)     WP 1A   Q210/1   2016-12-13
[ 29 ]  
 
Reply liaison statement to Working Party 6A (copy to Working Parties 1B, 1C, 5A, 5B, 5C, 7A and 7D) - Radio frequency ranges for wireless power transmission (WPT)     WP 1A   Q210/1   2016-12-13
[ 28 ]  
 
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges or wireless power transmission using technologies other than Radio Frequency Beam     WP 1A   Q210/1   2016-12-13
[ 26 ]  
 
Liaison statement to Working Parties 1C, 3L, 5A, 5B, 5C, 6A, 7A and 7D - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services     WP 1A     2016-12-13
[ 12 ]  
 
Liaison statement to Working Party 7D (copy to Working Parties 1B, 5A, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to protection of the passive services     WP 1A   Q210/1   2016-06-16
[ 11 ]  
 
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to the services under the purview of WP 5B     WP 1A   Q210/1   2016-06-16
[ 10 ]  
 
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 5B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 1A   Q210/1   2016-06-16
[ 9 ]  
 
Liaison statement to Working Parties 1B, 5A, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 1A   Q210/1   2016-06-16
[ 8 ]  
 
Liaison statement to Working Parties 1C & 3L (copy for information to Working Parties 5A, 5B, 5C, 6A, 7A & 7D) - Assessment of the impact of other emissions to Radiocommunication services (Questions ITU-R 221-2/1 & ITU-R 236/1)     WP 1A     2016-06-15
Resultats:22 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2025-7-23