Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP4A-AR : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP4A-AR  C 

UIT-R WP4A-AR

Utilisation Efficace de l'Orbite/Spectre pour le SFS et le SRS

Resultats:25 documents
Contributions  [ AI/Question: AI1.4 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 590 ]  
 
Working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions - Agenda item 1.4     United States of America   AI1.4   2019-06-19
[ 557 ]  
 
Proposals on WRC-19 agenda item 1.4 in relation to working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7]     Russian Federation   AI1.4   2019-06-18
[ 554 ]  
 
Draft new Report ITU- BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-15) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions     Luxembourg   AI1.4   2019-06-14
[ 533 ]  
 
Proposed revisions to the draft CPM text - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev. WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all regions - Agenda item 1.4     United States of America   AI1.4   2018-06-26
[ 464 ]  
 
Proposals on WRC-19 agenda item 1.4 in relation draft CPM text     Russian Federation   AI1.4   2018-06-22
[ 453 ]  
 
Draft CPM text for WRC-19 agenda item 1.4 - Agenda item 1.4     Spain   AI1.4   2018-05-30
[ 436 ]  
 
Proposals on WRC-19 agenda item 1.4 in relation to preliminary draft CPM text     Russian Federation   AI1.4   2018-02-13
[ 417 ]  
 
Proposed revisions to the draft CPM text - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev. WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions     United States of America   AI1.4   2018-02-13
[ 404 ]  
 
Draft CPM text for WRC-19 agenda item 1.4 - Agenda item 1.4     Luxembourg   AI1.4   2018-02-13
[ 403 ]  
 
Preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for he GSO broadcasting-satellite service in all Regions - Agenda item 1.4     Luxembourg   AI1.4   2018-02-13
[ 328 ]  
 
Proposal for CPM text on WRC-19 agenda item 1.4 - Review of Annex 7 to Appendix 30 (Rev. WRC-12)     Papua New Guinea   AI1.4   2017-10-10
[ 326 ]  
 
Preliminary draft CPM text for WRC-19 agenda item 1.4 - Agenda item 1.4     Luxembourg   AI1.4   2017-10-10
[ 325 ]  
 
Preliminary draft new Report for WRC-19 agenda item 1.4 ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR - Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions - Agenda item 1.4     Luxembourg   AI1.4   2017-10-10
[ 324 ]  
 
Alternative proposal regarding limitation A3 - Agenda item 1.4     Luxembourg   AI1.4   2017-10-10
[ 321 ]  
 
Proposal for ammendments of CPM text - WRC-19 agenda item 1.4     Egypt (Arab Republic of) , Oman (Sultanate of) , Saudi Arabia (Kingdom of) , United Arab Emirates   AI1.4   2017-10-10
[ 297 ]  
 
Preliminary draft CPM text for WRC-19 agenda item 1.4 - Agenda item 1.4     United States of America   AI1.4   2017-10-10
[ 296 ]  
 
Preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions     United States of America   AI1.4   2017-10-10
[ 272 ]  
 
Proposals on WRC-19 agenda item 1.4 in relation to WD towards PDNRep ITU-R BO.[AP30.ANNEX7]     Russian Federation   AI1.4   2017-10-09
[ 271 ]  
 
Estimation of the protection level of the earth station with antenna smaller than 60 cm provided by the presence of forbidden arc portions     Russian Federation   AI1.4   2017-10-09
[ 270 ]  
 
Proposals on WRC-19 agenda item 1.4 in relation to preliminary draft CPM text     Russian Federation   AI1.4   2017-10-09
[ 214 ]  
 
Review and possible revision of Annex 7 to Appendix 30 of the Radio Regulations     France , Eutelsat S.A.   AI1.4   2017-04-26
[ 211 ]  
 
Estimation of allowable interference level produced by frequency assignments located in the allowable orbital arc portions and being in compliance with pfd limits of Annex 1 (Section1) to RR Appendix 30 for stations using smaller than 60 cm antenna     Russian Federation   AI1.4   2017-04-26
[ 210 ]  
 
Proposals on WRC-19 agenda item 1.4     Russian Federation   AI1.4   2017-04-26
[ 207 ]  
 
Draft CPM text     Luxembourg   AI1.4   2017-04-26
[ 206 ]  
 
Proposed revisions to the working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev. WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions     Luxembourg   AI1.4   2017-04-26
Resultats:25 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2026-7-28