|
Format |
Taille |
Mise à disposition |
|
|
|
English |
Word
|
48858 octets |
2017-06-09 |
[364] Annex 46- List of liaison statements to ITU-R Groups |
|
Word
|
45671 octets |
2017-05-24 |
[364] Annex 45- Note to the Director, Radiocommunication Bureau - Consideration of definitive reduced service areas of affected networks during the process of entering an assignment into the RR Appendix 30B List |
|
Word
|
46894 octets |
2017-05-18 |
[364] Annex 44- Work plan for WRC-19 agenda item 9.1, issue 9.1.9 |
|
Word
|
47222 octets |
2017-05-19 |
[364] Annex 43- Working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.3 |
|
Word
|
48651 octets |
2017-05-19 |
[364] Annex 42- Work plan for WRC-19 agenda item 9.1, issue 9.1.3 |
|
Word
|
53377 octets |
2017-05-19 |
[364] Annex 41- Working document towards preliminary draft CPM Text for WRC-19 agenda item 9.1, issue 9.1.2 |
|
Word
|
50507 octets |
2017-05-19 |
[364] Annex 40- Work plan for WRC-19 agenda item 9.1, issue 9.1.2 |
|
Word
|
65189 octets |
2017-05-24 |
[364] Annex 39- Working document towards preliminary draft CPM Text for WRC-19 agenda item 7 - Issue G: Updating the reference situation for networks under RR Appendices 30 and 30A when provisional recording is used - agenda item 7 |
|
Word
|
78496 octets |
2017-05-19 |
[364] Annex 38- Working document towards preliminary draft CPM Text for WRC-19 agenda item 7 - Issue F: Concerns with the lack of implementation of certain provisions of the Radio Regulations that can lead to difficulties during the process of entering an assignment into the RR Appendix 30B List |
|
Word
|
65193 octets |
2017-05-23 |
[364] Annex 37- Preliminary draft CPM Text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12, 9.12A and 9.13 [or 9.21] |
|
Word
|
63952 octets |
2017-05-22 |
[364] Annex 36- Preliminary draft CPM Text for WRC-19 agenda item 7 - Issue C: Issues for which consensus was readily achieved in ITU-R |
|
Word
|
46336 octets |
2017-05-19 |
[364] Annex 35- Work plan for WRC-19 agenda item 7 |
|
Word
|
47533 octets |
2017-05-18 |
[364] Annex 34- Working document towards preliminary draft CPM Text for WRC-19 agenda item 1.6 |
|
Word
|
48777 octets |
2017-05-18 |
[364] Annex 33- Work plan for WRC-19 agenda item 1.6 |
|
Word
|
47390 octets |
2017-05-18 |
[364] Annex 32- Working document towards preliminary draft CPM Text for WRC-19 agenda item 1.5 |
|
Word
|
45546 octets |
2017-05-18 |
[364] Annex 31- Work plan for WRC-19 agenda item 1.5 |
|
Word
|
134947 octets |
2017-05-18 |
[364] Annex 30- Preliminary draft CPM text for WRC-19 agenda item 1.4 |
|
Word
|
49331 octets |
2017-05-18 |
[364] Annex 29- Work plan for WRC-19 agenda item 1.4 |
|
Word
|
438190 octets |
2017-05-19 |
[364] Annex 28- Working document - WRC-19 agenda item 7 -Issue H: Modifications to RR Appendix 4 data elements to be provided for non-geostationary satellite networks/systems |
|
Word
|
56583 octets |
2017-05-18 |
[364] Annex 27- Working document - Validation of the minimum and maximum emission parameters contained within submissions of FSS satellite networks not subject to RR Appendices 30, 30A and 30B |
|
Word
|
51554 octets |
2017-05-18 |
[364] Annex 26- Working document - Establishment of a facility to the administrations in order to observe their comments/objections under RR No. 9.51 and RR No. 9.52 for coordination under RR Nos. 9.7, 9.7A and 9.7B |
|
Word
|
46118 octets |
2017-05-18 |
[364] Annex 25- Working document - Consideration of the difficulties for PART B examinations in accordance with § 6.17 of RR Appendix 30B |
|
Word
|
53469 octets |
2017-05-18 |
[364] Annex 24- Working document - Issue of modification of Section 1, Annex 1 of RR Appendix 30 under WRC-19 agenda item 7 |
|
Word
|
52792 octets |
2017-05-18 |
[364] Annex 23- Working document - Harmonization of RR Appendix 30B with RR Appendices 30 and 30A - WRC-19 agenda item 7 - Issue E |
|
Word
|
160556 octets |
2017-05-18 |
[364] Annex 22- Working document - Application of coordination arc in the Ka-band, to determine coordination requirements between the FSS and other satellite services - WRC-19 agenda item 7 - Issue B |
|
Excel 2007
|
18459 octets |
2017-05-12 |
[364] Annex 21 Part 3
|
|
Excel 2007
|
29569 octets |
2017-05-12 |
[364] Annex 21 Part 2
|
|
Excel 2007
|
32146 octets |
2017-05-12 |
[364] Annex 21 Part 1
|
|
Word
|
130396 octets |
2017-05-12 |
[364] Annex 21- Working document on WRC-19 agenda items 1.13, 1.14 and 1.16 - FSS/BSS technical parameters for sharing studies under WRC-19 agenda items 1.13, 1.14 and 1.16
|
|
Word
|
1618902 octets |
2017-05-18 |
[364] Annex 20- Working document - Considerations on the content and application of Recommendation ITU-R S.1503-2 |
|
Word
|
620292 octets |
2017-05-18 |
[364] Annex 19- Working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz |
|
Word
|
3999273 octets |
2017-05-18 |
[364] Annex 18- Working document towards a preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9 |
|
Word
|
138081 octets |
2017-05-18 |
[364] Annex 17- Working Document towards a preliminary draft new Report ITU-R S.[NGSO_6/4-GHz] - Technical and regulatory studies for 6/4 GHz non-GSO FSS sharing |
|
Word
|
1038974 octets |
2017-05-18 |
[364] Annex 16- Working document towards a preliminary draft new Report ITU-R S.[NGSO FSS 6/4 GHz SHARING] - Sharing between non- geostationary-satellite orbit systems in the fixed-satellite service and existing and planned systems in the terrestrial and space services allocated on a primary basis in the frequency bands 3 700-4 200 MHz, 4 500-4 800 MHz, 5 925-6 425 MHz and 6 725-7 025 MHz |
|
Word
|
1019732 octets |
2017-05-18 |
[364] Annex 15 Part 1
|
|
Word
|
1521631 octets |
2017-05-18 |
[364] Annex 15- Working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] - Compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz in different countries in Regions 1 and 3 |
|
Word
|
48141 octets |
2017-05-18 |
[364] Annex 14- Working document towards a preliminary draft new Report ITU-R S.[FSS_ABOVE_30 GHZ] - Spectrum needs of the fixed-satellite service in allocations above 30 GHz |
|
Word
|
4235467 octets |
2017-05-18 |
[364] Annex 13- Working document towards a preliminary draft new report on sharing between 50/40 GHz GSO networks and non-gso systems - WRC-19 agenda item 1.6 |
|
Word
|
1434465 octets |
2017-05-18 |
[364] Annex 12- Working document [towards a preliminary draft new Report] on the protection of EESS (passive) and RAS systems from non GSO satellite systems operating in the 37.5-42.5 GHz, 47.2 50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda Item 1.6 |
|
Word
|
5516570 octets |
2017-05-18 |
[364] Annex 11- Working document [towards a preliminary draft new Recommendation/Report] on a methodology to estimate the interference from land-based earth stations in motion (ESIM) communicating with geostationary space stations in the fixed satellite service into fixed service stations operating in the 27.5-29.5 GHz frequency band |
|
Word
|
917427 octets |
2017-05-18 |
[364] Annex 10- Working document towards a preliminary draft new Report ITU-R S.[ESIM] - Operation of earth stations in motion (ESIM) in fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz - Protection criteria for feeder links of the MSS in the bands 19.3-19.7 GHz and 29.1-29.5 GHz |
|
Word
|
1168951 octets |
2017-05-18 |
[364] Annex 09- Working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz |
|
Word
|
3465001 octets |
2017-05-18 |
[364] Annex 08- Working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz |
|
Word
|
16754509 octets |
2017-05-18 |
[364] Annex 07- Working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions |
|
Word
|
308726 octets |
2017-05-18 |
[364] Annex 06- Working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands |
|
Word
|
1513554 octets |
2017-05-18 |
[364] Annex 05- Working document towards a preliminary draft new Recommendation ITU-R S.[50/40 GHZ FSS SHARING METHODOLOGY] - Maximum permissible levels of interference in a satellite network (GSO and non-GSO) in the fixed-satellite service caused by other co-directional FSS networks operating in the 50/40 GHz frequency bands |
|
Word
|
600130 octets |
2017-05-18 |
[364] Annex 04- Preliminary draft new Report ITU-R S.[INTRF MGMT VSAT IN 27.5-30 GHZ] - Uplink interference issues associated with closely separated GSO FSS VSAT networks in the 27.5-30 GHz frequency band |
|
Word
|
1275423 octets |
2017-05-18 |
[364] Annex 03- Preliminary draft new Report ITU-R S.[SPECTRUM _NEEDS] - Spectrum needs for the FSS in the 51.4-52.4 GHz band - WRC-19 agenda item 9.1, issue 9.1.9 |
|
Word
|
2760144 octets |
2017-05-18 |
[364] Annex 02 Part 2
|
|
Word
|
1899878 octets |
2017-05-18 |
[364] Annex 02 Part 1
|
|
Word
|
4565748 octets |
2017-05-18 |
[364] Annex 02- Preliminary draft revision of Recommendation ITU-R S.1503-2 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations |
|
Word
|
273735 octets |
2017-05-18 |
[364] Annex 01- Preliminary draft new [Recommendation/Report] ITU-R S.[GUIDELINES_14.5-14.8 GHZ] - Guidelines to conduct bilateral coordination for explicit agreements, in the frequency band 14.5-14.75 GHz, for Regions 1 and 2 countries, or in the frequency band 14.5-14.8 GHz, for Region 3 countries... |
|
Word
|
112891 octets |
2017-06-09 |
[364] - Report on the meeting of Working Party 4A (Geneva, 3-12 May 2017) |
|
|