Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP1B : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP1B  C 

UIT-R WP1B

Méthodologies de la Gestion du Spectre et Stratégies Economiques

Resultats:383 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 33 ]  
 
Liaison statement to Working Party 6A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda 1.1     WP 5A   AI1.1   2016-05-25
[ 32 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 1B, 5B 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 5A     2016-05-25
[ 31 ]  
 
Sustainable socio-economic spectrum management     Canada   Q205/1   2016-05-25
[ 30 ]  
 
Progressing the working document towards a preliminary draft new Report ITU-R SM.[INNOVATIVE REGULATORY TOOLS] "Innovative regulatory tools to support enhanced shared use of the spectrum"     Canada     2016-05-25
[ 29 ]  
 
Initial considerations on WRC-19 agenda item 9.1, issue 9.1.7 - Studies on management of unauthorized operation of earth station terminals     China (People's Republic of)   AI9.1   2016-05-24
[ 28 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1046 - An alternative method of spectrum utilization efficiency of a land mobile system     China (People's Republic of)     2016-05-24
[ 27 ]  
 
Proposals on WRC-19 agenda item 9.1 (issue 9.1.6)     China (People's Republic of)   AI9.1   2016-05-24
[ 26 ]  
 
Reply liaison statement to Working Party 5C copied to Working Parties 1A and 1B for information - Preliminary draft new Report ITU-R F.[FS/RLS COMPATIBILITY IN 71-86 GHZ] - P-P/P-MP applications in the fixed service operating in the 71-76 GHz and 81-86 GHz bands and automotive radar applications in the radiolocation service operating in the 76-77.5 GHz and 78-81 GHz bands     WP 5B     2016-05-20
[ 25 ]  
 
Reply liaison statement to ITU-T Study Group 5, ITU-R Working Parties 5D and 6A (copy for information to Working Parties 3L, 1B, 1C and ITU-D Study Group 2) - Human exposure to electromagnetic fields (EMFS)     WPs 5A, 5B and 5C     2016-05-20
[ 24 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1413-3 - Radiocommunication Data Dictionary (RDD)     United Kingdom of Great Britain and Northern Ireland     2016-05-20
[ 23 ]  
 
Proposed modifications to the working document towards preliminary draft new Report/Recommendation ITU-R SM.[SRD-CATEGORIES] - Global harmonization of SRD categories     United States of America     2016-05-18
[ 22 ]  
 
Report of the activities of the Correspondence Group (CG) on SRD on Classification     Chairman, CG on SRD Classification     2016-05-17
[ 21 ]  
 
Working Party 1B Rapporteur Group on cognitive radio system spectrum management challenges - Rapporteur's Report     Rapporteur, RG on CRS SM challenges     2016-05-13
[ 20 ]  
 
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5     ITU-T SG 5     2016-05-13
[ 19 ]  
 
Attendance Report of CISPR meeting     Liaison Rapporteur with CISPR on WPT     2016-05-12
[ 18 ]  
 
Draft editorial modification of Report ITU-R SM.2153     ATDI     2016-05-09
[ 17 ]  
 
Liaison statement on the progress of ongoing work on WTDC Resolution 9 (Rev.Dubai, 2014) during the ITU-D study period 2014-2017     ITU-R/ITU-T JG on WTDC Res.9     2016-04-25
[ 16 ]  
 
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 7D   Q210/1   2016-04-13
[ 15 ]  
 
Working document on the work plan and milestones for the ITU-R studies on item 2 of the Annex to Resolution 958 (WRC-15), (WRC-19 agenda item 9.1, issue 9.1.7) - Studies on managing uplink transmissions of terminals to those authorized terminals     Chairman, WP 1B   AI9.1   2016-04-13
[ 14 ]  
 
Working document on the work plan and milestones for the ITU-R studies on item 1 of the Annex to Resolution 958 (WRC-15) (WRC-19 agenda item 9.1, issue 9.1.6) - Studies concerning wireless power transmission (WPT) for electric vehicles     Chairman, WP 1B   AI9.1   2016-04-13
[ 13 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties     Chairman, CCV     2016-04-01
[ 12 ]  
 
RF Human exposure - Exposure distances around Point to Point Systems     ATDI     2016-03-29
[ 11 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C AND 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     WP 5D     2016-03-09
[ 10 ]  
 
Liaison statement to WP 1B (copy to ITU-D SG 1 and ITU-R WP 5A for information) - Working document towards a preliminary draft new Report ITU-R SM.[INNOVATIVE REGULATORY TOOLS]     WP 5D     2016-03-09
[ 9 ]  
 
Reply liaison statement to ITU-T Study Group 5, ITU-D Study Group 2, ITU-R Working Party 6A (copy for information to Working Parties 3L, 1B, 1C, 5A, 5B, 5C) on information about work that is being carried out within work under study in ITU-T Q7/5 (Human exposure to electromagnetic fields (EMFS) due to radio systems and mobile equipment)     WP 5D     2016-03-08
[ 8 ]  
 
Reply liaison statement to IRG-AVA (copy for information to ITU-R Working Parties 1B, 5A, 6A, Study Group 5, ITU-T Study Groups 9 and 16) - Barriers to wireless connections for hearing aids and medical devices     WP 5D     2016-03-08
[ 7 ]  
 
Proposed changes to Report ITU-R SM.2012-4 (2014) "Economic aspects of spectrum management "     Russian Federation     2016-03-01
[ 6 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[INNOVATIVE REGULATORY TOOLS]     Russian Federation     2016-03-01
[ 5 ]  
 
Liaison statement on request to consider the hearing aids issue on Wireless Power Transmission (WPT) work     ITU-T JCA-AHF     2016-02-12
[ 4 ]  
 
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda item 1.1     WP 6A   AI1.1   2016-02-03
[ 3 ]  
 
Liaison statement on new ITU-T SG 20     ITU-T SG 20     2015-12-15
[ 2 ]  
 
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5     ITU-T SG 5     2015-12-08
[ 1 ]  
 
Documents to be carried over from the 2012-2015 study period     WP 1B     2015-12-08
Resultats:383 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2020-12-16