Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP5B : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP5B  C 

UIT-R WP5B

Service mobile maritime, y compris le Système mondial de détresse et de sécurité en mer (SMDSM); service mobile aéronautique et service de radiorepérage

Resultats:895 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 95 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 94 ]  
 
Note to Study Group 5 (copy for information to WPs 5A, 5B and 5C) - Proposal for exploring the possibility of additional/supplementary search tool(s) to identify ITU-R Recommendations of the "M"-series by frequency bands and applications     WP 5D     2012-10-16
[ 93 ]  
 
Liaison statement to Working Party 5B - (copy to WPs 5A and 5C for information) - WRC-15 Agenda item 1.15     WP 5D     2012-10-15
[ 92 ]  
 
Reply liaison statement to Working Party 5B - WRC-15 Agenda item 1.12 - Characteristics for radars operating in the radiodetermination service in the frequency bands 8 700-9 300 MHz and 9 900-10 500 MHz     WP 7C     2012-10-15
[ 91 ]  
 
Liaison statement to Working Party 5B - Compatibility between EESS (active) and radiolocation within the 35.5-36 GHz band     WP 7C     2012-10-15
[ 90 ]  
 
Liaison statement to Working Party 5B - WRC-15 Agenda item 1.18     WP 7D     2012-10-10
[ 89 ]  
 
Liaison statement to Working Party 5B - Technical and operational characteristics of SRS systems operating in the frequency range 76-81 GHz in support of WRC-15 Agenda item 1.18     WP 7B     2012-10-09
[ 88 ]  
 
Liaison statement to Working Parties 5A and 5C (for action) and Working Parties 4C, 5B, 7A, 7B, 7C and 7D (for information) - WRC-15 Agenda item 1.8     WP 4A     2012-10-05
[ 87 ]  
 
Liaison statement to Working Party 5B (copy to Working Parties 3M, 4C and 5A) - WRC-15 Agenda item 1.7     WP 4A     2012-10-05
[ 86 ]  
 
Liaison statement to Working Party 5B - WRC-15 Agenda item 1.5     WP 4A     2012-10-05
[ 85 ]  
 
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B, 7C and 7D (copy to Working Parties 3M and 6B for information) - WRC-15 Agenda item 1.6     WP 4A     2012-10-05
[ 84 ]  
 
Liaison statement to Study Group 5 and note to the Director, Radiocommunication Bureau - Proposal for exploring the possibility of additional/supplementary search tool(s) to identify ITU-R Recommendations of the "M"-series by frequency bands and applications     SG 4     2012-10-04
[ 83 ]  
 
Progress of the studies in response to ITU-R Resolutions     Chairman, SG 5     2012-09-24
[ 82 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D     WP 4C     2012-09-18
[ 81 ]  
 
Liaison statement to Working Parties 4A, 5A, 5C, 7B (copy for information to Working Parties 3M, 4B, 5B) - WRC-15 Agenda item 1.9.2     WP 4C     2012-09-14
[ 80 ]  
 
Proposal on the arrangement of ITU-R Recommendations of the "M"-series     Russian Federation     2012-08-29
[ 79 ]  
 
Liaison statement to Working Party 5B - Compatibility studies in relation to Resolution 224 (Rev.WRC-12)     WP 5D     2012-07-23
[ 78 ]  
 
Liaison statement to ITU-R Working Party 5B - World Radiocommunication Conference 2015 (WRC-15), Agenda item 1.16 - To consider regulatory provisions and spectrum allocations to enable possible new automatic identification system (AIS) technology applications and possible new applications to improve maritime radiocommunication in accordance with Resolution 360 (WRC-12)     International Maritime Organization     2012-07-10
[ 77 ]  
 
Liaison statement to ITU-R Working Party 5B - Revision of Recommendation ITU-R M.1371-4 - Technical characteristics for an automatic identification system using time-division multiple access in the VHF maritime mobile band     International Maritime Organization     2012-07-10
[ 76 ]  
 
Results of the 19th RAG meeting     Chairman, SG 5     2012-07-03
[ 75 ]  
 
Liaison statement to Working Party 5B on propagation methods for the calculation of the target detection distance of automotive radars in the 77-78 GHz band     WP 3M     2012-07-02
[ 74 ]  
 
Liaison statement to ITU-R Working Party 5B - World Radiocommunication Conference (WRC-15) Agenda Item 1.15     WP 3K     2012-06-29
[ 73 ]  
(Rev.1) 
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and Joint Task Group 4-5-6-7 - Handbook on ITU-R propagation prediction methods for interference and sharing studies     WP 3M     2012-06-29
[ 72 ]  
 
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS)     WPs 1A and 1B     2012-06-25
[ 71 ]  
 
Reply liaison statement to Working Party 5B - WRC-15 Agenda item 1.18     WP 1B     2012-06-22
[ 70 ]  
 
Liaison statement to Working Party 5B - Use of the fixed-satellite service to support safe operation of UAS in non-segregated air space (WRC-15 Agenda item 1.5)     WP 4A     2012-06-21
[ 69 ]  
 
Liaison statement to Working Party 5B - WRC-15 Agenda item 1.6     WP 4A     2012-06-19
[ 68 ]  
 
Liaison statement to CISPR and ITU-R Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - A database for the protection of radio services     WP 1A     2012-06-19
[ 67 ]  
 
Liaison statement to ITU-R WPs 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (copy to ITU-R WP 3L and to ITU-T SGs 5, 9 and 15 for information and/or action if any) - Developments on coexistence of wired telecommunication (including PLT) and radiocommunication systems     WP 1A     2012-06-19
[ 66 ]  
 
Liaison statement to Study Groups 3, 4, 5, 7 and relevant Working Parties - Active services operating above 275 GHz     SG 1     2012-06-15
[ 65 ]  
 
Liaison statement to Working Parties 5B and 5C regarding studies related to WRC-15 Agenda item 1.4     WP 5A     2012-06-05
[ 64 ]  
 
Liaison statement to relevant Working Parties of Study Group 5 on further studies on cognitive radio systems (CRS) (copy for information to relevant Working Parties of Study Groups 1, 4, 6 and 7)     WP 5A     2012-06-05
[ 63 ]  
 
Liaison statement to Working Parties 5B, 5C and 5D (copy to Working Parties 1B, 4A, 4B, 4C, 6A, 7B, 7C, 7D for information) - Preparations for WRC-15 Agenda item 1.3 in response to decisions of CPM15-1     WP 5A     2012-06-05
[ 62 ]  
+Ann.2-32 
Report of the meeting of Working Party 5B (Geneva, 22 May - 1 June 2012)     Chairman, WP 5B     2012-06-01
[ 61 ]  
 
Final List of Participants - Working Party 5B (Geneva, 22 May-1 June 2012)     Director, BR     2012-06-01
[ 60 ]  
 
Liaison statement to Working Party 5B - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.17     WP 5C     2012-05-30
[ 59 ]  
 
Liaison statement to Working Party 5B - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.15     WP 5C     2012-05-29
[ 58 ]  
 
Liaison statement to Working Parties 5A and 5B - Potential impact to the fixed service from vehicular collision avoidance radar in adjacent frequency bands 76-77 GHZ AND 77-81 GHz     WP 5C     2012-05-29
[ 57 ]  
 
Liaison statement to Working Party 5B - Protection of RNSS receivers operating in 5 010-5 030 MHz from AM(R)S transmitters operating in 5 030-5 091 MHz     WP 4C     2012-05-28
[ 56 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D (Copy to Working Parties 4B and 3M for information) - WRC-15 Agenda item 1.10     WP 4C     2012-05-28
[ 55 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D (Copy to Working Parties 4B and 3M for information) - WRC-15 Agenda item 1.10     WP 4C     2012-05-28
[ 54 ]  
 
Liaison statement to Working Parties 4A, 5A, 5C and 7B (copy to Working Parties 3M, 4B and 5B for information) - WRC-15 Agenda item 1.9.2     WP 4C     2012-05-28
[ 53 ]  
 
Liaison statement to Working Party 5B - (Copy to WP 5C and WP 5D for information) - WRC-15 Agenda item 1.15     WP 5A     2012-05-25
[ 52 ]  
 
List of documents issued     BR Study Groups Department     2012-05-21
[ 51 ]  
 
Preliminary draft new Recommendation - Operational and technical characteristics and protection criteria of radio altimeters utilizing the band 4 200-4 400 MHz     France     2012-05-15
[ 50 ]  
 
Characteristics of and protection criteria for radars operating in the radionavigation service in the frequency band 76-81 GHz     Germany (Federal Republic of)     2012-05-15
[ 49 ]  
 
Proposed modification to working document toward a preliminary draft new Report ITU-R M.[MAN OVERBOARD SYSTEM] - Specifications, design and use of maritime survivor locating systems and devices (man overboard systems)     Germany (Federal Republic of)     2012-05-15
[ 48 ]  
 
Working document towards a preliminary draft new Report ITU-R M.[MAN OVERBOARD SYSTEM] - Specifications, design and use of maritime survivor locating systems and devices (man overboard systems)     Australia     2012-05-15
[ 47 ]  
 
Draft liaison statement to Working Party 7C - WRC-15 Agenda item 1.12 - Characteristics of and protection criteria for radars operating in the radiodetermination service in the frequency bands 8 700-9 300 MHz and 9 900-10 500 MHz     Germany (Federal Republic of)     2012-05-15
[ 46 ]  
 
Report on live trials of AIS personal locator beacons for signalling and resolving man overboard incidents     United Kingdom of Great Britain and Northern Ireland     2012-05-14
Resultats:895 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2020-12-17