Contributions
Numéro
Titre
Source
AI/Question
Filtre...
136-2/6
205/5
205-/5
205-5/5
209-4/5
212-4/5
215-4/5
230-3/5
238-2/5
240/5
241/5
241-1/5
241-2/5
37-5/5
48-6/5
48-7/5
Effacer filtre
Date
[ 594 ]
Proposed amendments to the Questions assigned to Working Party 5A
Canada
2014-10-20
[ 593 ]
Progression of the preliminary draft revision of Recommendation ITU-R M.1824 - System characteristics of television outside broadcast, electronic news gathering and electronic field production in the mobile service for use in sharing studies
Canada
2014-10-20
[ 592 ]
Proposed modifications to preliminary draft new Report ITU-R M.[5 MHz COMPAT]
Canada
2014-10-20
[ 591 ]
Proposed amendments to the working document toward a preliminary draft revision of Recommendation ITU-R M.2015 - Frequency arrangements for public protection and disaster relief radiocommunication systems in UHF bands in accordance with Resolution 646 (Rev.WRC-12)
Canada
2014-10-20
[ 590 ]
Proposed amendments to the preliminary draft revision of Recommendation ITU-R M.2009 - Radio interface standards or use by public protection and disaster relief operations in some parts of the UHF band in accordance with Resolution 646 (WRC-03)
Canada
2014-10-20
[ 589 ]
Progression of the working document towards a preliminary draft new Report ITU-R M.[PPDR] "Public protection and disaster relief communications"
Canada
2014-10-20
[ 588 ]
Improvements to the working document towards a preliminary draft new Report on M.[LOCAL_COVERAGE] "Operational guidelines for the deployment of broadband mobile systems for local coverage in the frequency bands below 6 GHz / Local coverage operation of broadband wireless access systems in the bands below 6 GHz."
United States of America
2014-10-18
[ 587 ]
Proposed liaison reply to Working Party 1B, regarding working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]
United States of America
2014-10-18
[ 586 ]
Proposals on Addendum of the ITU-R Recommendation M.1450-5 "Characteristics of broadband radio local area networks" related considerations and possible actions on testing for conformance assessment
Ukrainian State Centre of Radio Frequencies
2014-10-17
[ 585 ]
Proposed modifications to the working document towards a preliminary draft new Report ITU-R M.[PPDR]
Motorola Solutions Inc.
2014-10-17
[ 584 ]
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4C, 5A, 5B 5C, 6A and ITU-T Study Group 15) - Considerations on the G.9700 power spectral densitiy (PSD) limit mask
WP 7D
2014-10-17
[ 583 ]
Liaison statement to the Special Committee (copy for information to Working Parties 5A and 6A) - WRC-15 agenda item 9.1 (9.1.8)
WP 7B
2014-10-17
[ 582 ]
Liaison statement to Working Party 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (for information)
WP 7B
2014-10-16
[ 581 ]
Proposed further amendment of working document towards a preliminary draft new Report ITU-R- M.[PPDR]
Australia
2014-10-16
[ 580 ]
Report of the tenth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters
International Maritime Organization
2014-10-15
[ 579 ]
Proposals for update of preliminary draft new Report ITU-R M.[5 MHz COMPAT] - Compatibility analysis of possible amateur service stations with fixed, land mobile, maritime mobile and radiolocation services in the frequency band 5 250-5 450 kHz and the aeronautical mobile service in an adjacent band
Russian Federation
2014-10-15
[ 578 ]
Liaison statement on Question ITU-R 254/5 - Operation of short-range Radiocommunication public access system supporting hearing aid systems
Director, BR
2014-10-15
[ 577 ]
Progress Report of Joint Correspondence Group activity
Chairman, JCG 5A/5C
2014-10-13
[ 576 ]
Liaison statement on current status on draft Recommendation ITU-T K.mhn and issues related to coexistence of wired telecommunications and radio communication
ITU-T SG 9
2014-10-09
[ 575 ]
Liaison statement to 3GPP (copy to ITU-R Working Party 5A and Working Party 5D) - Liaison statement regarding scope and status relevant to PPDR work items and study items
Asia-Pacific Telecommunity
2014-10-08
[ 574 ]
Working document towards a preliminary draft revision of Recommendation ITU-R M.2015 - Frequency arrangements for public protection and disaster relief radiocommunication systems in UHF bands in accordance with Resolution 646 (Rev. WRC-12)
Israel (State of)
2014-10-07
[ 573 ]
Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)
ITU-T SG 9
2014-09-30
[ 572 ]
Report
CG on Rep. M.[PPDR]
2014-09-30
[ 571 ]
Liaison statement to Working Party 5A - Revised element for sharing studies being conducted under WRC-15 agenda items 1.6 & 1.6.2
WP 4A
2014-09-10
[ 570 ]
Activity Report for Working Party 5A
CG on Rep. Local Coverage
2014-09-09
[ 569 ]
(Rev.1)
Results of the 21th RAG meeting
Chairman, SG 5
2014-08-27
[ 568 ]
Reply liaison statement informing about MEF 22.1 and MEF 22.1.1 - Mobile backhaul implementation agreement
Director, BR
2014-08-20
[ 567 ]
LS/r on Recommendation ITU-T K.60 - Coexistence of wired and wireless communication systems
ITU-T SG 5
2014-08-08
[ 566 ]
Liaison statement to Working Party 5A - Updating the integrated database of ITU terms and definitions
CCV
2014-07-30
[ 565 ]
Liaison statement on draft ITU-T F.ACC-Term
ITU-T SG 16
2014-07-28
[ 564 ]
Reply liaison statement to Working Party 5A - WRC-15 agenda item 1.10
WP 4C
2014-07-17
[ 563 ]
Reply liaison statement to Working Party 5A - WRC-15 agenda item 1.9.2
WP 4C
2014-07-17
[ 562 ]
Liaison statement ITU-R Working Party 5A on ITS technical parameters, Recommendation ITU-R M.[V2X]
European Telecommunications Standards Institute
2014-06-19
[ 561 ]
(Rev.1)
[WORKING PARTY 5A AND] Working Party 5D - Proposal for draft reply liaison statement to Joint Coordination Activity on Accessibility and Human Factors (JCA-AHF)
WP 5D
2014-06-30
[ 560 ]
Reply liaison statement - IMT systems and broadband trunking communication (B-TRUNC) system for PPDR
WP 5D
2014-06-30
[ 559 ]
Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems
WP 1A
2014-06-20
[ 558 ]
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - ITU-R interest in K series Recommendations
WP 1A
2014-06-20
[ 557 ]
Liaison statement to the broadband forum (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Specifications and performance of cabling intended for use with G.fast
WP 1A
2014-06-20
[ 556 ]
Liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 4C, 5A, 5B, 5C, 6A and 7D) - Considerations on the G.9700 power spectral density (PSD) limit mask
WP 1A
2014-06-20
[ 555 ]
Liaison statement to ITU-T Study Groups 5 and 15 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Excessive levels of radio frequency noise in the environment
WP 1A
2014-06-20
[ 554 ]
Liaison statement to ITU-T Study Group 15 and CENELEC (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Ensuring that telecommunication systems that depend on the use of radio frequencies have been properly assessed for compatibility and the avoidance of harmful interference
WP 1A
2014-06-20
[ 553 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
WP 1B
2014-06-19
[ 552 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D (copy to Working Parties 1B and 1C) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
WP 1A
2014-06-19
[ 551 ]
Liaison statement to Working Party 5B (copy for information to Working Parties 5A and 5C) - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
WP 1C
240/5
2014-06-17
[ 550 ]
Liaison statement on treatment about FG-DR&NRR deliverables
ITU-T SG 2
2014-06-12
[ 549 ]
Liaison statement on coexistence of wired telecommunications with radiocommunication systems (reply to COM5-LS45)
ITU-T SG 9
2014-06-02
[ 548 ]
Liaison statement on additional information on regional regulations related to coexistence of wired telecommunication with radiocommunication systems
ITU-T SG 9
2014-06-02
[ 547 ]
Liaison statement to Working Parties 1A, 5A, 5C and 5D regarding development of a Report on out-of-band emissions in the 2 700-2 900 MHz frequency band from service operating below 2 690 MHz
WP 5B
2014-05-30
[ 546 ]
Reply liaison statement to ITU-R Joint Task Group 4-5-6-7 (copy for information to Working Party 5A) - Possible mitigation techniques to address interference to EESS (active) and radiodetermination from the potential use of the frequency bands 5 350-5 470 and/or 5 725-5 850 MHz bay WAS/RLANS
WP 5B
2014-05-30
[ 545 ]
Liaison statement to ITU-T Study Groups 5, 9, 15 and ITU-R Working Party 1A (copied for information to ITU-R Working Parties 5A, 5C, 5D and 6A) - Liaison statement on coexistence of wired telecommunications with radiocommunication systems
WP 5B
2014-05-30
Resultats:744 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
- Suivant
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):