Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 206 ]
|
Protection of SRS deep space (Earth-to-space) transitional phases from proposed FSS (space-to-Earth) emissions in the band 7 150-7 190 MHz
|
France
|
|
2013-09-25 |
|
[ 205 ]
|
Possible additional reforms on overhauling the Radio Regulation regime governing space services
|
Egypt (Arab Republic of)
|
|
2013-09-25 |
|
[ 204 ]
|
Draft revision of Recommendation ITU-R S.1503-1 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations
|
United Kingdom of Great Britain and Northern Ireland
|
|
2013-09-25 |
|
[ 203 ]
|
Draft revision of Recommendation ITU-R BO.1443-2 - Reference BSS earth station antenna patterns for use in interference assessment involving non-GSO satellites in frequency bands covered by RR Appendix 30
|
United Kingdom of Great Britain and Northern Ireland
|
|
2013-09-25 |
|
[ 202 ]
|
Proposals on the draft liaison statement to the Working Party of the Special Committee (WRC-15 agenda item 7)
|
United Kingdom of Great Britain and Northern Ireland
|
|
2013-09-25 |
|
[ 201 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S IN 29.5-30.0/19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 29.5-30.0 GHz and 19.7-20.2 GHz
|
France
,
Germany (Federal Republic of)
,
Luxembourg
,
Netherlands (Kingdom of the)
,
Norway
,
United Kingdom of Great Britain and Northern Ireland
|
|
2013-09-25 |
|
[ 200 ]
|
Earth stations on mobile platforms operating with geostationary FSS satellite networks in the 20/30 GHz band
|
Bahrain (Kingdom of)
,
Egypt (Arab Republic of)
,
Saudi Arabia (Kingdom of)
,
United Arab Emirates
|
|
2013-09-25 |
|
[ 199 ]
|
Comments on the FSS deployment model developed by WP 4A under WRC-15 AI 1.6
|
European Space Agency
,
France
|
|
2013-09-25 |
|
[ 198 ]
|
Revision to elements of CPM text for the draft CPM Report to WRC-15 agenda item 1.9.1
|
European Space Agency
|
|
2013-09-25 |
|
[ 197 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Compatibility studies related to the band 13.25-13.75 GHz between EESS (active) and FSS (s-E)
|
Luxembourg
|
|
2013-09-25 |
|
[ 196 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Compatibility studies related to the band 13.25-13.75 GHz between EESS (active) / SRS and FSS (E-s)
|
Luxembourg
|
|
2013-09-25 |
|
[ 195 ]
|
Preliminary views on WRC-15 agenda items 7
|
China (People's Republic of)
|
|
2013-09-25 |
|
[ 194 ]
|
Technical assessment of potential interference between the possible additional primary allocation in the fixed satellite service and the existing systems in the radiolocation service in the 15.4-17.3 GHz band - WRC-15 agenda item 1.6
|
United States of America
|
|
2013-09-25 |
|
[ 193 ]
|
Working document on a methodology to estimate the sensitivity of GSO FSS interference levels to the geographical location of earth stations communicating with satellites in the fixed satellite service in the 14 GHz and 29.5-30 GHz frequency bands
|
United States of America
|
|
2013-09-25 |
|
[ 192 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S IN 29.5-30.0/19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 29.5-30.0 GHz and 19.7-20.2 GHz
|
United States of America
|
|
2013-09-25 |
|
[ 191 ]
|
Working document - Technical and operational studies towards developing elements to be included in Report ITU-R S.2223 regarding earth stations on mobile platforms in the 17.3-19.7 and 27.5-29.5 GHz bands of the geostationary satellite orbit fixed-satellite service - "A comparative study/analysis of pointing and mis-pointing of fixed VSATs and Earth stations on moving platforms...
|
United States of America
|
|
2013-09-25 |
|
[ 190 ]
|
A model for the global deployment of FSS Earth stations in the band 14.0-14.5 GHz
|
United States of America
|
|
2013-09-25 |
|
[ 189 ]
|
Draft CPM Text for WRC-15 agenda item 1.6
|
United States of America
|
|
2013-09-25 |
|
[ 188 ]
|
Revisions to working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS]
|
United States of America
|
|
2013-09-25 |
|
[ 187 ]
|
Characteristics of the near-earth operations of deep-space SRS missions
|
United States of America
|
|
2013-09-25 |
|
[ 186 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3
|
United States of America
|
|
2013-09-25 |
|
[ 185 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 1
|
United States of America
|
|
2013-09-25 |
|
[ 184 ]
|
Working document - Draft CPM Text on WRC-15 agenda item 1.7 - Proposed revision of Draft CPM Text on WRC-15 agenda item 1.7
|
Canada
|
|
2013-09-24 |
|
[ 183 ]
|
Working document - Information related to WRC-15 agenda item 9.1, Issue 9.1.2 - Size of the coordination arc for triggering coordination under RR No. 9.7
|
Canada
|
|
2013-09-24 |
|
[ 182 ]
|
WRC-15 agenda item 1.6 - Sharing feasibility between FSS (Earth-to-space) and RLS in the frequency band 15.4-17.3 GHz
|
Sweden
|
|
2013-09-24 |
|
[ 181 ]
|
Sustainable frequency spectrum availability for the operation of fixed satellite service based aeronautical VSAT networks in support of the global ATM concept
|
International Civil Aviation Organization
|
|
2013-09-24 |
|
[ 180 ]
|
Proposal for preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UAS] - WRC-15 agenda item 1.5
|
Germany (Federal Republic of)
|
|
2013-09-23 |
|
[ 179 ]
|
Proposed revision of the working document towards a PDN Report ITU-R S.[FSS 7/8 GHz COMPATIBILITY] - Compatibility studies between FSS and terrestrial and other space services in the frequency bands 7150-7250 MHz (s-E) and 8400-8500 MHz (E-s)
|
United States of America
|
|
2013-09-20 |
|
[ 178 ]
|
Preliminary results for sharing between potential new FSS allocations in the frequency bands between 10-17 GHz (Region 1) and 13-17 GHz (Regions 2 and 3) and existing SRS (s-E), (E-s) and (s-s)
|
United States of America
|
|
2013-09-20 |
|
[ 177 ]
|
Draft liaison statement to ITU-R Working Party 5B - Coordination and harmful interference in FSS networks
|
United States of America
|
|
2013-09-20 |
|
[ 176 ]
|
Working documents towards a preliminary draft new [Report/Recommendation] ITU-R S.[FSS/BSS]
|
United States of America
|
|
2013-09-20 |
|
[ 175 ]
|
Further evaluation of the applicability of the value of 6% ?T/T for triggering coordination between geostationary fixed-satellite service networks
|
United States of America
|
|
2013-09-20 |
|
[ 174 ]
|
Working document towards a draft new Recommendation/Report ITU-R S.[FSS-REF FOR UAS]
|
United States of America
|
|
2013-09-20 |
|
[ 173 ]
|
Draft liaison statement to Working Party 5D - Comments from Working Party 4A on the compatibility study between fss networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments
|
United States of America
|
|
2013-09-20 |
|
[ 172 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R S.1855
|
United States of America
|
|
2013-09-20 |
|
[ 171 ]
|
Working document towards a preliminary draft new Recommendation ITU-R SF.[AREA COORD]
|
United States of America
|
|
2013-09-20 |
|
[ 170 ]
|
Interference protection of co-frequency stations from transmissions by earth stations on board vessels operating in fixed satellite service networks
|
United States of America
|
|
2013-09-20 |
|
[ 169 ]
|
Working document towards a prelimnary draft new Report on the intent and application of Recommendation ITU-R S.1432-1
|
United States of America
|
|
2013-09-20 |
|
[ 168 ]
|
Working document towards text for the draft Report to the Conference Preparatory Meeting (CPM) on WRC-15 agenda item 1.7
|
United States of America
|
|
2013-09-20 |
|
[ 167 ]
|
Futher thoughts on simplification of radio regulation regime on space services - WRC-15 agenda item 7
|
United States of America
|
|
2013-09-20 |
|
[ 166 ]
|
Draft CPM Text on WRC-12 agenda item 7 - Modifications to No. 11.49
|
United States of America
|
|
2013-09-20 |
|
[ 165 ]
|
New databank items - Addition of USASAT-70O and USASAT-71L technical characteristics to the electronic databank
|
United States of America
|
|
2013-09-20 |
|
[ 164 ]
|
Preliminary draft new Report ITU-R S.[BROADBAND BY FSS] - Broadband access by fixed-satellite service systems
|
United States of America
|
|
2013-09-20 |
|
[ 163 ]
|
Working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHz Compatibility] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)
|
United States of America
|
|
2013-09-20 |
|
[ 162 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3
|
United States of America
|
|
2013-09-20 |
|
[ 161 ]
|
Feasibility estimation for sharing between fixed-satellite service (Space-to-Earth) and Space operations service (Earth-to-Space) IN 7 GHz band
|
Russian Federation
|
|
2013-09-19 |
|
[ 160 ]
|
Sharing feasibility of the fixed satellite service (Space-to-Earth) with the Earth exploration satellite service (active) in the frequency range 13.25-13.75 GHz
|
Russian Federation
|
|
2013-09-19 |
|
[ 159 ]
|
Working document - Elements to the text of CPM Report, agenda items 9.1.2 and 7
|
Russian Federation
|
|
2013-09-19 |
|
[ 158 ]
|
Draft liaison statement to Working Party 5C - WRC-15 agenda item 1.6.1
|
Russian Federation
|
|
2013-09-19 |
|
[ 157 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 1
|
Russian Federation
|
|
2013-09-19 |
Resultats:456 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):