Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 57 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SA.1275-3 - Orbital locations of data relay satellites to be protected from the emissions of fixed service systems operating in the band 2 200-2 290 MHz
|
WP 7B
|
|
2013-09-17 |
|
[ 56 ]
(Rev.1) |
Draft new Report ITU-R SA.[SRS/AIRCRAFT 2 GHz] - Protection of SRS earth stations from transmitting aircraft stations in the 2 200-2 290 MHz band
|
WP 7B
|
|
2013-09-17 |
|
[ 55 ]
(Rev.1) |
Draft new Report ITU-R SA.[EESS-FS-7GHz] - Sharing between the EESS (Earth-to-space) and the fixed service in the 7-8 GHz range
|
WP 7B
|
|
2013-09-17 |
|
[ 54 ]
|
Note from Study Group 7 Chairman to Chairman of CPM-15
|
WP 7C
|
|
2013-09-17 |
|
[ 53 ]
(Rev.1) |
Draft new Recommendation ITU-R RS.[EESS-9GHz-CHAR] - Characteristics of synthetic aperture radars operating in the Earth exploration-satellite service (active) around 9 600 MHz
|
WP 7C
|
|
2013-09-17 |
|
[ 52 ]
|
Draft new Question ITU-R XXX/47 - Detection and resolution of radio frequency interference to Earth exploration-satellite service (passive) sensors
|
WP 7C
|
|
2013-09-17 |
|
[ 51 ]
(Rev.1) |
Draft new Report ITU-R RS.[EESS-9GHz_SPECTREQ] - Spectrum requirements for spaceborne synthetic aperture radar (SAR) applications planned in an extended allocation to the Earth exploration-satellite service (EESS) around 9600 MHz
|
WP 7C
|
|
2013-09-17 |
|
[ 50 ]
(Rev.1) |
Draft new Report ITU-R RS.[EESS-SCAT-ARNS 1 215-1 300 MHz] - Potential interference from EESS (active) scatterometers into ARNS systems in the frequency band 1 215-1 300 MHz
|
WP 7C
|
|
2013-09-17 |
|
[ 49 ]
(Rev.1) |
Draft new Recommendation ITU-R RS.[SPAC_RAD_SNDR] - Typical technical and operating characteristics for spaceborne radar sounder systems using the 40-50 MHz band
|
WP 7C
|
|
2013-09-17 |
|
[ 48 ]
|
Preliminary draft revision of Recommendation ITU-R TF.374-5 - Precise Frequency and Time-Signal Transmissions
|
WP 7A
|
|
2013-09-16 |
|
[ 47 ]
|
List of documents issued (Documents 7/20 - 7/47)
|
BR Study Group Department
|
|
2013-09-05 |
|
[ 46 ]
|
Proposed revision of Report ITU-R RS.2068 - Current and future use of the band 13.25-13.75 GHz by spaceborne active sensors
|
China (People's Republic of)
|
|
2013-09-02 |
|
[ 45 ]
|
Draft new Report ITU-R SA.[SPECTRUM REQ] - Spectrum requirements for future EESS missions operating under a protential new EESS uplink allocation in the 7/8 GHz range
|
Korea (Republic of)
|
|
2013-09-03 |
|
[ 44 ]
|
Executive Report of Working Party 7A
|
Chairman, WP 7A
|
|
2013-09-03 |
|
[ 43 ]
|
Executive Report on the April 2013 meeting of Working Party 7D (September 2013)
|
Chairman, WP 7D
|
|
2013-09-03 |
|
[ 42 ]
|
Results of the 20th RAG meeting
|
Vice-Chairman, SG 7
|
|
2013-09-02 |
|
[ 41 ]
(Rev.1) |
Review of the Questions assigned by the Radiocommunication Assembly (RA-12) to Study Group 7
|
Chairman, SG 7
|
|
2013-09-02 |
|
[ 40 ]
|
Executive Report on the April 2013 meeting of Working Party 7C ( September 2013)
|
Chairman, WP 7C
|
|
2013-09-02 |
|
[ 39 ]
|
Report on the status of Study Group 7 Handbooks (September 2013)
|
Vice-Chairman, SG 7
|
|
2013-08-29 |
|
[ 38 ]
|
Report on the status of Study Group 7 ITU-R Recommendations (September 2013)
|
Vice-Chairman SG 7
|
|
2013-08-28 |
|
[ 37 ]
|
Executive Report on the April 2013 meeting of Working Party 7B (September 2013)
|
Chairman, WP 7B
|
|
2013-08-28 |
|
[ 36 ]
|
Liaison Statement on WTSA-12 Action Plan
|
TSAG
|
|
2013-08-13 |
|
[ 35 ]
(Rev.1) |
Proposed modifications to the Handbook on space research communication
|
WP 7B
|
|
2013-06-21 |
|
[ 34 ]
|
Liaison statement to ITU-R Study Group 6 (copy to ITU-R Study Groups 1, 3, 4, 5, 7 and ITU-T Study Group 11) - Broadcasting terms and definitions
|
CCV
|
|
2013-06-11 |
|
[ 33 ]
(Rev.1) |
Draft revision of Report ITU-R RA.2099 - Radio observations of pulsars for precision timekeeping
|
WP 7D
|
|
2013-04-16 |
|
[ 32 ]
(Rev.2) |
Draft new Report ITU-R SA.[SPECTRUM REQ] - Spectrum requirements for future EESS missions operating under a potential new EESS uplink allocation in the 7/8 GHz range
|
WP 7B
|
|
2013-04-15 |
|
[ 31 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SA.1155 - Protection criteria related to the operation of data relay satellite systems
|
WP 7B
|
|
2013-04-15 |
|
[ 30 ]
(Rev.2) |
Draft new Report ITU-R SA.[PROX OPS] - Sharing conditions between space research service proximity operations links and fixed and mobile service links in the 410-420 MHz band
|
WP 7B
|
|
2013-04-15 |
|
[ 29 ]
|
Draft revision of Recommendation ITU-R SA.1414 - Characteristics of data relay satellite systems
|
WP 7B
|
|
2013-04-15 |
|
[ 28 ]
(Rev.2) |
Draft revision of Report ITU-R RS.2068 - Current and future use of the band 13.25-13.75 GHz by spaceborne active sensors
|
WP 7C
|
|
2013-04-11 |
|
[ 27 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7 and Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D as concerned Groups for WRC-15 Agenda item 1.1 - Preparations for WRC-15 Agenda item 1.1 - Technical and operational characteristics
|
JTG 4-5-6-7
|
|
2012-12-06 |
|
[ 26 ]
|
Liaison statement to ITU-R Study Groups 1, 3, 4, 5, 6 and 7 - ITU-R Study Groups Vocabulary Work
|
CCV
|
|
2012-11-16 |
|
[ 25 ]
|
Liaison statement from ITU-D Study Group 1 - Invitation to participate in and provide input to the work of the Correspondence Group on the Elaboration of a Working Definition of the Term "ICT"
|
ITU-D SG 1
|
|
2012-10-24 |
|
[ 24 ]
|
Draft Revision of Recommendation ITU-R RA.1417 - A radio-quiet zone in the vicinity of the L2 Sun-Earth Lagrange point
|
SG 7D
|
147/7
|
2012-10-10 |
|
[ 23 ]
|
Draft new Recommendation ITU-R SA.[EES/METSAT USAGE 401-403 MHz] - Basic general partitioning and sharing conditions for the band 401-403 MHz for future long-term coordinated use of data collection systems on geostationary and non-geostationary METSAT and EESS systems
|
WP 7B
|
|
2012-10-05 |
|
[ 22 ]
|
Draft new Recommendation ITU-R SA.[EES/MET DCS INTERF] - Protection criteria for non-GSO data collection platforms in the band 401-403 MHz
|
WP 7B
|
|
2012-10-05 |
|
[ 21 ]
|
Draft revision of Recommendation ITU-R SA.509-2 - Space research earth station and radio astronomy reference antenna radiation pattern for use in interference calculations, including coordination procedures, for frequencies less than 30 GHz
|
WP 7B
|
|
2012-10-05 |
|
[ 20 ]
|
Summary report of actions taken during the meeting of Radiocommunication Study Group 7
|
Chairman, SG 7
|
|
2012-05-24 |
|
[ 19 ]
|
Final List of Participants - Study Group 7 (Geneva, 8-9 May 2012)
|
Director, BR
|
|
2012-05-09 |
|
[ 18 ]
|
List of documents issued
|
BR Study Groups Department
|
|
2012-05-07 |
|
[ 17 ]
|
Review of the Questions assigned by the Radiocommunication Assembly (RA-12) to Study Group 7
|
Chairman, SG 7
|
|
2012-05-02 |
|
[ 16 ]
|
Proposed modifications to draft new Report ITU-R RS.[31.5 GHz SHARE] on sharing studies between EESS (passive) and fixed service in the band 31.5-31.8GHz
|
United Kingdom of Great Britain and Northern Ireland
|
232/7
|
2012-05-01 |
|
[ 15 ]
|
Executive Report of Working Party 7A
|
Chairman, WP 7A
|
|
2012-05-01 |
|
[ 14 ]
|
Executive report on the September 2011 meeting of Working Party 7D
|
Chairman, WP 7D
|
|
2012-04-29 |
|
[ 13 ]
|
Studies on the feasibility of achieving a continuous reference time-scale and related activities (WRC-15 Agenda item 1.14)
|
Russian Federation
|
|
2012-04-27 |
|
[ 12 ]
|
Results of WRC-12 - Science services issues
|
Chairman, SG 7
|
|
2012-04-30 |
|
[ 11 ]
|
Results of CPM15-1 - Science services issues
|
Chairman, SG 7
|
|
2012-04-30 |
|
[ 10 ]
|
Results of the Radiocommunication Assembly 2012
|
Chairman, SG 7
|
|
2012-04-30 |
|
[ 9 ]
|
Report on the September 2011 meeting of Working Party 7B with a view to its next meeting (September 2012)
|
Chairman, WP 7B
|
|
2012-04-26 |
|
[ 8 ]
|
Report on the status of Study Group 7 ITU-R Recommendations
|
Vice-Chairman, SG 7
|
|
2012-04-26 |
Resultats:132 documents Résultats :
Précédent -
1 -
2 -
3
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):