Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP4A : Contributions : 60 Ajoutés récemment -  Recherche de documents de réunion
   
[60]  Chairman's Report-Meeting 7-16 April 2008

Format

Taille

Mise à disposition

English

Word  

311808 octets 2008-05-2 [60] Annex 22- Liaison statement to Working Parties 5A and 5C - Compatibility of broadband wireless access (BWA) networks and fixed-satellite service (FSS) networks in the 3 400-4 200 MHz band

Word  

182784 octets 2008-05-2 [60] Annex 21- Note to the Director, Radiocommunication Bureau - Establishment of a database of available frequencies for use in emergency and disaster relief radiocommunications

Word  

189952 octets 2008-05-2 [60] Annex 20- Liaison statement to Working Parties 3J and 3M - Methodology for statistically calculating the interference received by the fixed service from space-to-Earth emissions

Word  

195072 octets 2008-05-2 [60] Annex 19- Liaison statement to Working Party 1B concerning WRC-11 Agenda item 1.19 - (Copy for information to Working Party 4C and Study Groups 3, 5, 6 and 7)

Word  

187392 octets 2008-05-2 [60] Annex 18- Liaison statement to Working Party 7B - Applicability of Recommendation ITU-R S.1432 to the meteorological satellite service in the frequency bands 18.1-18.4 GHz in Regions 1 and 3 and 18.0 18.3 GHz in Region 2

Word  

165376 octets 2008-05-2 [60] Annex 17- Liaison statement to Working Party 5C (copy to Working Parties 1A, 7B, 7C and 7D) - WRC-11 Agenda item 1.8

Word  

169984 octets 2008-05-2 [60] Annex 16- Liaison statement to Working Party 3J (copy to Working party 1A) - Radio Noise

Word  

188416 octets 2008-05-2 [60] Annex 15- Liaison statement to Working Parties 5A, 5C and 6X (copy for information and possible action to Working Parties 3M, 4B, 6D, 6G and 7D) - Use of the band 21.4-22 GHz for broadcasting-satellite service and associated feeder-link bands in Regions 1 and 3 - (

Word  

179712 octets 2008-05-2 [60] Annex 14- Liaison statement to Working Party 5C (copy for information and possible action to Working Parties 3M, 5A, 5B, 7B and 7C) - Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz - (WRC-11 Agenda item 1.20)

Word  

186368 octets 2008-05-2 [60] Annex 13- Draft work plan for WRC-11 Agenda item 1.13 - Use of the band 21.4-22 GHz for broadcasting-satellite service and associated feeder-link bands in Regions 1 and 3

Word  

187904 octets 2008-05-2 [60] Annex 12- Working document on short range devices operating in satellite downlink bands

Word  

21194240 octets 2008-05-2 [60] Annex 11- Working document towards a preliminary draft revision of Report ITU-R BO.2071 "System parameters of BSS between 17.3 GHz and 42.5 GHz and associated feeder links"

Word  

4275200 octets 2008-05-2 [60] Annex 10- Working document towards a preliminary draft new Report on an interference cancellation technique by adaptive array antennas for sharing between fixed satellite-service (FSS) and terrestrial radiocommunication services

Word  

863232 octets 2008-05-2 [60] Annex 09- Working document towards a preliminary draft new Report on a method to improve efficiency of spectrum/[orbit] resources in satellite communications

Word  

218112 octets 2008-05-2 [60] Annex 08- Working document towards a preliminary draft revision to Recommendation ITU-R BO.1659 on mitigation techniques for rain attenuation for broadcasting-satellite service systems in frequency bands between 17.3 GHz and 42.5 GHz

Word  

214016 octets 2008-05-2 [60] Annex 07- Working document towards a preliminary draft revision to Recommendation ITU-R BO.1776 on reference power flux-density for the broadcasting-satellite service in the band 21.4-22 GHz in Regions 1 and 3

Word  

2767872 octets 2008-05-2 [60] Annex 06- Working document towards a preliminary draft new Recommendation - Variations in earth station off-axis e.i.r.p. due to antenna pointing errors caused by movement of the vehicle mounted platform

Word  

186880 octets 2008-05-2 [60] Annex 05- Working document toward a preliminary draft new Recommendation ITU-R S.[CSREF-PATT] - Reference earth-station radiation pattern for antennas used with closely spaced1 satellites in the geostationary-satellite orbit for use in coordination and interference

Word  

312832 octets 2008-05-2 [60] Annex 04- Preliminary draft new Report ITU-R S.[MAIN LOBE] - Methodology on the modelling of earth station antenna gain in the region of the antenna main lobe and the transition region between the minimum angle of the reference antenna pattern and the main lobe

Word  

2202624 octets 2008-05-2 [60] Annex 03- Preliminary draft new Report - Compatibility of broadband wireless access (BWA) networks and fixed-satellite service (FSS) networks in the 3 400-4 200 MHz band

Word  

123904 octets 2008-04-30 [60] Annex 02- Preliminary draft revision of Recommendation ITU-R S.465-5 - "Reference earth-station radiation pattern for use in coordination and interference assessment in the frequency range 2 to about 30 GHz"

Word  

182272 octets 2008-04-30 [60] Annex 01- Preliminary draft new Recommendation ITU-R S.[XP-VSAT] - Cross-polarization reference gain pattern for linearly polarized very small aperture terminals (VSATs)

Word  

230912 octets 2008-05-14 [60] - Chairman's report on the meeting of Working Party 4A - Geneva, 7-16 April 2008
 

Document :

UIT-R WP4A  Contribution  60

Titre :

Chairman's Report-Meeting 7-16 April 2008

Reçu le :

2008-04-16

Source :

Chairman, WP 4A

Disponibilité :

Réservé aux utilisateurs TIES [UIT-R]

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2008-05-15