Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP8B : Contributions : 76 Ajoutés récemment -  Recherche de documents de réunion
   
[76]  Proposed preliminary draft new Report on the feasibility of using statistical and operational aspects in the protection criteria for radiodetermination radar systems which will be drafted in the framework of the corresponding work plan

Format

Taille

Mise à disposition

English

Word  

153088 octets 2004-08-31 [76] 
 

Document :

UIT-R WP8B  Contribution  76

Titre :

Proposed preliminary draft new Report on the feasibility of using statistical and operational aspects in the protection criteria for radiodetermination radar systems which will be drafted in the framework of the corresponding work plan

Reçu le :

2004-08-31

Source :

France

Disponibilité :

Réservé aux utilisateurs TIES [UIT-R]

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2004-08-31