Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 92 ]
|
Considerations on the power flux-density limits applicable to HIO FSS systems for protection of terrestrial services in the band 17.7-19.7 GHz
|
United Kingdom of Great Britain and Northern Ireland
|
|
2005-11-08 |
|
[ 91 ]
|
Draft CPM text for Chapter 4/1.18/2 - (Issue (B) invites ITU-R 2) - Measures to be implemented in the fixed service to mitigate interference from HIO FSS space stations in the band 17.7-19.7 GHz
|
Japan
|
|
2005-11-08 |
|
[ 90 ]
|
Considerations on PFD masks including applicability of Table 21-4 in Article 21 of the radio regulations in the frequency Band 17.7-19.7 GHz in connection with WRC-07 Agenda item 1.18
|
Japan
|
|
2005-11-08 |
|
[ 89 ]
|
Study of potential interference into fixed service receivers in the 17.7-19.7 GHz band from highly elliptical inclined orbit satellite systems
|
Canada
|
|
2005-11-08 |
|
[ 88 ]
|
Fixed service mitigation techniques related to Agenda item 1.18
|
France
|
|
2005-11-07 |
|
[ 87 ]
|
WRC-07 Agenda item 1.12 - Footnote 5.538
|
France
|
|
2005-11-07 |
|
[ 86 ]
|
Simulation results of interference from HEO FSS systems to FS systems in the 17.7-19.7 GHz band
|
Russian Federation
|
|
2005-11-03 |
|
[ 85 ]
|
Working document towards a draft CPM text for Agenda item 1.18
|
United States of America
|
|
2005-11-03 |
|
[ 84 ]
|
Working document toward draft CPM text on Resolution 141 (WRC-03) under Agenda item 1.18 for WRC-07 - Operational system parameters of Resolution 141 (WRC-03) highly-inclined orbit non-GSO fixed satellite service systems to be taken into account when computing the potential interference to fixed service receivers
|
United States of America
|
|
2005-11-03 |
|
[ 83 ]
|
Draft liaison statement to WP 4A - Possible methodology for frequency sharing between bi-directional FSS networks comprising ubiquitously deployed earth stations
|
United States of America
|
|
2005-11-03 |
|
[ 82 ]
|
Working document toward draft CPM text for Agenda item 1.8 (Resolution 122 (Rev.WRC-03)) - Chapter 4 - Fixed service including HAPS and fixed-satellite service above 3 GHz
|
United States of America
|
|
2005-11-03 |
|
[ 81 ]
|
Working document toward draft CPM text on Resolution 141 (WRC-03) under Agenda item 1.18 for WRC-07
|
United States of America
|
|
2005-11-03 |
|
[ 80 ]
|
Proposed modifications to Annex 3 to WP 4-9S Chairman's Report - PDRR ITU-R SF.1649 - Guidance for determination of interference from earth stations on vessels (ESVs) to stations in the fixed service when the ESV is within the minimum distance
|
United States of America
|
|
2005-11-03 |
|
[ 79 ]
|
Report on the second meeting of CCV
|
SG 4 Rapporteur on Vocabulary
|
|
2005-11-02 |
|
[ 78 ]
|
The principles of analyzing interference from FSS-HEO systems to FS systems
|
Russian Federation
|
|
2005-10-26 |
|
[ 77 ]
|
Working document towards WRC-07 Agenda item 1.18 - Analysis of the limits on the interference to the FS stations recommended by Recommendation ITU-R F.1495
|
Russian Federation
|
|
2005-10-26 |
|
[ 76 ]
|
Liaison statement to WP 4A and to WP 4-9S for information - Possible methodology for frequency sharing between bidirectional FSS networks comprising ubiquitously deployed earth stations
|
WP 6S
|
|
2005-10-19 |
|
[ 75 ]
|
Liaison statement to Working Party 4-9S - Rain scatter interference
|
WP 3M
|
|
2005-10-10 |
|
[ 74 ]
|
Liaison statement to Study Groups 6 and 7 and Working Parties 4-9S, 4A, 6E, 6S, 8A, 8B, 8D, 8F and 9B - Improving the international spectrum regulatory framework
|
WP 1B
|
|
2005-10-04 |
|
[ 73 ]
|
Liaison statement to Working Party 4-9s and to Working Party of the Special Committee for information
|
WP 4A
|
|
2005-06-21 |
|
[ 72 ]
|
Liaison statement to WP 4-9S and WP 6S - Possible methodology for frequency sharing between bi-directional FSS networks comprising ubiquitously deployed earth stations
|
WP 4A
|
|
2005-06-21 |
|
[ 71 ]
+Ann.1-8 |
Report on the meeting of Working Party 4-9S, 2-10 May 2005
|
Chairman, WP 4-9S
|
|
2005-05-10 |
|
[ 70 ]
|
Final list of Participants
Geneva, 2-10 May 2005
|
Director, BR
|
|
2005-05-09 |
|
[ 69 ]
|
LS to WP's 1A, 1B, 4A, 4-9S, 6E, 6M, 6S, 7B, 7C, 8A, 8B and 8F and Task Groups 1/8 and 1/9, and to JTG 6-8-9
|
WP 9D
|
|
2005-05-02 |
|
[ 68 ]
|
Liaison statement to Working Party 4-9S - Deployment characteristics of the fixed service in the band 17.7-29.7 GHz to be used for the sharing study with FSS systems using highly inclined orbits
|
WP 9D
|
|
2005-05-02 |
|
[ 67 ]
|
List of documents issued: Document 4-9S/44 - Document 4-9S/67
|
BR Study Group Department
|
|
2005-04-29 |
|
[ 66 ]
(Rev.1) |
Study on interference into fixed service receivers in Canada in the 17.7-19.7 GHz band from highly elliptical inclined orbit satellite systems
|
Canada
|
|
2005-04-26 |
|
[ 65 ]
|
Simulation results to validate the current PFD limits of radio regulations with respect to the FS protection criteria in recommendation ITU-R F.1495 in case of HEO satelittes in the 18 GHz band
|
Finland
|
|
2005-04-26 |
|
[ 64 ]
|
Proposed draft revision of Recommendation ITU-R SF.1601 - Methodologies for interference evaluation from the downlink of the fixed service using high altitude platform stations to the uplink of the fixed-satellite service using the geostationary satellites within the band 27.5-28.35 GHz
|
Korea (Republic of)
|
251/4, 218/9
|
2005-04-25 |
|
[ 63 ]
|
Analysis of pfd limits to HIO FSS systems and time distributions of interference by HIO FSS systems into FS systems in the 17.7-19.7 GHz band
|
Korea (Republic of)
|
|
2005-04-25 |
|
[ 62 ]
|
On the power flux-density limits to protect the fixed service from HEO FSS satellites emissions in the 18 GHz band
|
Brazil (Federative Republic of)
|
|
2005-04-25 |
|
[ 61 ]
|
Working document towards a draft CPM text for Agenda iem 1.18
|
France
|
|
2005-04-19 |
|
[ 60 ]
|
Working document: Considerations on pfd masks including applicability of Table 21-4 in Article 21 of the Radio Regulations in the frequency band 17.7-19.7 GHz in connection with WRC-07 agenda item 1.18
|
Japan
|
|
2005-04-19 |
|
[ 59 ]
|
Working document towards CPM text - Further results of sharing analysis in the 17.7-19.7 GHz band between NON-GSO fixed satellite service using highly inclined orbits and the fixed service
|
United States of America
|
|
2005-04-19 |
|
[ 58 ]
|
Supplementary information for Recommendation ITU-R SF.1649
|
United States of America
|
|
2005-04-19 |
|
[ 57 ]
|
Preliminary draft revison of Annex 3 to Recommendation ITU-R SF.1649 - Guidance for determination of interference from earth stations on vessels (ESVs) to stations in the fixed service when the ESV is within the minimum distance
|
United States of America
|
|
2005-04-19 |
|
[ 56 ]
|
Working document towards draft CPM text - further considerations of an existing HEO satellite system operating in the fixed-satellite service (FSS) in the frequency band 17.7-19.7 GHz
|
United States of America
|
|
2005-04-19 |
|
[ 55 ]
|
Working document toward draft CPM text on Resolution 141 (WRC-03) under agenda item 1.18 for WRC-07
|
United States of America
|
|
2005-04-19 |
|
[ 54 ]
|
Results of RAG and CVC relevant to the work of the Working Parties of Study Group 4
|
Director, Radiocommunication Bureau
|
|
2005-04-14 |
|
[ 53 ]
|
On the power flux-density limits applicable to HIO FSS systems for protection of terrestrial services in the band 17.7-19.7 GHz
|
United Kingdom of Great Britain and Northern Ireland
|
|
2005-04-14 |
|
[ 52 ]
|
Draft CPM Report structure
|
Chapter 4 Rapporteur
|
|
2005-04-12 |
|
[ 51 ]
|
Liaison statement to Working Parties 4A, 4-9S, 7C and 9D - Preliminary draft new Recommendation for deriving rain scatter interference into satellites and other elevated platform systems
|
WP 3M
|
|
2004-11-09 |
|
[ 50 ]
|
Liaison statement to WP 4-9S - Response to request for additional information concerning rain fade statistics in bands other than 37.5-40.0 GHz and 42.0-42.5 GHz
|
WP 3M
|
201/3, 208/3
|
2004-11-08 |
|
[ 49 ]
|
Response to liaison statements from WP 4-9S - Response to Documents 41/21 and 4A/129
|
WP 4A
|
|
2004-11-05 |
|
[ 48 ]
|
Liaison statement to WP 4-9S - FS protection criteria to be considered with respect to satellites using highly-inclined orbits in the 18 GHz band
|
WP 3M
|
|
2004-11-04 |
|
[ 47 ]
(Rev.1-2) |
Liaison statement to Working Parties 6S, 8D, 7B and 4-9S
|
N/A
|
|
2004-10-28 |
|
[ 46 ]
|
Liaison statement to Working Parties 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F, 9A and 9D - PDNR ITU-R SM.[EML] - Index for evaluation of the effect of interference between radio communication networks operating in a shared frequency band
|
WP 1B
|
|
2004-10-21 |
|
[ 45 ]
|
Liaison statement from Study Group 1 to Working Parties 4A, 4-9S and 9B and Study Groups 7 and 8 for action and to Study Group 6 and the CVC for information
|
SG 1
|
|
2004-10-20 |
|
[ 44 ]
+Ann.1-8 |
Report on the meeting of Working Party 4-9S, Geneva, 4-11 October 2004
|
Chairman, WP 4-9S
|
|
2004-10-08 |
|
[ 43 ]
|
Final List of Participants - Working Party 4-9S
|
Director, BR
|
|
2004-10-07 |
Resultats:192 documents Résultats :
Précédent -
1 -
2 -
3 -
4
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):