Contribuciones
[ AI/Cuestión: Q2/5 ] |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 854 ]
|
Reply template to cover sheet of T17-SG05-211130-TD-GEN-1984 received liaison
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-11-16 |
|
[ 835 ]
|
Discussion on exception conditions included in K.21, K.45 "Resistibility of telecommunication equipment installed in customer premises, access and trunk networks to over voltages and over currents"
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2021-11-15 |
|
[ 834 ]
|
Discussion on future revision of K.Sup.24: "Rationale for setting resistibility requirements of telecommunication equipment installed in a telecommunication centre against lightning"
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2021-11-15 |
|
[ 824 ]
(Rev.1) |
AAP K.147 comments on Annex A, Annex B and Bibliography
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-11-14 |
|
[ 823 ]
(Rev.1) |
AAP K.147 comments on Clause 9
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-11-14 |
|
[ 822 ]
(Rev.1) |
AAP K.147 comments on Clause 7 and 8
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-11-14 |
|
[ 821 ]
(Rev.1) |
AAP K.147 comments on Clause 6
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-11-14 |
|
[ 820 ]
(Rev.1) |
AAP K.147 comments on Title, Scope, Normative References and Definitions
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-11-14 |
|
[ 809 ]
|
ITU-T K.117 - Long reach single twisted-pair Ethernet resistibility testing
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-04-28 |
|
[ 800 ]
|
Correction of Figure 3 drawing error in K.50 Amendment 1(06/2020)
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-04-28 |
|
[ 783 ]
|
Proposal for clarification of K.20 "Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents"
|
Nokia Corporation (Finland)
|
Q2/5
|
2021-04-27 |
|
[ 776 ]
(Rev.1) |
Revision of Series K Supplement 22 "Rationale of resistibility of telecommunication equipment installed in the access and trunk networks against lightning"
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2021-04-27 |
|
[ 775 ]
(Rev.1) |
Proposed revision of K.Sup.21 "Rationale for setting resistibility requirements of telecommunication equipment installed in customer premises against lightning"
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2021-04-27 |
|
[ 774 ]
(Rev.1) |
Draft Supplement ITU-T K.20 (K.Sup.telecom_centre):"Rationale for setting resistibility requirements of telecommunication equipment installed in a telecommunication centre against lightning"
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2021-04-27 |
|
[ 752 ]
|
Ethernet terms from ISO/IEC
|
Bourns Limited (United Kingdom)
|
Q8/5, Q2/5
|
2021-04-09 |
|
[ 751 ]
(Rev.1) |
IEEE-SA 802.3 content licencing for ITU-T Recommendation K.147
|
Bourns Limited (United Kingdom)
|
Q8/5, Q2/5
|
2021-04-07 |
|
[ 750 ]
|
Phantom powering
|
Bourns Limited (United Kingdom)
|
Q8/5, Q2/5
|
2021-04-06 |
|
[ 749 ]
(Rev.1) |
Simplifying K.147 Tables 2 and 3 to show just the protection parameters
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-03-27 |
|
[ 748 ]
(Rev.1) |
Simplifying K.147 Annex A
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-03-22 |
|
[ 746 ]
(Rev.1) |
Objectives of K.147 and comments on SG05-C-0745
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-03-19 |
|
[ 745 ]
(Rev.1) +Add.1 |
ITU-T Rec. K.147 (06/2020) Ethernet port resistibility testing for overvoltages and overcurrents
|
IEEE (IEEE 802.3)
|
Q2/5
|
2021-03-16 |
|
[ 734 ]
(Rev.2) |
Proposed single pair Ethernet (SPE) protector resistibility testing supplement for ITU-T Recommendation K.117: "Primary protector parameters for the surge protection of equipment Ethernet ports"
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-10-06 |
|
[ 731 ]
(Rev.1) |
Proposed Ethernet port isolation and insulation supplement for ITU-T Recommendation K.147 Ethernet port resistibility testing for overvoltages and overcurrents
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-10-06 |
|
[ 730 ]
|
Proposed Corrigendum 1 to ITU-T Recommendation K.50
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-10-06 |
|
[ 729 ]
|
Proposed Corrigendum 1 to ITU-T Recommendation K.44
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-10-06 |
|
[ 717 ]
|
Proposed Corrigendum 1 to ITU-T Recommendation K.147
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-10-05 |
|
[ 710 ]
(Rev.1) |
Draft Supplement ITU-T K.20 (K.Sup.telecom_centre):"Rationale for setting resistibility requirements of telecommunication equipment installed in a telecommunication centre against lightning"
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2020-10-05 |
|
[ 709 ]
(Rev.1) |
Draft Supplement to ITU-T K.45 (K.Sup.access_trunk_networks): "Technical rationale of resistibility of telecommunication equipment installed in the access and trunk networks against lightning"
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2020-10-05 |
|
[ 708 ]
|
K.Sup.customer to-ITU-T-K.21 on "Rationale for setting resistibility requirements of telecommunication equipment installed in customer premises against lightning": 4th draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2020-10-05 |
|
[ 705 ]
|
An issue to be considered when applying CDN for surge immunity test in IEC 61000-4-5
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q4/5, Q2/5
|
2020-10-05 |
|
[ 684 ]
|
Proposed a new work item on K.spc - "Surge protection principle and application of widely used surge protective components (SPCs)"
|
Xiamen SET Electronics Co., Ltd (China)
|
Q2/5
|
2020-09-29 |
|
[ 675 ]
(Rev.1) |
A.1 justification for proposed draft new Recommendation K.gm
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-28 |
|
[ 674 ]
(Rev.1) |
Outline of K.gm: Test Methods and preferred values for hybrid integrated circuit components containing gas discharge tube and metal oxide varistor technologies
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-28 |
|
[ 666 ]
(Rev.1) |
K.Eth: Ethernet port resistibility testing for overvoltages and overcurrents
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-28 |
|
[ 657 ]
(Rev.1) |
Revised K.64 Base Text to align with new safety standards
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-28 |
|
[ 656 ]
(Rev.1) |
Anomaly in Annex A of K.21 and K.45
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-28 |
|
[ 642 ]
(Rev.1) |
K.Sup.access_trunk_networks to-ITU-T-K.45 on"Technical rationale of resistibility of telecommunication equipment installed in the access and trunk networks against lightning": 3rd draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2020-04-27 |
|
[ 641 ]
|
K.Sup.telecom_centre to-ITU-T-K.20 on"Rationale for setting resistibility requirements of telecommunication equipment installed in a telecommunication centre against lightning": 3rd draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2020-04-27 |
|
[ 640 ]
(Rev.1) |
K.Sup.customer to-ITU-T-K.21 on "Rationale for setting resistibility requirements of telecommunication equipment installed in customer premises against lightning": 3rd draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2020-04-27 |
|
[ 634 ]
|
An issue to be considered when applying CDN for surge immunity test in IEC 61000-4-5
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q4/5, Q2/5
|
2020-04-27 |
|
[ 612 ]
(Rev.1) |
Proposed Corrigendum 2 to Recommendation ITU-T K.98
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-20 |
|
[ 609 ]
|
Proposed Amendment 1 to Recommendation ITU-T K.50
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-03-30 |
|
[ 601 ]
(Rev.1) |
Proposal for the revision of Table 7 of K.20 "Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents"
|
Nokia Corporation (Finland)
|
Q2/5
|
2019-09-03 |
|
[ 563 ]
(Rev.1) |
K.Sup.access_trunk_networks to-ITU-T-K.45 on"Technical rationale of resistibility of telecommunication equipment installed in the access and trunk networks against lightning": 2nd draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2019-09-02 |
|
[ 562 ]
(Rev.1) |
K.Sup.telecom_centre to-ITU-T-K.20 on"Rationale for setting resistibility requirements of telecommunication equipment installed in a telecommunication centre against lightning": 2nd draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2019-09-02 |
|
[ 561 ]
(Rev.1) |
K.Sup.customer to-ITU-T-K.21 on "Rationale for setting resistibility requirements of telecommunication equipment installed in customer premises against lightning": 2nd draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2019-09-02 |
|
[ 557 ]
|
K.spdsafe: seventh draft of "Guidance on safety relating to the use of surge protective devices and surge protective components in telecommunication terminal equipment" aiming consent.
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2019-09-02 |
|
[ 539 ]
|
Directives Volume VIII review
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2019-08-22 |
|
[ 504 ]
|
Request of correction of Recommendation K.20 (10/2018) "Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents"
|
Nokia Corporation (Finland)
|
Q2/5
|
2019-04-30 |
|
[ 495 ]
|
Proposed new work item on draft Supplement ITU-T K.Sup.telecom_system to ITU-T K.44 "Causes of telecommunication system overvoltage and overcurrent conditions and their expected levels"
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2019-04-30 |
Resultados :181 documentos Resultados :
1 -
2 -
3 -
4
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):